0901 VTWC to Birmingham from Crewe was cancelled this morning on arrival at Crewe from Scotland, and replaced by a direct Euston only service. Does anyone know what was happening please?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Chrism20

Established Member
Joined
27 Feb 2013
Messages
1,400
Wires down between Glasgow & Motherwell this morning.

Probably skipped the West Mids stops and went straight to Euston in order to try and return the timetable to normal ASAP. I've been on a service where they have done it before.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,938
Location
Mold, Clwyd
0901 VTWC to Birmingham from Crewe was cancelled this morning on arrival at Crewe from Scotland, and replaced by a direct Euston only service. Does anyone know what was happening please?

That train (9M48, 0540 ex Glasgow) was cancelled at Preston 105 late, because of OHLE problems near Glasgow - a number of services were cancelled throughout.
VT were no doubt trying to recover the service further south.
 

Mag_seven

Forum Staff
Staff Member
Global Moderator
Joined
1 Sep 2014
Messages
12,017
Location
here to eternity
And now for a helpful response that attempts to answer the OP query - there were OLE problems in the Glasgow area disrupting all Anglo-Scottish WCML services this morning.
 

MadCommuter

Member
Joined
4 Oct 2010
Messages
736
To add a bit more detail, the affected area was just south of Newton. 9M48 ran via Hamilton to bypass the area.
 

sdrennan

Member
Joined
23 Feb 2011
Messages
211
Why did they not divert. There are a couple of diversion routes bit it seems the majority of south bound services were all canned
 

TimboM

Established Member
Joined
12 Apr 2016
Messages
3,734
Which diversionary routes could have been used ? It's not so easy nowadays.

When there was weekend/Bank Holiday engineering recently in the Motherwell area I believe some services went via Mossend. Depends exactly where the wires were down, though - and even then, not easy as you say at short notice - needs paths, drivers appropriately signed etc. etc.
 

Chrism20

Established Member
Joined
27 Feb 2013
Messages
1,400
When there was weekend/Bank Holiday engineering recently in the Motherwell area I believe some services went via Mossend. Depends exactly where the wires were down, though - and even then, not easy as you say at short notice - needs paths, drivers appropriately signed etc. etc.

There was engineering works last weekend. I was on the 1025 on Sunday morning and it went via Mount Florida but I'm sure it went through the area affected this morning so that would presumably rule that route out.

There are other routes but as you say it's getting to them in amongst all the others that are backed up and also using the route.
 

sdrennan

Member
Joined
23 Feb 2011
Messages
211
The early 0428 service ran ok . This runs via Holytown and avoids Motherwell as a diversionary route. Can't believe paths would be an issue on the early services
 

Chrism20

Established Member
Joined
27 Feb 2013
Messages
1,400
The early 0428 service ran ok . This runs via Holytown and avoids Motherwell as a diversionary route. Can't believe paths would be an issue on the early services

Going by the expletive laden rant my ex boss had on Facebook at 08:18 yesterday for being bundled off a Shotts line train at Holytown yesterday and onto an RRB this line was also not much of an option for diversions.
 

ScottDarg

Member
Joined
27 Apr 2017
Messages
718
Location
South Lanarkshire
If anyone's interested, here is the damaged wires from ScotRails twitter account as well as a crudely annotated map showing where the damage was.

C_73V-wUAAALU6h.jpgC_73YJ5VYAEIdIF.jpg Capture.jpg

ScotRail had GLC-Lanark trains run express to Motherwell and Lanark-GLC missing Bellshill. Trains to Larkhall ran via Whifflet and had them run express from Rutherglen to Hamilton Central, where trains from Larkhall were also starting from for a while. Edinburgh via Shotts services terminated and started back from Holytown.

Virgin had busses shuttle passengers between Glasgow and Carlisle.
 
Last edited:

87015

Established Member
Joined
3 Mar 2006
Messages
5,078
Location
GEML/WCML/SR
Why didn't beardie divert his trains via the R&C?

Don't know where that is, but VTWC are in the midst of getting rid of the vast majority of diversionary route knowledge. Add it to removing the 57s knowledge that they've done and there won't be many options left by the end of the month.
 

GW43125

Established Member
Joined
8 Dec 2014
Messages
2,313
Don't know where that is, but VTWC are in the midst of getting rid of the vast majority of diversionary route knowledge. Add it to removing the 57s knowledge that they've done and there won't be many options left by the end of the month.

They're doing what?! :o
 

signallerscot

Member
Joined
20 Sep 2016
Messages
200
Location
Scotland
R&C = Rutherglen & Coatbridge line. Rutherglen East Jn to Langloan Jn and Whifflet North Jn allowing trains to run from Glasgow to Motherwell via Carmyle, Whifflet, Mossend and Braidhurst. It is electrified but I believe Virigin Polmadie men don't sign it, though it is route cleared for 390s and Voyagers. In any case it may not have been useable for other reasons like the position of trapped trains or due to the electrical sectioning/switching required to isolate the damaged area.
 
Last edited:

Carlisle

Established Member
Joined
26 Aug 2012
Messages
4,515
Don't know where that is, but VTWC are in the midst of getting rid of the vast majority of diversionary route knowledge. Add it to removing the 57s knowledge that they've done and there won't be many options left by the end of the month.
The enthusiasm for using diversionary routes shown when the likes of Mr Green and later Mr Gibb were in charge no longer seems to exist, guess if it's not a franchise commitment there's no obligation to use any of them
 
Last edited:

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,938
Location
Mold, Clwyd
1) What's R&C?
2) Is it electrified?

Rutherglen & Coatbridge (electrified 2014).
Allows through electric running via Carmyle and Whifflet to Motherwell, or Law Jn via Holytown, and to Cumbernauld (eventually to Falkirk/Stirling).
 
Last edited:

Mag_seven

Forum Staff
Staff Member
Global Moderator
Joined
1 Sep 2014
Messages
12,017
Location
here to eternity
Woops - sorry for using an unexplained acronym (R&C=Rutherglen and Coatbridge). Guilty as charged your honour. :)

The enthusiasm for using diversionary routes shown when the likes of Mr Green and later Mr Gibb were in charge no longer seems to exist, guess if it's not a franchise commitment there's no obligation to use any of them

Typical of today's fragmented railway that Polmadie drivers appear not to sign a perfectly good (and now electrified) diversionary route.
 
Status
Not open for further replies.

Top