jamesst
Established Member
There are literally no plans to remove it.Can someone please explain why the third rail is going to be removed? This doesn’t make much sense to me.
There are literally no plans to remove it.Can someone please explain why the third rail is going to be removed? This doesn’t make much sense to me.
Thought that would be the case. Seemed very strange.There are literally no plans to remove it.
I'm not sure why you would think that when all 3 councils already have stations in their areas with direct trains to Liverpool.As for the discussion re Councils... West Lancashire, Chorley and South Ribble have collectively voted to form a single Unitary area. While it remains to be seen if the Government imposes Preston into this mix, I think it's at least possible that such a Council would have a little more interest in interface with the Liverpool City Region (and Bee Network for that matter) than LCC has done hitherto.
Why would they remove power thats already been installed, bizarre.The third rail will eventually be removed from the Chester area entirely, probably when the next major infrastructure renewals are due.
You don't need an extra platform at Chester, you just need the ability to put Merseyrail in a platform other than 7.
Even if the third rail was to stay (which it won't) - you'd just electrify platform 4 instead.
Operationally Bidston is an unsuitable terminus though as the Wrexham train has to occupy a though platform and, if running late, it may delay a West Kirby train.You would still be able to interchange at Bidston I would have thought?
It might be possible to fit an extra Merseyrail platform in if you move the Down Through closer to the station. Then put a platform in the gap between the Down Through and Down & Up Goods. This could be third rail to enable the XX:15 & XX:45 services to be moved to platform 8 and providing greater standing time at Chester.
I agree with Tazi that you don't need more platforms at Chester. What you need is better track layouts that enable flexibility. Simple option for Chester is to throw in a set of points between platform 7A and 7B onto the Down Through. Bingo, you have solved any Merseyrail problem as there is then 2 platforms and trains can come in and out from both. Potentially here the is a chance of an Aberdare style system of drop off on 7A, pick up on 7B. Or it just means 7A is an 'if needed' platform for Merseyrail and at other times TFW can use 7A better rather than almost everything being forced through 4 or having to sit outside the station waiting for Merseyrail to leave.You don't need an extra platform at Chester, you just need the ability to put Merseyrail in a platform other than 7.
Even if the third rail was to stay (which it won't) - you'd just electrify platform 4 instead.
Maybe because the trains can run on batteries? Cheaper to maintain across both infrastructure and rolling stock?Why would they remove power thats already been installed, bizarre.
Presumably it costs more money for a train with batteries than one without or to retrofit them?Maybe because the trains can run on batteries? Cheaper to maintain across both infrastructure and rolling stock?
Not quite sure what you mean here: please could you expand a little?I'd say the best way to serve Burscough is to extend to Burscough Bridge without a physical connection to the Southport to keep costs down.
I agree with Tazi that you don't need more platforms at Chester. What you need is better track layouts that enable flexibility. Simple option for Chester is to throw in a set of points between platform 7A and 7B onto the Down Through. Bingo, you have solved any Merseyrail problem as there is then 2 platforms and trains can come in and out from both. Potentially here the is a chance of an Aberdare style system of drop off on 7A, pick up on 7B. Or it just means 7A is an 'if needed' platform for Merseyrail and at other times TFW can use 7A better rather than almost everything being forced through 4 or having to sit outside the station waiting for Merseyrail to leave.
Platform 8 lark is just silly in my opinion and not needed unless services ramp up significantly. If the track layout wasn't so restrictive and permitted more parallel movements, Chester would be perfectly fine with the current number of platforms.


There were proposals for a single platform Burscough Bridge with no connection into the Wigan to Southport line. It'd likely be east of the A59 so somewhat disconnected from the current Burscough Bridge station but it wouldn't require investment in signalling changes on the Wigan Southport line or a significant rebuild of Burscough Bridge Station.Not quite sure what you mean here: please could you expand a little?
Because it seems to me to be obvious that the best solution for Burscough is one station to serve everywhere - and probably for Bridge to be that station as it's better located than Junction. But I run into problems thinking about how much money would be needed. So if there's a way to do it and keep costs down, that's got to be worth a look.
To Bootle? By which route, and how would it not have to integrate with Merseyrail?Personally I'd say the likely extensions are Wigan, Warrington, and Burscough. Perhaps Wrexham too. Preston is too far away from Liverpool and too rural to justify the surface. I'd say the best way to serve Burscough is to extend to Burscough Bridge without a physical connection to the Southport to keep costs down.
In terms of the current Ormskirk to Preston service, I wonder if a case can be made for a semi-fast extension to Bootle which is pretty densley populated and is also an employment hub. The infrastructure upgrades might be prohibitively expensive but Preston to Ormskirk as always seemed like a service that would be better used if it terminated closer to Liverpool. At the same time extending into Central Liverpool is a non-starter given it wouldn't easily integrate with Merseyrail.
There were indeed such proposals in a report produced in 2020 in relation to making West Lancs, South Ribble and Chorley carbon neutral by 2030. As we are now 5 years down the road with just 5 years left and absolutely no progress has been made on any of the proposals in the report I think we can safely file them in the council fantasy bin.There were proposals for a single platform Burscough Bridge with no connection into the Wigan to Southport line. It'd likely be east of the A59 so somewhat disconnected from the current Burscough Bridge station but it wouldn't require investment in signalling changes on the Wigan Southport line or a significant rebuild of Burscough Bridge Station.
There were proposals for a single platform Burscough Bridge with no connection into the Wigan to Southport line. It'd likely be east of the A59 so somewhat disconnected from the current Burscough Bridge station but it wouldn't require investment in signalling changes on the Wigan Southport line or a significant rebuild of Burscough Bridge Station.
