West Somerset Engineering Works

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Shenandoah

Member
Joined
19 Jun 2015
Messages
116
Location
Thunder Bay
They are relaying the track either side of the level crossing. The level crossing is due to be upgraded, due to increased traffic flows, later the year.
 

L&Y Robert

Member
Joined
22 Apr 2012
Messages
585
Location
Banbury 3m South
Thank you, Sh. Both sides of the crossing you say? I know there's "a bit of a dip" on the station side. And the crossing itself later in the year - that'll be after the season, then, because it will bring road and rail traffic to a stop. I'm surprised how busy the road is - but then I'm surprised how busy my local street is - it's the universal uncontrollable rise in motor car ownership. Where will it end?
 

ffm

Member
Joined
20 May 2012
Messages
856
In this case the busy road is not just the 'uncontrollable rise in motor car ownership', but rather that it was always going to be busy - it was a new road constructed to access the beach and Butlins so as to relieve traffic in the centre of Minehead - effectively a bypass.
 

tiptoptaff

Established Member
Joined
15 Feb 2013
Messages
3,224
The crossing is being upgraded to full barriers and recontrolled so the number of moves requiring to go over and in again are reduced. It will remove the automatic operation of the crossing by treadle in the Up direction.

The track was relaid on the station side last winter, the up side is being done this winter.
 