Then what does that make 150s? They are at least less life expired than those units, and can work on those routes.I totally agree, life expired
Then what does that make 150s? They are at least less life expired than those units, and can work on those routes.I totally agree, life expired
150s are considerably more useful to TfW than 769s, until replacement rolling stock is available.Then what does that make 150s? They are at least less life expired than those units, and can work on those routes.
I meant in general, sorry. 197s will obviously replace TFW units. I'm more talking Northern or maybe even GWR (although they've given up on their 769s).150s are considerably more useful to TfW than 769s, until replacement rolling stock is available.
If they could be made to work reliably, then there would be a use case on Northern (leaving aside the cost implications for the time being). However they wouldn't be able to do everything a 150 can do at the moment as they're too long for routes like Huddersfield to Sheffield.I meant in general, sorry. 197s will obviously replace TFW units. I'm more talking Northern or maybe even GWR (although they've given up on their 769s).
Not to mention the staff training issue.However they wouldn't be able to do everything a 150 can do at the moment as they're too long for routes like Huddersfield to Sheffield.
I think Northern might conceivably take on two or three more 769s, based at Allerton with its existing eight, to replace double 150 diagrams on the Southport to Stalybridge/Oxford Road routes. But only if the 150s are needed by other TOCs.I was on a couple of Northern 769s yesterday and have to say they were both on time and seemed to be running well, and changed over power at Bolton smoothly in both directions. And I find the MAN engines quieter than the Cummins engines of the 150s.
As Northern do operate some 2x2 car 150s in the NW area and will loose some potentially to WMR for Bletchley Bedford it does make me wonder if a few more 769 diagrams could be added around the north west in a unit shuffle round?
Id presume the 769 engines are lower emission than the older 150 engines?
I’ve often wondered about something Leeds Morecambe would work for them given they could use overhead between Leeds and Skipton and diesel skipton to Carnforth. Then electric to Lancaster? They’d also then be similar length to the aire valley 331/333 at the Leeds end of the line for commuters.
It wouldn't have changed the industrial relations issues, driving cab conditions, or performance of the units. It also wouldn't have been as quick as the original plans envisaged getting them into service. It could equally be asked whether putting the generators above floor within the body like a Southern DEMU or class 210 would have made a difference.I do wonder if a Stadler style mk3 power pack would have made a difference vs putting generators under the trailers.