• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

WCML fast line shutdown after 10pm Euston to Milton Keynes

Status
Not open for further replies.

Railperf

Established Member
Joined
30 Oct 2017
Messages
3,684
Is it my imagination or is only the WCML whose fast lines shut sometime after 10pm on weekdays - meaning all express trains end up routed on the slow lines extending journey times? On all the other main lines - GWML, ECML, GEML, MML, i'm sure both the Slow and fast lines remain open until the close of play - unless planned engineering works. Does anyone know why this appears to be unique to the WCML?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,865
Location
Beeston (Notts)
A possible guess for the Euston - MK stretch is that works are currently underway for the re-commenced WCML Power Supply Upgrade, which was until recently mothballed between North Wembley & Bourne End (Herts). Small part steel has gone up in the Bushey/Carpenders Park area to this effect.

As for the ECML, all lines have to close at the same time as it's paired by direction rather than speed, and you can't jolly well shut only the Down lines on their own!

I'm sure similar track pair switching rules occur on the GW/M/GE main lines too.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,728
Is it my imagination or is only the WCML whose fast lines shut sometime after 10pm on weekdays - meaning all express trains end up routed on the slow lines extending journey times? On all the other main lines - GWML, ECML, GEML, MML, i'm sure both the Slow and fast lines remain open until the close of play - unless planned engineering works. Does anyone know why this appears to be unique to the WCML?

A possible guess for the Euston - MK stretch is that works are currently underway for the re-commenced WCML Power Supply Upgrade, which was until recently mothballed between North Wembley & Bourne End (Herts). Small part steel has gone up in the Bushey/Carpenders Park area to this effect.

As for the ECML, all lines have to close at the same time as it's paired by direction rather than speed, and you can't jolly well shut only the Down lines on their own!

I'm sure similar track pair switching rules occur on the GW/M/GE main lines too.
Standard two track railway, been like that since West Coast Route Mod, if not before. Bushey power supply normally gets done in the disruptive bank holiday blocks.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,390
Is it my imagination or is only the WCML whose fast lines shut sometime after 10pm on weekdays - meaning all express trains end up routed on the slow lines extending journey times?
MML is two track from 2300 each night.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,308
@Bald Rick has answered this question before, I believe. It becomes a two track railway in the evenings.
It’s certainly been answered just within the last few weeks, IIRC after west coast route modernisation Virgin insisted on weekday evening closures in preference to regular Sunday closures for normal planned maintenance activities.

Ah, here we are, basically the same discussion started only last week:
 
Last edited:

Hadrian

Member
Joined
28 Jan 2019
Messages
45
Location
Bardon Mill
As I remember it the evening/night arrangements for the London end of the WCML are provision for all trains to be pathed to operate over one pair of tracks and to be timed to the speed limitations of the slow lines. On any specific occasion engineers' possesion(s) can be taken for part or all of either the fast lines or the slow lines (or alternatively part(s) of the fasts and different part(s) of the slows). These arrangements were initially very similar to the Saturday nights and Sundays (until approx 1600) which had applied for many years. I do not know whether the additional provision for centre tracks possessions, leaving the down fast and the up slow open for traffic, which used to apply at weekends, also now applies to weeknights. I ceased to be involved in specifying the relevant rules of the route too many years ago to be fully aware of the current details - including whether the timing allowances provide for two or more fast to slow (or vice versa) crossing moves.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,728
As I remember it the evening/night arrangements for the London end of the WCML are provision for all trains to be pathed to operate over one pair of tracks and to be timed to the speed limitations of the slow lines. On any specific occasion engineers' possesion(s) can be taken for part or all of either the fast lines or the slow lines (or alternatively part(s) of the fasts and different part(s) of the slows). These arrangements were initially very similar to the Saturday nights and Sundays (until approx 1600) which had applied for many years. I do not know whether the additional provision for centre tracks possessions, leaving the down fast and the up slow open for traffic, which used to apply at weekends, also now applies to weeknights. I ceased to be involved in specifying the relevant rules of the route too many years ago to be fully aware of the current details - including whether the timing allowances provide for two or more fast to slow (or vice versa) crossing moves.
Centre lines generally need all lines now.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,942
To add to the above, the WCML has been a two track railway overnight since time immemorial, and not just since Route Mod. Indeed, before about 1982, there was a two track railway somewhere between Willesden and Hanslope every weekday between the peaks.

