LNW-GW Joint
Veteran Member
It's now on the DfT web site:
http://www.dft.gov.uk/publications/rail-passenger-franchise-intercity-west-coast/#
Having skim-read it, it's all very disappointing and unambitious.
No change to the service plan - current baseline with no new routes, beyond deploying the 4 new Pendolinos (ie extending Lancaster terminators to Glasgow and higher frequency to Liverpool).
New trains serving Shropshire and in Lancashire are dismissed as having been refused by the ORR.
The most dramatic possible change seems to be the renaming of Birmingham International to something "more appropriate".
Nothing whatever on open access competition.
On rolling stock, the Pendolinos must be used until 31 Mar 2022, the Voyagers until 31 Mar 2016.
So I suppose there is a possibility that the Voyagers could be replaced in 2016.
Everything comes down to the options offered by the bidders, with the decision being based on the price for the baseline bid (ie current service).
Much of this depends on the new timetable being developed by NR for 2013.
Looks like the DfT/Treasury wants its pound of flesh for the next 15 years, with significant enhancements put off until HS2 turns up.
http://www.dft.gov.uk/publications/rail-passenger-franchise-intercity-west-coast/#
Having skim-read it, it's all very disappointing and unambitious.
No change to the service plan - current baseline with no new routes, beyond deploying the 4 new Pendolinos (ie extending Lancaster terminators to Glasgow and higher frequency to Liverpool).
New trains serving Shropshire and in Lancashire are dismissed as having been refused by the ORR.
The most dramatic possible change seems to be the renaming of Birmingham International to something "more appropriate".
Nothing whatever on open access competition.
On rolling stock, the Pendolinos must be used until 31 Mar 2022, the Voyagers until 31 Mar 2016.
So I suppose there is a possibility that the Voyagers could be replaced in 2016.
Everything comes down to the options offered by the bidders, with the decision being based on the price for the baseline bid (ie current service).
Much of this depends on the new timetable being developed by NR for 2013.
Looks like the DfT/Treasury wants its pound of flesh for the next 15 years, with significant enhancements put off until HS2 turns up.