Jamie C. Steel said:
So that means that there will be more average passengers because there wont be as many enthusiasts filling up the gaps, good for the railways cause it'll bring more money in overall.
Have you been on this train? any idea on the loadings? It's only really busy during the holidays, and a very significant proportion of passengers are enthusiasts, particularly seated. If you go off-peak there are plenty of seats.
A reduction in numbers of enthusiasts travelling will simply mean unfilled berths & seats, and loss of revenue. I fail to see how that can be a good thing.
Jamie C. Steel said:
Anyway, Class 37's have a rather large bill themselves, more so than is required in maintaining the fairly new and large fleet of Class 67's.
No, they are much cheaper to run than 67s, due to
* lower track access charges
* lower leasing costs (though EWS are so desperate for 67s to be used they are reportedly offering 67s at the same price as 37s, but that only hides the true figures and you can bet they'd increase it after a while!)
* lower fuel costs
* shorter journey time (due to speed restrictions for the 67s), and as they say 'time is money'
AlexS said:
Who should foot the bill? EWS, ScotRail and Network Rail.
EWS because they want to run the locomotives, ScotRail because they specified the contract for the service and Network Rail because it's their infrastructure and they should knuckle up to the responsibilities if they want a more modern railway. It's a few metal signs knocked into the ground. It's not exactly a bank breaker.
EWS - absolutely.
Scotrail - No, not at all. Why should they pay more for a slower service?!
NR - why? The line is maintained, and signed, to a standard that is suitable for the service. If EWS go against that standard, that's
their issue and should be resolved at
their expense.
If EWS want to use more track damaging locos, they should pay! Why should the railway be upgraded just because they can't get their act together?
At the end of the day it's the passengers who will pay, sadly.
Jamie C. Steel said:
joy54.gen said:
I don't know if you've ever been on the Caledonian Sleeper Jamie but 2 days ago there was only 3 people on the Fort William sleeper going southbound. So I don't think there is an issue with space.
Well then, it should be caped, not worth the money running it.
Yes as Joy54 said, that only referred to seated. Anyway, why is it that some people want the service to become so expensive it's unviable and then have an excuse to cancel it?
FGWFan said:
Granted, we'd LOVE that. But these beasts are getting rather old, very nearly retirement age. EWS have a 30-strong fleet of 67s doing very little, with plenty of power to run the service. They just need NR to fix the line up first.
Yeah well they (EWS) can pay for it then!
FGWFan said:
What the basic point is, we shouldn't expect 37s to carry on for long, it's unrealistic and impossible. Like heart-of-wessex says, we'd not expect cars to last for 50 years, why should 37s be any different? Which is why I've replied including yorkie's reply, which opens with saying that the post was irrelevant. Hardly so. So many people here have had the attitude and posts that sound and read like '37s are great, they'll never die, 67s suck, EWS are bad and wrong to replace 37s'. heart-of-wessex made some point of this, to call this irrelevant is looking blind into a wall.
Erm... okay...
FGWFan said:
The way I'm looking at it, if I was in charge solely of deciding what to do regarding what locos to run on the Fort William sleeper, I'd have basically two options for the diesel part of the route:
1) 37 from Fort William until Network Rail get their teams up the line to replace the track, laying the way for faster, more powerful locomotives (67s now, Goodness knows what in the future) to be used on the line.
Faster? Hang on, the 67s will be
slower due to speed limitations over weak bridges!
FGWFan said:
2) 37s indefinately, not bothering Network Rail at all and leaving the track as it is, waiting for the mass locomotive failures and no way out of the problem for months on end.
But why replace something that is reliable now, with something that is totally unsuitable?
FGWFan said:
My choice? Get on the phone to Network Rail.
But NR can't justify spending such sums on this lightly-used line.
FGWFan said:
Don't get me wrong, if this was MY choice, I'd ensure 37 farewell runs were operated prior to the 67 hand-over date. Things would be done properly, the 37s would have a proper send-off. But the basic point is, we can't expect 37s to live on forever, we need to make changes now before we have huge problems. As for who would pay, well that would be passed onto the financial department, who would pass it onto Network Rail, who'd be offered to have their late-running engineering works payments struck off if they paid the extra for 67 running and stuff.
I hope I've made both heart-of-wessex and my points here. My view is NOT up for change or discussion.
That's fine, you're entitled to your view, but I do not believe the costs should be passed on to NR.
NR, quite rightly, charge access charges based on how much wear & tear the locos cost, so they will charge EWS extra for that.
But if EWS want to put a totally unsuitable loco on this journey, that weighs too much to traverse bridges at the current line speeds, then EWS have to pay for the strengthening of those bridges and/or differential speed restriction signs.
But even if EWS do pay for the signs, the sleeper will have to be slower than at present. But, that causes problems. The ex-Mallaig train cannot leave any earlier or it may lose the ferry connection. I guess they'll make the connections tighter, but it's already tight enough as it is.
AlexS said:
I can't understand why people don't understand the business sense behind using a brand new asset that isn't doing much over a 40 year old one that has been worked to death over the course of it's life.
I can't understand why people don't understand the business sense behind using a reliable, efficient and working asset over one that was designed to run at over 3 times the speed, operating trains of completely different characterstics over a line that has weak bridges and would need to be upgraded at a cost that is difficult to justify and could put the future of the service in doubt, along with increasing fuel consumption (the costs of which is only going to rise further), higher access charges and slower journey times. Just my view though!
Don't get me wrong, if the service was going to be
cheaper to run, and
faster (ie. the total opposite to reality!), thus ensuring the viability of the service, then I'd declare it a step forward, however sad it would be to see the 37s go.
But that's simply not the case, and let's not pretend it is. I don't know if those who suggest cheaper costs and shorter journey times with 67s are confused, or have not done any research or if they're winding us up, but I'll give them the benefit of the doubt and assume they were unaware of the facts.
If people admit that the service is going to cost more, and be slower, but still claim it's for the best, then that's their choice and we'll have to agree to disagree on that.
IMO, the line is a magnificient piece of engineering, it's a miracle that the route was built. It's vitally important for the economy of the West Highlands, it deserves to survive, but it will only survive if costs are kept to reasonable levels, it cannot exist at any
cost.