We need to talk about Castlefield again.

Status
Not open for further replies.

Purple Orange

On Moderation
Joined
26 Dec 2019
Messages
3,459
Location
The North
What does it solve? It wouldn't be a true removal if there needed to a replacement service on the Warrington Central route...which would still need to operate through Castlefield, so wouldn't 'save' a path.

The only benefit would be to change the nature of services running along the CLC. If there are no Sheffield bound services, should it not be converted to a metro service level, calling at all stops?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,404
Location
"Marston Vale mafia"
The only benefit would be to change the nature of services running along the CLC. If there are no Sheffield bound services, should it not be converted to a metro service level, calling at all stops?

The Warringtonians wouldn't like that, though I have proposed before, and still think would be sensible, a 4tph Liverpool-Manchester via CLC service of which half call all stations on one side and half call all stations on the other side of Warrington (and all call at key stations like South Parkway, Widnes, Birchwood and Urmston), operated using 195s for the acceleration.
 

Hey 3

Member
Joined
13 Aug 2020
Messages
330
Location
Manchester, UK
The Warringtonians wouldn't like that, though I have proposed before, and still think would be sensible, a 4tph Liverpool-Manchester via CLC service of which half call all stations on one side and half call all stations on the other side of Warrington (and all call at key stations like South Parkway, Widnes, Birchwood, Irlam and Urmston), operated using 195s for the acceleration.
Fixed it.

== Doublepost prevention - post automatically merged: ==

Has the Recovery Taskforce considered sending EMR services from Norwich via Romiley and then up the Phillips park Junctions to Victoria and then via Patricroft to Liverpool. It affects the CLC and Stockport, but if I were to do this then maybe the frequency could be altered to this:
  • 1tph Norwich - Sheffield - New Mills (1tp2h) - Reddish North (2tpd) - Manchester Victoria - Patricroft (1tp2h) - Newton-le-Willows - Lea Green - Liverpool Lime St (instead of the existing service)(EMR)
  • 1tph Manchester - Romiley - Sheffield Stopper (as per normal)
  • 1tph Manchester - New Mills Central Stopper (frequency change)
  • 1tph Sheffield - Stockport - Manchester Piccadilly (instead of existing EMR service)(cut short at Stockport if there is no room in Manchester Piccadilly Main Shed)
  • 1tph Semi-fast CLC calling at: Urmston, Irlam, Birchwood, Warrington Central, Warrington West (instead of existing EMR service)
(All services are operated by Northern unless stated otherwise, and some stops are omitted)

This takes some trains of the corridor allowing for extra local services and connectivity e.g between Sheffield and Wigan/Preston/Glasgow using Victoria, and providing Newton-le-Willows more inter-regional services. It also means that the platforms are less crowded because some of the traffic is diverted via Manchester Victoria.
You could also send it via Ashton Moss and Heaton Norris, but no, it would be a round about route and almost kill Stockport's fast connections to Sheffield, plus Manchester Victoria has not got direct connections to Glasgow( Manchester Piccadily does) and you could argue that Wigan NW & Wallgate and Preston etc is better provided at Manchester Piccadilly, given the quality of rolling stock.
 
Last edited:

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,434
Location
A typical commuter-belt part of north-west England
Just harking back to the days of both Manchester Victoria and Manchester Exchange being fully operational, there were of course fast through lines unaffected by platform requirements, situated in the running lines areas between platforms 11 and 12 at Manchester Victoria, where non-stop through services including goods trains could utilise without hinderence to normal passenger services.
 

domcoop7

Member
Joined
15 Mar 2021
Messages
272
Location
Wigan
I used to travel quite regularly from Lancaster to Manchester during the early 1990s and again around the turn of the year 2000.

My memory of the early 90s trips is a bit hazy, although I do recall loco-hauled Mark IIs on what became Cross Country used to run from the WCML to Castlefield via Bolton ultimately replaced by Voyagers and then transferred to TPE. On Saturdays I seem to think some of the local trains southbound from Preston went to Victoria and some to Piccadilly.

But by the 1999 to 2002 period, it was already dire. Everyone and their dog was routed via Castlefield. Going home from Oxford Road, it would be easier to get a train back to Pic and board there since otherwise it would be standing room only to around Horwich / Lostock. And platform 13/14 was then, as now, just horrible. An on time departure was very much the exception. So I couldn't understand when they proposed Ordsall Curve what on earth they hoped to achieve, and I still can't understand it now to be honest! Even if Castlefield were four tracked, and Piccadilly had two new platforms (or 10 new platforms), you still end up with the dogs dinner of flat crossings to the west.

