Credit to Network Rail where its due, it seems the line was indeed re-opened in time for the first of the four Caledonian Sleepers to pass through, ie the Glasgow/Edinburgh southbound shortly before 2.00am, followed by the northbound Aberdeen/inverness/Fort William soon after..Network Rail Scotland have tweeted -
We expect overhead wire repairs at Beattock to be complete by approx. 21:30 this evening.
Our control team remain in close contact with @AvantiWestCoast, @TPExpressTrains and freight operators to keep them updated. We’re diverting freight services where we can.
But what about the ongoing problems with cable theft which are seemingly rife throughout much of the UK? Wellington (Shropshire) has had enough problems with flooding in the last couple of days, without being compounded by the selfish few who seek to make money for themselves which must be absolutely miniscule in comparison with the costs of the delays and repairs. Since this thread is for discussion about disruption, what do members think might be done to prevent this scourge?
Flooding and cable theft closes Shropshire railway line
Flooding in the Wellington area as well as signalling cable theft have left passengers facing disruption between Shrewsbury and Wolverhampton.
www.railadvent.co.uk
Flooding in the Wellington area as well as signalling cable theft have left passengers facing disruption between Shrewsbury and Wolverhampton.
Track at Wellington station was left submerged by flood water. This has now subsided but with the cable stolen and repairs needed, disruption is likely to last throughout the day.