BRX
Established Member
- Joined
- 20 Oct 2008
- Messages
- 4,505
I suppose I'd thought that it would be ok being in a tunnel the whole way, so not accessible by the public at all.
That's a very different location though.They don't do third rail extensions anymore, even small ones - Merseyrail had to buy battery trains just for a one station extension because they couldn't do more third rail.
I think you were right, since the Northern Line extension to Battersea Power Station was permitted.I suppose I'd thought that it would be ok being in a tunnel the whole way, so not accessible by the public at all.
I don't think the safety objections to extending the Thamelink third rail to St Pancras would have been insuperable. But it's not clear what benefit would be had for the cost of doing so. The current changeover arrangement has the benefit that if there's a problem, several following trains can stack up behind before they start blocking other routes.That's a very different location though.
I think you were right, since the Northern Line extension to Battersea Power Station was permitted.
Does the conductor bar cause excess wear and stress on the pantographs, due to its inflexibility compared to normal OHLE? Or is it not significant?
And throughout Palma intermodal stationIt is an overhead conductor rail, for tight spaces where regular OHLE isn’t preferable. You can also see it on the Elizabeth Line.