frodshamfella
Established Member
Headbolt Lane to Wigan is very logical the current service is poor, probably to build a branch for Skelmersdale from there would be best allowing direct access to Liverpool City Centre.Here is a few ideas I had for extending the Merseryrail network, all routes would be 25kv unless otherwise stated. I know some of these are planned. Due to the number of issues with the 777s it might be worth getting a fleet of level baording 717s for extensions.
Kirby Headbolt Lane to Wigan Wallgate (4tph)
Ormskirk to Preston (4tph)
Wrexham to Bidston (4tph)
Cressington to Liverpool Airport (12tph)
Ellesmere Port to Helsby (4tph)
Ormskirk to Skelmersdale (4tph)
An airport link is desperately needed, and should be a high priority.
TFW are making sounds about Bidston to Wrexham . Id suggest Bidston is not the best destination, ideally around the loop itself, if no Birkenhead North where there are more connections.
Id agree with Ellesmere Port to Helsby. Ellesmere Port is an illogical point to terminate when you can have onwards connections just a bit further down the line. The platforms are there ready to use.
== Doublepost prevention - post automatically merged: ==
Looks great. I think Speke township should benefit with a station too. It has poor transport links presently.My plan would be to use tunnel boring machine and create a Heathrow Central style stations for Liverpool Airport and Speke. View attachment 187270
== Doublepost prevention - post automatically merged: ==
I believe there is a provision for a station at Beechwood on the Halton Curve. This would be useful for that part of Runcorn..I would extend the Ellesmere Port service to Runcorn via Helsby, and put a platform face on the Folly Lane branch line, or possibly send on to Liverpool South Parkway, ideally timetabled to work nicely with the Chester-Liverpool TfW service. Given Runcorn often feels left out of the Liverpool City Region politics, this could greatly assist. A less desirable option would be to send it to Warrington Bank Quay via Runcorn East.
Given the suitable battery tech is already available now, I'd not be against sending 2tph from Liverpool to Chester on to a bay at Crewe, replacing and enhancing the Crewe-Chester shuttles, particularly if Beeston and Tarporley ever reopens. The third rail at Chester is likely to be removed within this decade in any event, or whenever it gets resignalled.