I can't see what two new platform faces would do to help. The problem, as has been repeated ad nauseum above, is the decision that all services should go to Pic and the airport.

Network Rail's paper option C makes some effort to reduce that, but it's still not radical enough.

This is a fantasy thread of course, so we can propose any ideas.

1. Move Metrolink (partially) across to the Deansgate GNR viaduct to the West. The Eastbound CLC line can then use space on the Cornbrook viaduct to cross over the Castlefield lines and then join a bit further on, grade separating them.

2. Likewise at the Ordsall junction for the Windsor link, grade separate Windsor northbound traffic with a diveunder the Eccles line.

The above two removes some of the conflicting moves. Nothing you can do about Ordsall chord (other than go back in time and not build it, but we are where we are).

3. Extend the platform 1 at Oxford Road. It looks like there is space on the formation to do this up to a bridge at Gloucester Street, but this could be extended over the road relatively simply.

4. Put lifts, etc., into platform 1.

This gives you the same platforming capacity you would have had with 15 and 16 to allow trains to wait if necessary. It also allows platform 1 to be used as a terminating and turnaround platform if necessary without blocking the rest during the turnaround time.

5. Chat Moss stoppers, Southport / Kirkby, Blackpool and Barrow / Windermere go to Victoria, or the odd one can go to Oxford Road (perhaps one path an hour can be alternated between them). Additional peaks go to Oxford Road only.

6. There's space to slew the Metrolink lines at Victoria to the south east and therefore shift the line entering platform 1. Platforms 1 and 2 could therefore be extended under Cheetham Hill Road.

7. There's also plenty of space including the old chord from Victoria to Queen's Road for turnback sidings so that Eastbound terminators don't hold up the platforms.

8. If push comes to shove there's also space for a "Victoria West" terminating couple of bay platforms for peak hours.

For shoppers / many commuters / day trippers, Victoria and Oxford Road are more convenient than Piccadilly anyway. So why the obsession with everything having to run through to 13/14 and on to the airport?

Onward connectivity is one, but there are plenty of ways to interconnect without all services having to serve Pic. It's a legacy of 1980s rationalisation. Like when they wanted to close Marylebone station in London.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,337
So why the obsession with everything having to run through to 13/14 and on to the airport?
The airport is just a convenient place to terminate trains. There isn't capacity to terminate them at Victoria or Oxford Road instead until your west bays are built - maybe Salford Central ought to be rebuilt with some west facing bays.

Once on the Castlefield corridor it is clearly more useful to send the trains to the Airport than Mayfield Loop / Longsight etc.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,434
Location
A typical commuter-belt part of north-west England
This is a fantasy thread of course, so we can propose any ideas.

1. Move Metrolink (partially) across to the Deansgate GNR viaduct to the West. The Eastbound CLC line can then use space on the Cornbrook viaduct to cross over the Castlefield lines and then join a bit further on, grade separating them.
Albeit a fantasy idea, in what condition is the viaduct suggested actually in at present. Has anyone information concerning the last official document that made a condition report upon it and were any cost proposals made for a full reinstatement of the track bed of the viaduct of the type that would have the strength to take light rail movements upon it.
 

Glenn1969

Established Member
Joined
22 Jan 2019
Messages
1,983
Location
Halifax, Yorks
Remember that DfT want Castlefield solved at least short or medium term with as close to zero infrastructure spend as they can get
 

domcoop7

Member
Joined
15 Mar 2021
Messages
272
Location
Wigan
Albeit a fantasy idea, in what condition is the viaduct suggested actually in at present. Has anyone information concerning the last official document that made a condition report upon it and were any cost proposals made for a full reinstatement of the track bed of the viaduct of the type that would have the strength to take light rail movements upon it.
Not sure, although Wikipedia says that the Cornbrook viaduct was chosen because the older one was in poorer condition. But the cost of getting something that exists and is built up to scratch for light rail use would surely be an order of magnitude cheaper than four tracking Castlefield (which keeps the at grade junctions anyway as Freightliner still need access to the mainline) or building tunnels / lifting Piccadilly up with a fleet of Chinooks and dropping it in St Peter's square / etc)?
 

Killingworth

Established Member
Joined
30 May 2018
Messages
6,479
Location
Sheffield
The airport is just a convenient place to terminate trains. There isn't capacity to terminate them at Victoria or Oxford Road instead until your west bays are built - maybe Salford Central ought to be rebuilt with some west facing bays.

