Surprised no one has posted about this development (or if they have, here's an update):


Work has started on a new £11.2m freight terminal near Inverness to help move more Highland goods to the UK market by rail.

I assume the inbound would be timber, but outbound?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,438
Location
Northampton
The products produced at the factory, one assumes. OSB and MDF are mentioned. This PDF seems to outline the proposal: https://camsys.co.uk/archives/west-...raser-Public-Consultation-Boards-draft-v4.pdf
The site might also function as a small hub for distribution of containers to Inverness and the surrounding area. There's already a container train to Inverness yard itself via the Highland line (https://www.realtimetrains.co.uk/service/gb-nr:H00322/2025-10-06/detailed) which could potentially be run via Aberdeen or runround at Inverness to access the new terminal at Dalcross (depends whether the new site will be more or less convenient for the onwards distribution).
 

Stathern Jc

Member
Joined
30 Nov 2019
Messages
414
Location
Inverness
Interesting to see "should other companies use the facility".
Could that really be a hint at the possibility of outbound traffic? Or just a politician egging things up hoping to be quoted?
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,438
Location
Northampton
Interesting to see "should other companies use the facility".
Could that really be a hint at the possibility of outbound traffic? Or just a politician egging things up hoping to be quoted?
I expect WestFraser intend to use the facility for their own outbound traffic, to be fair.

However I also suspect that the Scottish Government funding will have been contingent on the facility being (at least theoretically) available to other companies.

There is a daily path from Coatbridge to Inverness and back run by DRS and a tuesday-thursday only path from inverness to Georgemas Junction (6S99) which hints at there being some rail-borne traffic already that may be interested in moving from the yard right in the town to a location on the edge of town for if it means longer trains, smoother handling or easier distribution.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,617
Location
Hampshire
I expect WestFraser intend to use the facility for their own outbound traffic, to be fair.

However I also suspect that the Scottish Government funding will have been contingent on the facility being (at least theoretically) available to other companies.

There is a daily path from Coatbridge to Inverness and back run by DRS and a tuesday-thursday only path from inverness to Georgemas Junction (6S99) which hints at there being some rail-borne traffic already that may be interested in moving from the yard right in the town to a location on the edge of town for if it means longer trains, smoother handling or easier distribution.
Part of the initial trial a few years ago (and potentially may well have continued) is that WestFraser products produced at Dalcross have been loaded into the southbound Tescoliner which otherwise would be returning largely empty.
 

CEN60

Member
Joined
17 Dec 2018
Messages
299
Does anyone know if the construction is via West Fraser's own contractor or via Network Rail - as they will have to link to the connection that was installed as part of the Airport Station Project?
 

mcmad

Member
Joined
11 Mar 2015
Messages
1,072
West Fraser's own contractor. Similar to how the Highland Spring terminal at Blackford was delivered.
 

mr_towers

Member
Joined
22 Jan 2013
Messages
24
Location
Pitlochry
I expect WestFraser intend to use the facility for their own outbound traffic, to be fair.

However I also suspect that the Scottish Government funding will have been contingent on the facility being (at least theoretically) available to other companies.

There is a daily path from Coatbridge to Inverness and back run by DRS and a tuesday-thursday only path from inverness to Georgemas Junction (6S99) which hints at there being some rail-borne traffic already that may be interested in moving from the yard right in the town to a location on the edge of town for if it means longer trains, smoother handling or easier distribution.
6S99 (and 6M97) were the glowex I thought? Not the sort of thing that WestFraser want in their yard!
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,438
Location
Northampton
6S99 (and 6M97) were the glowex I thought? Not the sort of thing that WestFraser want in their yard!
Ah, that would make sense. I'd connected them with the timber loading trial at Georgemas Jn but if they're for the reactor then they're unlikely to move to the yard.
 