and it may be vibration reduction for buried services that pass under the track bed at the station.I think you will find it's something to do with noise and vibration absorption.
EAST LONDON LINE EXTENSION
LOCATION
New Railway Line Surrey Quays Station Rotherhithe
CLIENT Transport for London
Abbey Pynford constructed piled foundations for a new slab to protect existing sewers that run below the tracks and also for temporary works to support the railway cutting. Over 100 piles were installed each of 450mm diameter to a depth of 14m. The piles were cased to 7m depth due to there being unstable ground conditions. The piles for the temporary works were installed as a contiguous piled wall.
The station had a very unique method of access which meant loading all the necessary equipment onto a road railer at the end of the line and driving it down the track into the station. We also had to get our concrete delivered into site in the same way for part of the works which required careful planning and cooperation with the other contractors on site. This offers a textbook example of Abbey Pynford’s ability to meet challenging demands on site