West Wales resignalling progress

Status
Not open for further replies.

Western 52

Established Member
Joined
19 Jun 2020
Messages
1,672
Location
Burry Port
Work is underway resignalling between Swansea and Carmarthen, with commissioning of new signalling apparently due last weekend in March. This will mean the end for the remaining semaphores at Pembrey and Ferryside. Today, a new equipment cabin was craned into place in a new compound opposite the existing Pembrey signalbox.

Maybe we can use this thread for updates on this scheme?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

DaveHarries

Established Member
Joined
12 Dec 2011
Messages
2,568
Location
England
Work is underway resignalling between Swansea and Carmarthen, with commissioning of new signalling apparently due last weekend in March. This will mean the end for the remaining semaphores at Pembrey and Ferryside. Today, a new equipment cabin was craned into place in a new compound opposite the existing Pembrey signalbox.
The website run by the group that is looking to preserve the box advises that the date has slipped to March 2024 for the decommissioning of Ferryside and it may slip further. It is not clear, however, whether this also affects the box at Bury Port. The agreement framework for the preservation of the box seems to be in place also: details can be found at http://ferryside.wales/sos/

Hopefully the March 2024 is not a typo: I have eben trying to get over there this week for some last photos on the assumption that the box was closing at the end of this month but the weather has so far put paid to my plans.

Dave[/url]
 

Western 52

Established Member
Joined
19 Jun 2020
Messages
1,672
Location
Burry Port
Plenty of work going on now with a lot of new equipment installed but not yet commissioned around Pembrey box. No new signals here yet, but those working here are still saying some commissioning is due end of March. Work is also taking place each weekend between Llanelli and Swansea with trains replaced by buses.

It will be great if Ferryside box is preserved. I think it's listed anyway. I wonder if it would have to be moved as it's close to the down line?
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,311
Location
Hertfordshire / Teesdale
Plenty of work going on now with a lot of new equipment installed but not yet commissioned around Pembrey box. No new signals here yet, but those working here are still saying some commissioning is due end of March. Work is also taking place each weekend between Llanelli and Swansea with trains replaced by buses.

It will be great if Ferryside box is preserved. I think it's listed anyway. I wonder if it would have to be moved as it's close to the down line?

Yes quite a distinctive box, and in a quite distinctive setting too. I’ve been fortunate enough to go inside. Hopefully something can be sorted.
 

Parham Wood

Member
Joined
13 Jun 2011
Messages
405
When I worked for the S&T Cabling section in Reading HQ in the 70s I remember walking most of the West Wales lines to plan the route for the conversion of overhead wires to cable. Where possible the cables were mole ploughed in but being Wales there was a fair amount of rock which required concrete troughs. The mole plough train came down from Glasgow and the plough was operated by a private contractor with barely understandable Glaswegians on it. Normally we replaced with a suitable sized twisted pair telecoms cable and a multicore signalling cable which varied in size from something like 9 core to 37 core depending on requirements. I travelling on the ploughing possessions at ungodly hours on a Sunday morning recording all the locations of cable breaks (cable drum lengths were 500m max) so drawings could be prepared of the installation. Several times we had ice on the wagons to deal with. Train was hauled by a slow speed fitted 47 off the merry go round coal trains and several times I had to tell the driver how to put it in low speed mode as this was something not used in West Wales. Great times. I was always miffed how the Glaswegians got an enormous hamper of sandwiches and stayed in 4 star hotels while we had to make do with 3 star hotels and some rather iffy sandwiches provided by the hotel.
 

Anonymous10

Established Member
Joined
19 Dec 2019
Messages
2,629
Location
wales
Work is underway resignalling between Swansea and Carmarthen, with commissioning of new signalling apparently due last weekend in March. This will mean the end for the remaining semaphores at Pembrey and Ferryside. Today, a new equipment cabin was craned into place in a new compound opposite the existing Pembrey signalbox.

Maybe we can use this thread for updates on this scheme?
It'll be sad to pass through on my trips away and back home to Pembrokeshire and not be greater by those semaphore signals
 

MadMac

Established Member
Joined
13 Jun 2008
Messages
1,492
Location
Moorpark, CA
When I worked for the S&T Cabling section in Reading HQ in the 70s I remember walking most of the West Wales lines to plan the route for the conversion of overhead wires to cable. Where possible the cables were mole ploughed in but being Wales there was a fair amount of rock which required concrete troughs. The mole plough train came down from Glasgow and the plough was operated by a private contractor with barely understandable Glaswegians on it. Normally we replaced with a suitable sized twisted pair telecoms cable and a multicore signalling cable which varied in size from something like 9 core to 37 core depending on requirements. I travelling on the ploughing possessions at ungodly hours on a Sunday morning recording all the locations of cable breaks (cable drum lengths were 500m max) so drawings could be prepared of the installation. Several times we had ice on the wagons to deal with. Train was hauled by a slow speed fitted 47 off the merry go round coal trains and several times I had to tell the driver how to put it in low speed mode as this was something not used in West Wales. Great times. I was always miffed how the Glaswegians got an enormous hamper of sandwiches and stayed in 4 star hotels while we had to make do with 3 star hotels and some rather iffy sandwiches provided by the hotel.
You’ll enjoy this!
 

