The answer will very much vary depending on the scale of the engineering work, the location of the TOC's traincrew depots, and the rules around how much their traincrew can have their diagrams amended.Having passed through Gloucester yesterday on a RRB (rail replacement bus), I noticed XC were not running any services at all beyond Gloucester towards Cardiff. I assume this means a huge reduction in crews needed to operate what is now Cheltenham to Nottingham service as you’ve just chopped about 3 hours from each round trip.
What happens to the spare crew capacity? Presumably you can’t just cut people’s hours without agreement and presumably the rosters are drawn up months in advance so people should be working on anll affected days.
Just curious as XC have a severe shortage on Sundays and are about to cut services on this line but presumably it’s adequately staffed during the rest of the week.
Route learning? Help with training new crew? There’s probably a load of things that could be done.
As others have said, engineering diagrams are usually a lot more inefficient than the regular diagrams. You also end up with trains that can't be covered by their normal crews because they can't be in place owing to the engineering work.
Using this example, on paper it looks like Birmingham depot will have less work because they'll only be working to and from Gloucester and not going all the way to Cardiff. But if the engineering work means that it's harder for Bristol crews to be in place to work the trains they're normally booked to work, then Birmingham might need to cover those diagrams instead. Those Bristol crews may instead be covering stuff that Birmingham aren't able to do, and so on.
Rest assured it doesn't mean there's people sitting around getting paid to do nothing. Engineering work can actually mean longer days for traincrew.