WCML Problems (26/10)

Status
Not open for further replies.

HarleyDavidson

Established Member
Joined
23 Aug 2014
Messages
2,544
The door can be removed and replaced relatively quickly, what will be time consuming will be the calibration of the door mechanism or any damage caused to the door frame.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,878
Location
UK
When someone does reveal what actually happened, it's going to be so disappointing.
 

Zoidberg

Established Member
Joined
27 Aug 2010
Messages
1,270
Location
West Midlands
RAIB has announced that it is investigating.

http://www.raib.gov.uk/publications/current_investigations_register/141026_watford_tunnel.cfm

Extract:

The RAIB is investigating a collision between a train and the door of a lineside equipment cabinet within Watford tunnel on Sunday 26 October 2014. The accident occurred at approximately 07:20 hrs, and involved the 06:42 hrs service from Milton Keynes to London Euston, operated by London Midland.

The train comprised a four-car class 350 electric multiple unit and was travelling at 88 mph when the door of the cabinet struck the underframe of the third coach of the train. The impact caused the cabinet door to become detached and it subsequently hit the side of the tunnel and then a door on the rear coach of the train. This caused significant damage to the train door and penetrated the window, causing some small glass debris to enter the passenger compartment. Fortunately, there were no injuries reported by anyone travelling on the train.

...

The RAIB’s preliminary examination has established that maintenance had been taking place overnight (25/26 October) on the signalling equipment contained within the cabinet. The train which struck the cabinet door was the first train to operate over that line after the maintenance activity had been completed.
...
 
Last edited:

HarleyDavidson

Established Member
Joined
23 Aug 2014
Messages
2,544
The conclusion will be an open & shut case. Signalling case that is.

[I'll get me coat]
 
Last edited:

Tetchytyke

Veteran Member
Joined
12 Sep 2013
Messages
17,516
Location
Isle of Man
Well that incident at Kings Langley is just the latest in a long line of problems on that stretch of line, all stemming from the "upgrade" works in August. Yesterday we had a broken rail and today we had a signalling failure at the same location too.

Network Rail normally issue some glib apologies when things like this happen, but there's not been a peep out of them on the WCML since August, despite several catastrophic infrastructure failures around the Watford area.

It's absolutely pathetic.
 

bILLOO

Member
Joined
6 Jul 2011
Messages
311
More problems this morning in the Watford area with lineside equipment/emergency engineering works. Many trains were routed via the slow lines around Watford.
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,909
Location
Fenny Stratford
Well that incident at Kings Langley is just the latest in a long line of problems on that stretch of line, all stemming from the "upgrade" works in August. Yesterday we had a broken rail and today we had a signalling failure at the same location too.

Network Rail normally issue some glib apologies when things like this happen, but there's not been a peep out of them on the WCML since August, despite several catastrophic infrastructure failures around the Watford area.

It's absolutely pathetic.

But the current issues dont stem from the upgrade works...........
 

bnsf734

Member
Joined
15 Oct 2007
Messages
647
Location
Nuneaton
I travelled from Nuneaton to London and back today and I think WCML perfomance today was utter rubbish!

Started at Nuneaton for the 0928 to Euston which left Crewe 25 late and then was delayed further due to a bridge strike near Lichfield/Rugeley. The train eventually left Nuneaton about 1010 and was terminated short at MKC. Train forward from MKC was also 10' late so I eventually got to EUS 1 hr 20 late. (Got my delay/repay ready!)

Coming back tonight was also rubbish as most of the stoppers from EUS to MKC were about 20' late and were about 5 mins apart at Tring. Think this was all due to the signal problems at Watford Jct earlier.

Every LM train I travelled today was late but I think Network Rail will be paying the compo to LM.
 

carriageline

Established Member
Joined
11 Jan 2012
Messages
1,897
But the current issues dont stem from the upgrade works...........


Sorry, but that's not the case. It would seem the recent signalling problems have actually been from the work at Watford, but mainly to do with equipment that isn't (or well, not meant to be!!) in use yet.


Sent from my iPhone using Tapatalk
 

nr_signaller

Member
Joined
6 Feb 2011
Messages
94
carriageline:1969048 said:
But the current issues dont stem from the upgrade works...........


Sorry, but that's not the case. It would seem the recent signalling problems have actually been from the work at Watford, but mainly to do with equipment that isn't (or well, not meant to be!!) in use yet.


Sent from my iPhone using Tapatalk

I am not so sure. The open door on the location cabinet and the issue at Watford yesterday, yes (after I had written my comment!), but generally no. Points Bourne End... ibj and rail defects.. all existing stuff.
 

carriageline

Established Member
Joined
11 Jan 2012
Messages
1,897
Sorry, I was mainly talking about the last few days (the TPWS and the points failure)


Sent from my iPhone using Tapatalk
 