The line through Rotherham Central may not have many scheduled long-distance trains through it, but it's got a passenger train each way every 20 minutes, and is an obvious candidate for electrification as both a short diversionary route and an opportunity to run electric local trains if MML electrification was extended to Leeds and Doncaster. None of that would have seemed like a particularly unreasonable plan at the point the project was set up. In any case part of the costs were paid for specifically on the basis that it would be test-bed for further shared-use schemes, which may well have been electrified already.
It is definitely not a freight line.
The section south of the chord connecting Rotherham Central to the main line north of Sheffield is predominantly a freight line.
Between said chord and the proposed tram terminus at Parkgate is a distance of approximately 1800m, on a twin track alignment.
Even if 25kV was going to be installed soon on the line through Rotherham Central, they would only save roughly a maximum of ~£5-6m compared to simply gas axing down the tram equipment and installing 25kV equipment from scratch. And that assumes twin track goes all the way to the Parkgate stop which is probably unlikely given that it is a terminus of a relatively low intensity service only a few hundred metres north of Central.
The problem with short diversionary routes is, that although they tend to be cheaper to provide, they also only bypass a relatively short section of track and as such the chances that they will be in action whilst the route they bypass will not also falls significantly.
And I am well aware that it is a test-bed scheme, however this does raise the question as to what situation do they expect to use such equipment in in the future?
Can you name many places where a line that is not currently electrified but will be need to be electrified at 25kV, but currently has no business case for and thus will need to be electrified at 750Vdc in the interim?
There really aren't many such places.
Its an incredibly niche technology which has cost an awful lot to develop, but has almost no actuall applicability in the real world.