It would provide interchange opportunities between Ormskirk and Manchester/Southport without the expense or a direct service that can't really be justified given the rural nature of Burscough to Southport. Burscough Junction could remain open too.
There were indeed such proposals in a report produced in 2020 in relation to making West Lancs, South Ribble and Chorley carbon neutral by 2030. As we are now 5 years down the road with just 5 years left and absolutely no progress has been made on any of the proposals in the report I think we can safely file them in the council fantasy bin.
Why would you still be running a train from Preston to Ormskirk if you are extending Merseyrail north of there?It's a sub-optimal "solution" that suits nobody.
If the 'Merseyrail' platform was to be east of the A59, and thus physically seperate from the existing infrastructure, you'd still need to rebuild the south curve, but the resultant service would fail to provide same- or cross- platform connections onto the Southport - Wigan - Manchester services. Not only that, but even a 2 tph service between Ormskirk and Burscough Bridge would interfere with the hourly Ormskirk - Preston service, unless you [re]-doubled pretty much the whole line from Ormskirk north to beyond Burscough Junction. And with the best will in the world, Burscough Junction to Ormskirk does not require 3 tph.
It would technically be possible, I guess, but bearing in mind it's single track through Burscough Junction, the second platform hasn't been used in decades, and is remote from the current one, it would be an even less convenient arrangement than you've currently got at Ormskirk (end on end connection) for through passengers to/from Liverpool. ... and you'd have to accomodate both tracks from there north until the Burscough curves.Why would you still be running a train from Preston to Ormskirk if you are extending Merseyrail north of there?
Wouldn't you just install buffer stops at Burscough Junction or some other convenient placfe?
Is it ? So would you start to do that say on South Eastern ?Maybe because the trains can run on batteries? Cheaper to maintain across both infrastructure and rolling stock?
To run to Bootle from Ormskirk/Preston you would have to reopen the North Mersey branch from Aintree to Bootle. The branch is just over four miles long but has not been used for many years. If our Metro Mayor wasn't so intent on spending £100 million on the potential white elephant station at Baltic he could reopen the North Mersey Branch at a fraction of the cost of Baltic and serve parts of Bootle in the Harris Drive area which could do with improved public transport.Personally I'd say the likely extensions are Wigan, Warrington, and Burscough. Perhaps Wrexham too. Preston is too far away from Liverpool and too rural to justify the surface. I'd say the best way to serve Burscough is to extend to Burscough Bridge without a physical connection to the Southport to keep costs down.
In terms of the current Ormskirk to Preston service, I wonder if a case can be made for a semi-fast extension to Bootle which is pretty densley populated and is also an employment hub. The infrastructure upgrades might be prohibitively expensive but Preston to Ormskirk as always seemed like a service that would be better used if it terminated closer to Liverpool. At the same time extending into Central Liverpool is a non-starter given it wouldn't easily integrate with Merseyrail.
Here here, clogged with traffic around that area.To run to Bootle from Ormskirk/Preston you would have to reopen the North Mersey branch from Aintree to Bootle. The branch is just over four miles long but has not been used for many years. If our Metro Mayor wasn't so intent on spending £100 million on the potential white elephant station at Baltic he could reopen the North Mersey Branch at a fraction of the cost of Baltic and serve parts of Bootle in the Harris Drive area which could do with improved public transport.
How do you suggest a service could run from Ormskirk - Burscough Bridge if there were buffers installed at Burscough Junction?Why would you still be running a train from Preston to Ormskirk if you are extending Merseyrail north of there?
Wouldn't you just install buffer stops at Burscough Junction or some other convenient placfe?
I think you will find that there are, and the working group is not exclusively looking at Merseyrail either.There are literally no plans to remove it.
Chester is not a ‘depot or siding’Depots and sidings all over third rail territory will eventually be free of electrification
But it might be anChester is not a ‘depot or siding’
And if (as I understand from higher up this thread) battery operation would allow more flexibility in what platforms M'rail could use at Chester, what's not to like?other assets which are consistent hostile environments
The trains have batteries regardless of whether the platform is de-electrified or not. They can use another platform if needed even if P7 keeps its third rail.But it might be an
And if (as I understand from higher up this thread) battery operation would allow more flexibility in what platforms M'rail could use at Chester, what's not to like?
It is the only place on that section of line where you can insert a station without rebuilding bridges or slewing tracks.But there already is a bus shuttle from Parkway. A station purpose-built for that. A station in the middle of an industrial estate, a long walk from the residential part of Speke, wouldn't be much use, and surely not economically viable. By all means improve the bus connection (with Rotheram's 'glider trams' if necessary) and have integrated ticketing. But there's no point in fiddling around with more half-baked solutions if a proper rail link (both to the airport and Speke itself) can't be achieved.
Well I think you'd probably abandon the current platform, demolish part of it and rebuild the second platform into a stepped platform like that built at Nottingham ages ago. A bay facing towards Preston and a single through platform for Burscough Bridge.How do you suggest a service could run from Ormskirk - Burscough Bridge if there were buffers installed at Burscough Junction?
The extension of Merseyrail to Burscough, either Bridge or Junction, is academic anyway. It isn't going to happen and it most certainly isn't going to go to Burscough Bridge. It has been demonstrated several times over many years there is no business case for reopening the Burscough curves so reopening one of them just to run a few yards to Burscough Bridge and not even connect to the Southport line is total nonsense.
I'm not required to provide a source in this part of the forum.The trains have batteries regardless of whether the platform is de-electrified or not. They can use another platform if needed even if P7 keeps its third rail.
Is there a source for Chester P7 being de-electrified please? At the minute one member is suggesting it is going to happen and that’s all we have.