• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

What is wrong with CrossCountry?

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

SussexSpotter

Member
Joined
25 Oct 2009
Messages
322
Location
Sussex
And you'll pay for this how?

The HSTs effectively are the solution you propose, but as we know the leasing arrangements are an impediment on their use.

As for removing Voyagers from Aberdeen - Penzance, I'm not sure what difference 1 train per day would make! Also the passenger loadings outside the core wouldn't justify it. My experience is that a dogbox could cope with the passengers from Aberdeen to Edinburgh and Plymouth to Penzance on that service!

Well whatever way Arriva payed for the loco hauled services in Wales, and by hiring in some loco's from DB Schenker.....but seeing as bringing back loco hauled has been dismissed on here as not being a good idea due to timetable issues then I don't really know what else to suggest really.....

In some ways I do feel sorry for the management at XC. They can be held accountable for some of the things which is why I suggested the management is the issue but there is after all things which little can be done about. I think anyone whoever was incharge would find it difficult to sort some of it out, I suppose sometimes you just have to make the best of the little that you have......

I wonder how different things would be now though if Virgin XC has kept the franchise....one can only wonder! ;)
 
Last edited:

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,076
Location
Redcar
Well whatever way Arriva payed for the loco hauled services in Wales

You mean by using money from the Welsh Government? I'm not sure why the Welsh Government would fund services that spend their time in England and Scotland?

;)
 

JamesRowden

Established Member
Joined
31 Aug 2011
Messages
1,762
Location
Ilfracombe
Perhaps the East Coast Mainline Cross Country services could terminate at York. 100/110 mph EMUs could then be used for the York-Edinburgh-Glasgow route. This would reduce operating costs north of York and make more carriages available for peak services. If this left Cross Country with too much stock, some Voyagers could be transfered to other operators to help reduce the national DMU shortage problem.
 
Last edited:

OxtedL

Established Member
Associate Staff
Quizmaster
Joined
23 Mar 2011
Messages
2,631
5) Sort out the fares....HIGH PRIORITY!....a lot of people seem to be moaning about this on this thread and clearly the current system isn't working!

I don't think you have explained how you intend to do this.
 

SussexSpotter

Member
Joined
25 Oct 2009
Messages
322
Location
Sussex
Perhaps the East Coast Mainline Cross Country services could terminate at York. 100/110 EMUs could then be used for the York-Edinburgh-Glasgow route. This would reduce operating costs north of York and make more carriages available for peak services. If this left Cross Country with too much stock, some Voyagers could be transfered to other operators to help reduce the national DMU shortage problem.

I'm not convinced by your suggestion of terminating XC services at York. If you were to terminate them there, I doubt many Scottish passengers would be too pleased at that......and look at how many through journey's you would be chopping....!

I don't think you have explained how you intend to do this.

To be perfectly honest with you I don't really know how I would intend to do this, I just suggested it as something that I would sort out if I were to manage XC differently. It would take a lot of time and thought and it's not as simple as ''Right, lets sort out the fares this way and that way''....The fares system is very complicated as I think we all know and you'd have to look at each different route and see what could and could not be changed....
 
Last edited:

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
The only issues I can see with XC is the fact that the 220s/221s are far too short to run services in the core, ideally I reckon if both fleets were extended to 9 or 10 cars then a lot of the overcrowding would disappear so instead of doubling up services, services would use a single unit but hopefully this would mean more services being able to run.

The other issue I see with them as I'm bias here is running 2 car 170s on Birmingham to Stansted and running Birmingham to Leicesters services which should be extended to Stansted to offer a half hourly service between Birmingham and Stansted.

That said the Stansteds really ought to be 4 coaches long, I know there are platform issues at certain locations but its not acceptable to run 2 car trains on a airport service.
 

Goatboy

Established Member
Joined
23 Jun 2011
Messages
2,274
Another XC HST today.

I've decided that all thats wrong with XC, well other than the daft fares, is the Voyagers. I can't remember ever having anything other than a pleasant journey on an XC HST.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,281
Who will pay for all this new diesel stock?

The only chance SW-Scotland services have is frankly 5-car IEPs.
A bit more capacity and drastically reduced running costs compared to Voyagers.
 

TheWalrus

Established Member
Joined
6 Oct 2008
Messages
2,069
Location
UK
Like I have said before I think infill electrification and new electric stock maybe 6 or 7 cars and also 2x5 cars for peaks splitting to a single unit for quieter sections. Have just 1 service per day to Penzance/Aberdeen operating in/out of Plymouth/Edinburgh during the peaks so passengers benefit from extra capacity during busier times and also the operator benefits from a greater load on their service.
 