As others have said the MML is a two track railway overnight too (As I will find again later this evening).

And there is planned engineering work every night somewhere on the closed lines Of the WCML - it takes a lot of maintenance as it gets a hammering.
 
Last edited:

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,940
Location
Mold, Clwyd
To add to the above, the WCML has been a two track railway overnight since time immemorial, and not just since Route Mod. Indeed, before about 1982, there was a two track railway somewhere between Willesden and Hanslope every weekday between the peaks.
As others have said the MML is a two track railway overnight too (As I will find again later this evening).
And there is planned engineering work every night somewhere on the closed lines.
Something else that should be bypassed with HS2 (south of Handsacre, or however far it gets).
HS2 itself will be able to close one track for maintenance while the other track remains open between crossovers.
 
Joined
30 Jun 2022
Messages
85
Location
Scarborough
Are there ever occasions on fast and slow lines where one slow and one fast have been out of action with up or down trains being routed on the outer lines and while the inner two lines are closed?
 

Hadrian

Member
Joined
28 Jan 2019
Messages
45
Location
Bardon Mill
To add to the above, the WCML has been a two track railway overnight since time immemorial, and not just since Route Mod. Indeed, before about 1982, there was a two track railway somewhere between Willesden and Hanslope every weekday between the peaks.

As others have said the MML is a two track railway overnight too (As I will find again later this evening).

And there is planned engineering work every night somewhere on the closed lines.

The WCML daytime 'weave' in the 70s and early 80s was a operational nightmare. The times for possession of the two tracks were significantly different for the two directions, which made for plenty of conflict at the junctions at each end of the section. During these times at the beginning or the end of the weave period all down trains could conflict with all up trains twice. Fortunately there were rather fewer trains in those days.

Even when both directions were weaved (in the middle part of the period) the convergence from four tracks to two at the junctions at each end still left plenty of conflicting movements. The additional recovery time during the weave period, while sufficient for slow line running for trains which would normally use the fast lines, did not adequately allow for delays from conflicts at fast/slow junctions. In those days class one (InterCity) trains almost always took precedence, so the class two local service often suffered from poor punctuality.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,728
Are there ever occasions on fast and slow lines where one slow and one fast have been out of action with up or down trains being routed on the outer lines and while the inner two lines are closed?
No, as it brings in adjacent line open issues. Centre lines need an all line block.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,865
Location
Beeston (Notts)
Different region, NW&C don't do it for whatever reason.
East Coast don't do it either.

I'm surprised NW&C don't do it on the Trent Valley section of the WCML - all that bi-directional signalling seems a tad pointless now!
Then again, I suppose it could easily be worked like the southern section of the WCML (paired by speed).
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,728
East Coast don't do it either.

I'm surprised NW&C don't do it on the Trent Valley section of the WCML - all that bi-directional signalling seems a tad pointless now!
Then again, I suppose it could easily be worked like the southern section of the WCML (paired by speed).
The Trent Valley bidi isnt set up to do that. It only allows two track pairs.
 

Boodiggy

Member
Joined
8 Nov 2012
Messages
642
East Coast don't do it either.

I'm surprised NW&C don't do it on the Trent Valley section of the WCML - all that bi-directional signalling seems a tad pointless now!
Then again, I suppose it could easily be worked like the southern section of the WCML (paired by speed).
If you used only the outside lines in the Trent you wouldn’t need Bi-Di! Plus the outside lines are not bi-di signalled. But the Bi-Di gets plenty of use midweek nights.
 
Status
Not open for further replies.

Top