Could be a hoist to allow a worker to be craned down, I believe we have something similar at work near a drain.


That does make things clearer. The pump will be a submersible one near the bottom of the covered pit. The green flexible hose connects the pump output to the fixed pipework. There will be a non-return valve before the blue isolating valve so that if the pump is not operating but others are, water won't flow from the pipeline into the pump and its pit, but will let the water pass from the pump into the pipeline. The jib will have lifting equipment attached to it as required - judging by the graffiti there would be a risk of any permanent equipment being vandalised!Visited New Eltham Station today, where one of these installations can be easily seen from two road bridges at the country end of the station. A supply cubicle at street level was marked 'New Eltham Track Drainage Pump Station', and a quick Google revealed that it's purpose was to solve historic water-logging problems in severe weather which lead to temporary speed restrictions in the area.
In the second image you can see a blue cover over a presumably deep pit. As suggested above, the jib must be to either allow for equipment at the bottom of the pit to removed/inserted or to allow access to service/inspect the equipment.
View attachment 111006View attachment 111007
I was thinking that if the blue cover was dispensed with there might be a reduction in tagging attacks !.That does make things clearer. The pump will be a submersible one near the bottom of the covered pit. The green flexible hose connects the pump output to the fixed pipework. There will be a non-return valve before the blue isolating valve so that if the pump is not operating but others are, water won't flow from the pipeline into the pump and its pit, but will let the water pass from the pump into the pipeline. The jib will have lifting equipment attached to it as required - judging by the graffiti there would be a risk of any permanent equipment being vandalised!