• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

What does this mean?

Status
Not open for further replies.

GNER 91128

Member
Joined
13 Jan 2011
Messages
293
Location
Peterborough
"Timed for E410 at 125mph"

Was just having a play on Open Train Times and would just like to know what that means.

Thanks
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,669
Class 91, it is a cut down version of the "timing load" used when planning. In our systems it shows as 12591410, ie 125mph Class 91 with 410 tonnes trailing.
 
Status
Not open for further replies.

Top