Western 52

Established Member
Joined
19 Jun 2020
Messages
1,672
Location
Burry Port
One of the down signals operated from Pembrey box has a sighting board. I can't think of any other surviving lower quadrants with a board, apart from on preserved lines. Maybe one somewhere though?
 

wallan

Member
Joined
27 May 2020
Messages
92
Location
Bedworth
Work is underway resignalling between Swansea and Carmarthen, with commissioning of new signalling apparently due last weekend in March. This will mean the end for the remaining semaphores at Pembrey and Ferryside. Today, a new equipment cabin was craned into place in a new compound opposite the existing Pembrey signalbox.

Maybe we can use this thread for updates on this scheme?
Any further update on this project
 

louis97

Established Member
Joined
14 May 2008
Messages
2,144
Location
Derby
Any further update on this project
The remaining area controlled by the panel at Port Talbot, plus the Neath and Brecon line, was due to transfer to a Llanelli workstation at Port Talbot at the end of the month. However this has been postponed until mid May.

The closure of Ferryside, Kidwelly, Pembrey and Carmarthen Junction boxes is still scheduled for late February 2024 at present. Would not be surprised if that slipped a bit though. These will transfer to a Carmarthen workstation also at Port Talbot.
 

wallan

Member
Joined
27 May 2020
Messages
92
Location
Bedworth
The remaining area controlled by the panel at Port Talbot, plus the Neath and Brecon line, was due to transfer to a Llanelli workstation at Port Talbot at the end of the month. However this has been postponed until mid May.

The closure of Ferryside, Kidwelly, Pembrey and Carmarthen Junction boxes is still scheduled for late February 2024 at present. Would not be surprised if that slipped a bit though. These will transfer to a Carmarthen workstation also at Port Talbot.
Thank You For The Update
 

Freightmaster

Verified Rep
Joined
7 Jul 2009
Messages
4,414
The remaining area controlled by the panel at Port Talbot, plus the Neath and Brecon line, was due to transfer to a Llanelli workstation at Port Talbot at the end of the month. However this has been postponed until mid May.

The closure of Ferryside, Kidwelly, Pembrey and Carmarthen Junction boxes is still scheduled for late February 2024 at present. Would not be surprised if that slipped a bit though. These will transfer to a Carmarthen workstation also at Port Talbot.

That's an interesting development - I always thought that the original 'master plan' was to control all
resignalled lines in Wales from SWSC at Cardiff (a good example of this being the North Wales Coast
from Abergele to Fflint), but there seems to have been a drastic change of plan in that regard...

Is it like the Thames Valley SC, where there isn't the physical capacity to expand much further?




MARK
 

Doveymain158

Member
Joined
9 Apr 2014
Messages
135
That's an interesting development - I always thought that the original 'master plan' was to control all
resignalled lines in Wales from SWSC at Cardiff (a good example of this being the North Wales Coast
from Abergele to Fflint), but there seems to have been a drastic change of plan in that regard...

Is it like the Thames Valley SC, where there isn't the physical capacity to expand much further?




MARK
Wales Route Operating Centre might just be at capacity. Ebbw Valley is being resignalled so that will go into Wales Route Operating Centre. Rhymney Valley including Queen St will move from Wales Route Operating Centre to Core Vallet Lines Intergated Control Centre at Taffs Well. Makes sense west of Bridgend being in to Port Talbot. I can see Whitland & Clarbeston Rd going to Port Talbot in the not too distant future.
 
Last edited:

Freightmaster

Verified Rep
Joined
7 Jul 2009
Messages
4,414
Makes sense west of Bridgend being in to Port Talbot.
I agree, although Swansea to Briton Ferry is already controlled from Cardiff,
so I assumed that Baglan to Llanharan would eventually follow meaning that
the main line from Swansea through to Pilning is all controlled from Cardiff.



MARK
 

a good off

Member
Joined
2 Jul 2010
Messages
371
Location
Control Room
One of the down signals operated from Pembrey box has a sighting board. I can't think of any other surviving lower quadrants with a board, apart from on preserved lines. Maybe one somewhere though?
Crewe Junction at Shrewsbury has two on the Up Chester. Truro, Lostwithiel and Pontrilas also have them too.
 