Goatboy

Established Member
Joined
23 Jun 2011
Messages
2,274
Does it need brand new stock or simply hand-me-down stuff from elsewhere with more capacity? What about the 222's at some point?

Also HST's coming off-lease from FGW - one assumes that the final day of operation for most of the South Wales HST's is not exactly the same day as the last possible economical day of use for this stock. Especially as HST operation will continue in the South West anyway. So cascaded HST's could 'buy' another 5 or so years for XC whilst we await better 'quality' cascades.
 

Trainfan344

Established Member
Joined
13 Oct 2012
Messages
2,305
Here's one for you then. ECS from Stanstead airport towards new street comes through formed of 2 x 2 car 170's, a couple of minuites later, the next train is cancelled due to staff shortages, yet they can afford the ECS?
 
Joined
9 Feb 2009
Messages
807
Here's one for you then. ECS from Stanstead airport towards new street comes through formed of 2 x 2 car 170's, a couple of minuites later, the next train is cancelled due to staff shortages, yet they can afford the ECS?

Almost certainly the ECS is the cancelled train (due to lack of senior conductor)....
 

TheWalrus

Established Member
Joined
6 Oct 2008
Messages
2,069
Location
UK
Does it need brand new stock or simply hand-me-down stuff from elsewhere with more capacity? What about the 222's at some point?

Also HST's coming off-lease from FGW - one assumes that the final day of operation for most of the South Wales HST's is not exactly the same day as the last possible economical day of use for this stock. Especially as HST operation will continue in the South West anyway. So cascaded HST's could 'buy' another 5 or so years for XC whilst we await better 'quality' cascades.
Yes that would be a suitable option for now. But im thinking electric stock and wires in the future.

Some of the ideas on here are slightly conflicting. Some posts say they want longer trains on Aberdeen-Penzance which is more expensive but want cheaper fares. This doesn't work. Overcrowded trains isn't much of an incentive to reduce fares. Really there needs to be a review of service provision, capacity required and fares strategy to work out a way forward for XC.
 

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,933
I've seen a few trains from Stansted or Cambridge run ECS in the path of the passenger over the last few months, in all cases because of the lack of a guard. XC, to their credit, have done their best - in at least one case, getting a guard over to Melton to meet the train there to run forwards in service.
 

route:oxford

Established Member
Joined
1 Nov 2008
Messages
4,949
There is no proof that there are paths yet between Bletchley and MK so everyone is jumping the gun with this.

The platform was built ready for it at MK though wasn't it?

And after the go-ahead for the rebuild has been confirmed, it would be both political and career suicide for Network Rail to say "oops sorry, there's no room".

It's probably going to be one of the biggest changes to the passenger-flow paradigm outside London since the mass closure of lines in the 60s.

As an example, it'll knock nearly an hour off a journey between Oxford & Chester
 

Goatboy

Established Member
Joined
23 Jun 2011
Messages
2,274
Some posts say they want longer trains on Aberdeen-Penzance which is more expensive but want cheaper fares. This doesn't work.

Actually in fundamental terms it does - the train costs £x to run (And yes, figure £x will increase if you make it longer), the more people you can tempt onto it, the more revenue you can generate.

This is why capacity is such a big thing for airlines. Emirates operate a 380 instead of a 737-800 on flights to Dubai because the more people they can comfortably carry the more profitable the flight will be even after the increased costs associated with the larger aircraft. In rail terms you'll find the cost per seat of operating a 2 car 170 is not lower than the cost per seat of operating a 4 car 170. Infact probably quite the opposite.

This is only a problem if the demand doesn't exist and you are paying for massive overcapacity. A potential issue at the extreme ends of the XC network but I'm not sure how big a deal this is really. Sure it carries fresh air for 2 hours at each end of the trip but for the main 10 hour run in between the additional capacity makes your service much more appealing for additional customers.
 

IanXC

Emeritus Moderator
Joined
18 Dec 2009
Messages
6,611
This is only a problem if the demand doesn't exist and you are paying for massive overcapacity. A potential issue at the extreme ends of the XC network but I'm not sure how big a deal this is really. Sure it carries fresh air for 2 hours at each end of the trip but for the main 10 hour run in between the additional capacity makes your service much more appealing for additional customers.

Bit surely that leads you to the conclusion XC already seem to have come to; strengthen services in the core eg double Voyager/HST between Edinburgh/Newcastle and Bristol/Plymouth...

Then your unstrengthened diagrams are the ones working to the very extremities of the network.
 

