Callumphillips
Member
Here's an idea of how I think HS2 should be:
Route
As much as it will add to the currently soaring cost, I believe it is necessary to complete HS2 & NPR in full with high speed lines extending HS2 to HS1, Heathrow Airport, Scotland, Newcastle and certainly Leeds by means of the Eastern Leg.
Not only this, but we also can't put this much pressure on 1 two track route. We need something more, to either quadruple the London to Birmingham section or to build something along the lines of what Greengauge 21 proposed with a line heading off to the east. We can't over-estimate two tracks between London and Birmingham.
Services
Here's an idea of how I think the service pattern should be:
Route
As much as it will add to the currently soaring cost, I believe it is necessary to complete HS2 & NPR in full with high speed lines extending HS2 to HS1, Heathrow Airport, Scotland, Newcastle and certainly Leeds by means of the Eastern Leg.
Not only this, but we also can't put this much pressure on 1 two track route. We need something more, to either quadruple the London to Birmingham section or to build something along the lines of what Greengauge 21 proposed with a line heading off to the east. We can't over-estimate two tracks between London and Birmingham.
Services
Here's an idea of how I think the service pattern should be:
- 2tph - 400m - London to Birmingham
- 1tph - 200m - London to Chester (6tpd continue to Holyhead via an electrified North Wales Main Line)
- 2tph - 400m - London to Liverpool
- 2tph - 400m - London to Manchester via Crewe
- 1tph - 200m - London to Manchester via Macclesfield
- 1tph - 200m - London to Blackpool (6tpd - 2 x 200m - London to Blackpool and Southport - dividing at Wigan Central)
- 2tph - 400m - London to Leeds
- 1tph - 200m - London to Hull
- 2tph - 400m - London to Newcastle
- 2tph - 400m - London to Glasgow
- 2tph - 400m - London to Edinburgh