Once on the Castlefield corridor it is clearly more useful to send the trains to the Airport than Mayfield Loop / Longsight etc.
Except there are aren't enough, or long enough, platforms at the Airport to accept all the trains some would have terminating there.

If there were there'd be a lot of surplus capacity from Piccadilly to the airport.

So we go back to frequent shuttles of short trains from Piccadilly to the airport from, maybe, bay platforms 15 and 16 rather than planned through platforms?

So far so good/bad, but where could the long distance trains then terminate? Stockport Platform 0, or those old bay platforms, both too short and one with lifted track and obstructed anyway! Maybe not.

Which brings us back to sending a long distance train on another long distance leg across the country. Which results in greater probability of delays, and we're back to square one.

No easy answers in the short term because every one that's suggested adds a problem for someone, somewhere else.

Lots of little alterations will be tried over the next 10 - 20 years but what's needed can't be achieved above ground. I've brought it up before.

The only satisfactory solution is a brand new underground circle or box below Central Manchester. Thameslink and Crossrail on a smaller scale but bigger than Liverpool's Wirral loop. The further such tunnels went from the centre the more they'd cost and disrupt, but the more they'd benefit long distance journey times.

Anything less won't allow significant speeding up, extra capacity or extra services. Stuffing ever more onto increasingly fragile Victorian infrastructure guarantees an infinite continuation of the current situation.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
Albeit a fantasy idea, in what condition is the viaduct suggested actually in at present. Has anyone information concerning the last official document that made a condition report upon it and were any cost proposals made for a full reinstatement of the track bed of the viaduct of the type that would have the strength to take light rail movements upon it.

I'm under the impression that restoring the old viaduct to an operational condition isn't a cheap job. Probably nearly cheaper to (somehow) build an entirely new viaduct.
 

Purple Orange

On Moderation
Joined
26 Dec 2019
Messages
3,459
Location
The North
There appears to only be one politically workable solution in town here and that is to build NPR, thus enabling more northern services to operate across Castlefield. Yet I suspect the government doesn't want to do that because Manchester is not London and the north is not the the south east.

Other than that, it would be west facing bays somewhere. Ideally 6 new bays. That is also unlikely to happen for reasons outlined in my first paragraph.

The third way I'd like to see is a 12 tph service, of which 8 tph go to the airport and 4 tph head to Stockport then on only one destination.
 

Hey 3

Member
Joined
13 Aug 2020
Messages
330
Location
Manchester, UK
There appears to only be one politically workable solution in town here and that is to build NPR, thus enabling more northern services to operate across Castlefield. Yet I suspect the government doesn't want to do that because Manchester is not London and the north is not the the south east.

Other than that, it would be west facing bays somewhere. Ideally 6 new bays. That is also unlikely to happen for reasons outlined in my first paragraph.

The third way I'd like to see is a 12 tph service, of which 8 tph go to the airport and 4 tph head to Stockport then on only one destination.
Ideally those bays would be at both Manchester Vic and Picc (both west facing, and possibly Salford Central, Manchester Oxford Road (both west facing) and Stockport (north facing).
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,404
Location
"Marston Vale mafia"
Ideally those bays would be at both Manchester Vic and Picc (both west facing, and possibly Salford Central, Manchester Oxford Road (both west facing) and Stockport (north facing).

Vic has enough space for 2 bays, possibly even 3, butting up against the Arena north of the existing station. There is already a viaduct running to it, too, though no doubt it would need some considerable repairs.

If you added another bridge in the gap you could get 4 in.

Only problem is that they'd be a bit Picc 13-14 in terms of accessing them, you'd need to cross to P6 then walk all the way along.

Roughly where it says "Parking" on this map:
 

Fokx

Established Member
Joined
19 Jul 2019
Messages
1,615
Location
Liverpool
Vic has enough space for 2 bays, possibly even 3, butting up against the Arena north of the existing station. There is already a viaduct running to it, too, though no doubt it would need some considerable repairs.

If you added another bridge in the gap you could get 4 in.

Only problem is that they'd be a bit Picc 13-14 in terms of accessing them, you'd need to cross to P6 then walk all the way along.

Roughly where it says "Parking" on this map:

Take a train into Victoria from the Salford end and you’ll realise that it’s only large enough to fit a two carriage train, of which are minimal to/from Victoria.

That’s before you even begin to try and place buffers, platforms, junctions, footbridge access, signals, points etc.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,404
Location
"Marston Vale mafia"
Take a train into Victoria from the Salford end and you’ll realise that it’s only large enough to fit a two carriage train, of which are minimal to/from Victoria.