Goatboy

Established Member
Joined
23 Jun 2011
Messages
2,274
Bit surely that leads you to the conclusion XC already seem to have come to; strengthen services in the core eg double Voyager/HST between Edinburgh/Newcastle and Bristol/Plymouth...

Rarely ever a double Voyager as far down as Plymouth. The very busy services - ie the 16:25 off Plymouth - is usually a 4 coach Voyager and standing on departure on Fridays. If you've not made a reservation before about 10 days out you are often lucky to get one.

Most double Voyagers go no further down than Bristol Temple Meads and are usually accompanied by almost zero passenger information about which portion to use until you get to Bristol and find by the time you've moved units, all the seats have gone.
 

JamesRowden

Established Member
Joined
31 Aug 2011
Messages
1,762
Location
Ilfracombe
Bit surely that leads you to the conclusion XC already seem to have come to; strengthen services in the core eg double Voyager/HST between Edinburgh/Newcastle and Bristol/Plymouth...

Then your unstrengthened diagrams are the ones working to the very extremities of the network.

The work at Reading station means that from Easter this year, doubled Voyagers or HSTs can now run on Crosscountry services via Reading because they all now use the longer platforms and not the shorter bays.
 

SussexSpotter

Member
Joined
25 Oct 2009
Messages
322
Location
Sussex
The work at Reading station means that from Easter this year, doubled Voyagers or HSTs can now run on Crosscountry services via Reading because they all now use the longer platforms and not the shorter bays.

How many actually run as doubles though????
 
Last edited:

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,653
The platform was built ready for it at MK though wasn't it
As part of West Coast route mod yes, doesn't mean you block out paths for years for something that still isn't set in stone (which you can't anyway).

And after the go-ahead for the rebuild has been confirmed, it would be both political and career suicide for Network Rail to say "oops sorry, there's no room".
Depends how they do it, saying it is full and we need to do this to fix it, is different and happens quite often.
 

VT_Valenta

Member
Joined
7 Dec 2012
Messages
27
Location
Plymouth
Got 1944 XC Voyager from BRI - PLY Yesterday. A few things:

- Vestibule stank (like, more than normal) of cleaning fluid and festering sewage because (point 2)
- THE HEATING WAS ON IN THE VESTIBULE. The F*?

The saloons were all nice and cool, but every time someone opened the door a sauna like effect occurred where hot air rushed in and made everyone sniff the lovely superclean pine.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,203
Location
Bolton
I am currently writing you from aboard the 08:27 Manchester Piccadilly to Bournemouth service, which has 5 coaches, is lightly loaded and has working air conditioning. Every seat I have seen is reserved but I'm lucky in that mine is too. There's a group of business people who I think may be going to a conference in Birmingham or something, whom I feel a bit sorry for because there are only about 10 of them and they are spread throughout 3 coaches. When I got on, the usual smell assailed my nostrils. IT'S SAD that I think 'oh well you can't have everything' at that. Why can't we aim a bit higher? You can have a train, on occasion, that's on time, not overcrowded and comfortable, but only if it smells of s**t.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,903
Location
Mold, Clwyd
Many here mention that the current XC franchise is losing money. How is that possible considering that they charge some of the highest fares out there?

XC has the highest subsidy of all the long-distance TOCs.
They are also underperforming against the revenue profile and are in maximum revenue support.
That means neither Arriva nor DfT want to invest in the service.

Salvation was at hand when VT planned to replace their Voyagers in the failed WCML franchise bid last year. This would have freed up 21x221s by 2016 for the next XC franchise.
We currently don't know how the franchise extension negotiations are going.
If VT aren't going to get new electric stock then XC are stuck with what they've got.
XC also now has the prospect of an extension to 2019, but negotiations haven't started as the current deal runs to 2016 (which is also the date all the Voyager leases run out).
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
XC has the highest subsidy of all the long-distance TOCs.
They are also underperforming against the revenue profile and are in maximum revenue support.
That means neither Arriva nor DfT want to invest in the service.

Salvation was at hand when VT planned to replace their Voyagers in the failed WCML franchise bid last year. This would have freed up 21x221s by 2016 for the next XC franchise.
We currently don't know how the franchise extension negotiations are going.
If VT aren't going to get new electric stock then XC are stuck with what they've got.
XC also now has the prospect of an extension to 2019, but negotiations haven't started as the current deal runs to 2016 (which is also the date all the Voyager leases run out).

If they charge high fares and the trains are packed, how come they make a loss? The foregoing posts just don't seem to match with your sentence: -

'They are also underperforming against the revenue profile and are in maximum revenue support.'

They must have submitted a revenue plan to have been awarded the franchise originally.
 
Status
Not open for further replies.

Top