WCML Easter 2023 Engineering Works?

Status
Not open for further replies.

matt

Forum Staff
Staff Member
Global Moderator
Joined
30 Jun 2005
Messages
8,836
Location
Rugby
Does anyone know what engineering works is planned for Easter 2023, specifically the southern WCML?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,647
Does anyone know what engineering works is planned for Easter 2023, specifically the southern WCML?
Last plan I saw was all lines closed MK to Euston for the four days, as is Norton Bridge to Crewe. Pretty much all of it is closed Easter Sunday as far as Carlisle.
 

philosopher

Established Member
Joined
23 Sep 2015
Messages
1,513
Last plan I saw was all lines closed MK to Euston for the four days, as is Norton Bridge to Crewe. Pretty much all of it is closed Easter Sunday as far as Carlisle.
The WCML being closed somewhere south of Rugby is fast coming an Easter tradition. 2021 is the only year in recent years I actually remember the WCML south being open over most of the four day Easter period.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
The WCML being closed somewhere south of Rugby is fast coming an Easter tradition. 2021 is the only year in recent years I actually remember the WCML south being open over most of the four day Easter period.
Roll on HS2 then, which will bypass the most troublesome sections of the WCML, and never (well, hardly ever) close.
But before then HS2 construction will cause WCML disruption at Euston, Handsacre (north of Lichfield), and Crewe and doubtless some other places.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,647
Roll on HS2 then, which will bypass the most troublesome sections of the WCML, and never (well, hardly ever) close.
But before then HS2 construction will cause WCML disruption at Euston, Handsacre (north of Lichfield), and Crewe and doubtless some other places.
Handsacre won't do much apart from when the flyover is needed, slow lines for most of that. Euston is already as disruptive as it can be with high side blocks. Crewe will be big though, though its not technically HS2 related. Domestic renewals will be more disruptive on all regions, depending on how much the asset has to be sweated going forward.
 