You could get at least 3 coaches in there, I measured it up on screen last time it came up in discussion. Probably slightly longer if you slewed the northernmost track into the main "trainshed" over to the south side of the bridge it is on. It isn't quite clear on the image, but it goes right up the arena wall.

If you want something to measure against, there's a 4-car unit of some sort (looks like a 319) in a siding a bit to the west.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
You could get at least 3 coaches in there, I measured it up on screen last time it came up in discussion. Probably slightly longer if you slewed the northernmost track into the main "trainshed" over to the south side of the bridge it is on.

Building 3 car platforms makes no sense when the strategy is for longer trains than this on pretty much all routes. It would be hard-coding in a pretty major constraint.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
Slew that northernmost track over towards the south and you'd easily make it 2 bays fitting 6 each.

Pretty sure off memory it takes that odd routeing because of the levels and to avoid a pretty major.supporting pier of the Arena structure.
 

Fokx

Established Member
Joined
19 Jul 2019
Messages
1,615
Location
Liverpool
You could get at least 3 coaches in there, I measured it up on screen last time it came up in discussion. Probably slightly longer if you slewed the northernmost track into the main "trainshed" over to the south side of the bridge it is on. I

If you want something to measure against, there's a 4-car unit of some sort (looks like a 319) in a siding a bit to the west.

On paper it might work, in practicality it doesn’t.

You are going to need room for “buffer” space between the buffers on the track and the arena wall, and that’s before you even consider they need a connection to the overbridge and platform 6. The end of platform 6 is also VERY narrow
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
On paper it might work, in practicality it doesn’t.

You are going to need room for “buffer” space between the buffers on the track and the arena wall, and that’s before you even consider they need a connection to the overbridge and platform 6. The end of platform 6 is also VERY narrow

Of all the things you don't want a train to collide with, the side wall of a multi-thousand capacity arena is pretty high on this list.
 

Fokx

Established Member
Joined
19 Jul 2019
Messages
1,615
Location
Liverpool
Of all the things you don't want a train to collide with, the side wall of a multi-thousand capacity arena is pretty high on this list.

And that’s not forgetting that it’s structurally it’s connected to the main station. The last thing you’re going to want is an incident similar to the overrun at Kirkby where a train hits the arena structure during an event, and causes parts of the station roofing, bridges and fume vents to collapse into the station
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,322
With sufficient engineering you can engineer that wall to withstand anything a train can reasonably throw at it.

Steel plate construction as an (extreme) example.

It's all extra money to satisfy the safety case however.
 

Purple Orange

On Moderation
Joined
26 Dec 2019
Messages
3,459
Location
The North
6 platforms near Middlewood Locks is what is needed, with metrolink connected to it. I’ll counter the argument that it is not central enough by saying that no station in Manchester is completely central and the city centre reaches this part of the world too.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,404
Location
"Marston Vale mafia"
6 platforms near Middlewood Locks is what is needed, with metrolink connected to it. I’ll counter the argument that it is not central enough by saying that no station in Manchester is completely central and the city centre reaches this part of the world too.

I'd say that's a bit far out.

What was probably needed was not to have closed Central.
 

daodao

Established Member
Joined
6 Feb 2016
Messages
3,601
Location
Dunham/Bowdon
I'd say that's a bit far out.

What was probably needed was not to have closed Central.
No. The main problem is that Victoria was downsized too much and that it can no longer accommodate from the West all the ex-L&Y services that traditionally terminated there. However, it should be used for all trains from Southport, with the electric services from Chorley and beyond routed via the Castlefield line, as is currently proposed.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,404
Location
"Marston Vale mafia"
No. The main problem is that Victoria was downsized too much and that it can no longer accommodate from the West all the ex-L&Y services that traditionally terminated there.

Also fair, unfortunately it was rebuilt at the wrong time, when "everything through Castlefield" was the game. I still hope for the new Eastlands Arena being successful enough that the old one closes, and we could have a decent crack at rebuilding it again with twice as many platforms and a far higher quality passenger environment. That would basically solve the whole thing. Give it the feel of Picc main trainshed (rather than being old New St but worse) and nobody with any sense would ever want to cram themselves onto the horror that is Picc 13/14 ever again, even if it did mean a longer walk.

Victoria as it is is just a dump. OK, a dump with a fancy mural of long-closed lines and a fake-old ticket office, but still a dump. Only if you're using the tram or the relatively small number of trains using the east facing bays is it even vaguely acceptable, and even then it has all the charm of a multi-storey car park where everyone has left all the car engines running.
 