Happy to help 


And you'll pay for this how?
The HSTs effectively are the solution you propose, but as we know the leasing arrangements are an impediment on their use.
As for removing Voyagers from Aberdeen - Penzance, I'm not sure what difference 1 train per day would make! Also the passenger loadings outside the core wouldn't justify it. My experience is that a dogbox could cope with the passengers from Aberdeen to Edinburgh and Plymouth to Penzance on that service!
Well whatever way Arriva payed for the loco hauled services in Wales
You mean by using money from the Welsh Government? I'm not sure why the Welsh Government would fund services that spend their time in England and Scotland?
![]()
5) Sort out the fares....HIGH PRIORITY!....a lot of people seem to be moaning about this on this thread and clearly the current system isn't working!
Perhaps the East Coast Mainline Cross Country services could terminate at York.
Perhaps the East Coast Mainline Cross Country services could terminate at York. 100/110 EMUs could then be used for the York-Edinburgh-Glasgow route. This would reduce operating costs north of York and make more carriages available for peak services. If this left Cross Country with too much stock, some Voyagers could be transfered to other operators to help reduce the national DMU shortage problem.
I don't think you have explained how you intend to do this.
Here's one for you then. ECS from Stanstead airport towards new street comes through formed of 2 x 2 car 170's, a couple of minuites later, the next train is cancelled due to staff shortages, yet they can afford the ECS?
Yes that would be a suitable option for now. But im thinking electric stock and wires in the future.Does it need brand new stock or simply hand-me-down stuff from elsewhere with more capacity? What about the 222's at some point?
Also HST's coming off-lease from FGW - one assumes that the final day of operation for most of the South Wales HST's is not exactly the same day as the last possible economical day of use for this stock. Especially as HST operation will continue in the South West anyway. So cascaded HST's could 'buy' another 5 or so years for XC whilst we await better 'quality' cascades.
There is no proof that there are paths yet between Bletchley and MK so everyone is jumping the gun with this.
Some posts say they want longer trains on Aberdeen-Penzance which is more expensive but want cheaper fares. This doesn't work.
This is only a problem if the demand doesn't exist and you are paying for massive overcapacity. A potential issue at the extreme ends of the XC network but I'm not sure how big a deal this is really. Sure it carries fresh air for 2 hours at each end of the trip but for the main 10 hour run in between the additional capacity makes your service much more appealing for additional customers.
Bit surely that leads you to the conclusion XC already seem to have come to; strengthen services in the core eg double Voyager/HST between Edinburgh/Newcastle and Bristol/Plymouth...
Bit surely that leads you to the conclusion XC already seem to have come to; strengthen services in the core eg double Voyager/HST between Edinburgh/Newcastle and Bristol/Plymouth...
Then your unstrengthened diagrams are the ones working to the very extremities of the network.
The work at Reading station means that from Easter this year, doubled Voyagers or HSTs can now run on Crosscountry services via Reading because they all now use the longer platforms and not the shorter bays.
As part of West Coast route mod yes, doesn't mean you block out paths for years for something that still isn't set in stone (which you can't anyway).The platform was built ready for it at MK though wasn't it
Depends how they do it, saying it is full and we need to do this to fix it, is different and happens quite often.And after the go-ahead for the rebuild has been confirmed, it would be both political and career suicide for Network Rail to say "oops sorry, there's no room".
Many here mention that the current XC franchise is losing money. How is that possible considering that they charge some of the highest fares out there?
XC has the highest subsidy of all the long-distance TOCs.
They are also underperforming against the revenue profile and are in maximum revenue support.
That means neither Arriva nor DfT want to invest in the service.
Salvation was at hand when VT planned to replace their Voyagers in the failed WCML franchise bid last year. This would have freed up 21x221s by 2016 for the next XC franchise.
We currently don't know how the franchise extension negotiations are going.
If VT aren't going to get new electric stock then XC are stuck with what they've got.
XC also now has the prospect of an extension to 2019, but negotiations haven't started as the current deal runs to 2016 (which is also the date all the Voyager leases run out).