Any chance that you can list what these contingency plans should have been,
Yes, very happily! Let me emphasise, it has been known for over a year the WCML would need to do a special job this particular week, so extra contingency would be totally justified. However, the WCML is also a critical artery, so you could easily argue extra contingency is justified at all times compared to other, less critical lines.
Also, the Met Office was very clear on Saturday that Sunday would be, in its words, ‘wet and wild’ down the whole western side of the UK on Sunday.
So here is a list.
- It is Autumn. We get flooding and trees down and we know the exact location can be unpredictable. Flooding needs pumps. Fallen trees need saws. Did NR have teams spread out along the line to react quickly enough? Did they put in extra precautions at known flood sites? To those who say the weather may have been extreme and linked to climate change - perhaps but the actual impact on the WCML was not. It has to deal with flooded lines and downed trees all the time and it was a very localised problem - and so well within normal experience. The line that suffered washed away bridges was a different matter. That area had very slow moving rain - which is a worrying phenomenon for the UK and could cause us big problems here.
- If a tree comes down, the overhead line has probably followed it. Were there sufficient repair teams spread out along the line to get on with a fix as quickly as possible?
- A downed line means electric traction is a problem. Did Avanti arrange for diesels to be ready to drag at least some services and did it ensure it had staff with the best knowledge on diversionary routes available to it?
- When a tree comes down or a flood happens, it tends to affect one small part of the line. Did Avanti have rail replacement buses on stand by? Did they have a plan to curtail trains at either side of the blockage and put a road bridge or diesel train service around the problem until fixed? or did they just send trains down the line with no real plan, accruing massive delays and then when panic reached suitable levels, shove out a do not travel message to a load of people who need to get to an international conference of unbelievable importance.
- Avanti knew they would have lots of people travelling. They sold loads of tickets and certainly didn’t offer any discounts to support the conference. They should have had a massive customer service operation at Euston, in the same style as our amazing Olympic efforts, making sure everybody knew what was going on whilst something was and then being ready to offer support and information when the tree hit the line. Instead they made the station exit only, left those inside with closer to zero information and those outside with even less and utterly perplexed about what to do next.
- Avanti has a website, Twitter, Facebook, all sorts of ways to communicate. It did nothing to help people work out solutions, it just reported problems and washed its hands of responsibility by saying don’t travel…. Because a tree fell down in the wind.
- Did Avanti have spare drivers and staff rostered to make sure the service could be recovered quickly if problems did arise?
- Had Avanti spoken to East Midlands and East Coast about a plan B if the WCML went down? The Midland line remained up, it is perfectly possible to get from St P to Glasgow via numerous routes.
- Did Avanti have a plan to look after the welfare of passengers, many new to the railway or the country, if things dragged on in to the evening? On the basis it apparently happily chucked loads of Mums with small children onto the platform at Preston last night with zero help on what to do next - no.
I also ask again why so many trains were cancelled between Preston and Glasgow on Wednesday to Friday last week when trains were clearly able to run. Trains don’t tend to be the problem in storms, it is damage to the infrastructure that causes the problem. How does last minute but preemptive cancelling of trains on the basis of a weather forecast make it less likely damage to the infrastructure will occur? Run the trains until you start to see actual damage and then bridge the gap. That has been done many times very well when I have suffered storm related delay in the UK and elsewhere but Avanti just seem to have decided they can’t be arsed.