Last edited:

DaveHarries

Established Member
Joined
12 Dec 2011
Messages
2,568
Location
England
The closure of Ferryside, Kidwelly, Pembrey and Carmarthen Junction boxes is still scheduled for late February 2024 at present. Would not be surprised if that slipped a bit though. These will transfer to a Carmarthen workstation also at Port Talbot.
And I think it has: the FSPS (Ferryside Signalbox Preservation Society) says March 2024.

Dave
 

fishwomp

Established Member
Joined
5 Jan 2020
Messages
1,271
Location
milton keynes
Over the weekend just gone, the new signalling has been commissioned - the semaphores are gone and boxes at Pembrey, Kidwelly, Ferryside (mostly/entirely semaphore) and Carmarthen Junction (colour lights) are now shut.

Buses will replace trains from Friday 31 October through the weekend between Carmarthen and Swansea as Network Rail switches the route over to new safer and more efficient digital technology

Rail passengers are advised that the railway will be closed between Carmarthen and Swansea on Friday 31 October, Saturday 1 and Sunday 2 November, while Network Rail engineers carry out major signalling upgrade works designed to modernise train control systems, improve train reliability and enhance safety across the region.

It's already visible in Traksy, with as far as Carmarthen now getting live feed - as per: https://traksy.uk/live/M+34+CMTHN
 

collexions

Member
Joined
18 Jan 2010
Messages
62
Location
Avoncliff Halt
Wales Route Operating Centre might just be at capacity. Ebbw Valley is being resignalled so that will go into Wales Route Operating Centre. Rhymney Valley including Queen St will move from Wales Route Operating Centre to Core Vallet Lines Intergated Control Centre at Taffs Well. Makes sense west of Bridgend being in to Port Talbot. I can see Whitland & Clarbeston Rd going to Port Talbot in the not too distant future.
Only room/plan for the two workstations in Llanelli and Carmarthen at Port Talbot. Looking at a separate new facility for further west when Whitland and Clarbeston Road goes.
 

Anonymous10

Established Member
Joined
19 Dec 2019
Messages
2,629
Location
wales
Only room/plan for the two workstations in Llanelli and Carmarthen at Port Talbot. Looking at a separate new facility for further west when Whitland and Clarbeston Road goes.
Id be surprised if theres the traffix to justify it
 

fishwomp

Established Member
Joined
5 Jan 2020
Messages
1,271
Location
milton keynes
Only room/plan for the two workstations in Llanelli and Carmarthen at Port Talbot. Looking at a separate new facility for further west when Whitland and Clarbeston Road goes.
It looks like no additional signals are in place (traksy) - only the old ones replaced. Anyone know if that's the case? Is there any improvement in frequency / speed directly as a result of the signalling works ?
 

Freightmaster

Verified Rep
Joined
7 Jul 2009
Messages
4,414
It looks like no additional signals are in place (traksy) - only the old ones replaced. Anyone know if that's the case?
It's actually worse than before, as there are no longer any home/starter signals at the intermediate stations,
so the 'block' sections are longer now; albeit with more distant signals here and there.

A similar thing happened when the Crewe to Shrewsbury line was resignalled, which resulted in several
signal sections that were far too long to cope with delays/out of course running, just to save a few quid...


MARK
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,634
A similar thing happened when the Crewe to Shrewsbury line was resignalled, which resulted in several
signal sections that were far too long to cope with delays/out of course running, just to save a few quid...


MARK
Genuinely one of the worst resignallings ever.
 

DelW

Established Member
Joined
15 Jan 2015
Messages
5,941
Only room/plan for the two workstations in Llanelli and Carmarthen at Port Talbot. Looking at a separate new facility for further west when Whitland and Clarbeston Road goes.

Id be surprised if theres the traffix to justify it

Maybe if/when the new western one eventually happens, the Llanelli and Carmarthen areas will transfer to it? It would seem odd to have a "regional" centre that only controls west of Carmarthen. Fishguard, Milford, and Pembroke trains aren't likely to keep anyone very busy.
 

fishwomp

Established Member
Joined
5 Jan 2020
Messages
1,271
Location
milton keynes

jamess

Member
Joined
24 Jul 2011
Messages
114
Only room/plan for the two workstations in Llanelli and Carmarthen at Port Talbot. Looking at a separate new facility for further west when Whitland and Clarbeston Road goes.
Is there my rough date for when Whitland and Clarbeston Road may go?
 

DaveHarries

Established Member
Joined
12 Dec 2011
Messages
2,568
Location
England
there are some photos including inside the Kidwelly and Ferryside boxes here: https://www.networkrailmediacentre....les-this-weekend-for-major-signalling-upgrade
I have some interior ones of Ferryside thanks to a signalman agreeing to take a few using my phone while a train I was on was stuck there once. They aren't bad photos but he did ask me not to share them lest it wrongly give the impression he admitted me to the box (which he hadn't) and I agreed to that. I am glad to have them though and one of them forms the wallpaper background to my phone.

Dave
 