• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

What are these signs?

Status
Not open for further replies.

Railsigns

Established Member
Joined
15 Feb 2010
Messages
2,754
I saw two of these signs alongside the railway near Barking station. They're quite small (about the size of a car stop marker), mounted low down near the track and are double-sided. Both sides have a "2" above two small triangles, which point up on one side and down on the other side.

Any ideas?

They are not mileposts or car stop markers.

barking.gif
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

asylumxl

Established Member
Joined
12 Feb 2009
Messages
4,260
Location
Hiding in your shadow
I'm not remotely clued up on such things but I'm going to take a wild stab in the dark anyway.

Are these near pointwork by any chance?
 

tsr

Established Member
Joined
15 Nov 2011
Messages
7,400
Location
Between the parallel lines
Perhaps, if a train is able to use 2 pantographs, it means that the driver is to raise the second one at the first sign, and drop it at the second sign? I don't know for sure and I've never seen those signs before, I don't think.
 

hutchy357

New Member
Joined
25 Aug 2014
Messages
1
They are 'Clay Shrinkage Area' marker boards installed in areas where at certian times of year the clay underneath the trackbed can expand or contact causing a rough ride.

The up arrows indicate the commencement of the numbered area and the downward arrows indicate the end.

As far as I'm aware they are only installed on the LT&S line and is designed for drivers to easier to specify a general location, and as the underlying cause is known it can negate the need for ESR's to be put in.
 

Railsigns

Established Member
Joined
15 Feb 2010
Messages
2,754
They are 'Clay Shrinkage Area' marker boards installed in areas where at certian times of year the clay underneath the trackbed can expand or contact causing a rough ride.

The up arrows indicate the commencement of the numbered area and the downward arrows indicate the end.

As far as I'm aware they are only installed on the LT&S line and is designed for drivers to easier to specify a general location, and as the underlying cause is known it can negate the need for ESR's to be put in.

Aha! Thank you for this excellent explanation.
 
Status
Not open for further replies.

Top