The only problem then that there were a number of sections that had been (short-sightedly) reduced to single track. Haven't been back there for yonks now, so don't know how much remains single ? But the trains were diverted back then, got a bit delayed waiting paths, but managed to get through okay eventually.
There were also many fewer trains - both requiring diversion and running in normal service on the diversionary route - so paths were easier to come by.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,378
The only problem then that there were a number of sections that had been (short-sightedly) reduced to single track. Haven't been back there for yonks now, so don't know how much remains single ? But the trains were diverted back then, got a bit delayed waiting paths, but managed to get through okay eventually.
Byt isn't there a significant viaduct where the track was singled to avoid a massive rebuild? (like at Ribblehead - where it was renovated anyway!) I think west of Gretna it was re-doubled anyway when trains of imported coal came south that way.
 

jfollows

Established Member
Joined
26 Feb 2011
Messages
10,181
Location
Wilmslow
The only problem then that there were a number of sections that had been (short-sightedly) reduced to single track. Haven't been back there for yonks now, so don't know how much remains single ? But the trains were diverted back then, got a bit delayed waiting paths, but managed to get through okay eventually.
Today single line only
  • Kilmarnock - Lochridge Junction (S of Stewarton) just over 4 miles
  • Lugton (N of Dunlop) - Barrhead about 6 miles
so it's not too bad.

Railway Track Diagrams: Scotland & Isle of Man, TRACKmaps 7th. Edition 2021
 

Falcon1200

Established Member
Joined
14 Jun 2021
Messages
6,637
Location
Neilston, East Renfrewshire
Back in BR days it would be a diesel on the front and off via the G&SW - isn't the privatised railway wonderful!

In 2016, during the Lamington blockage, many trains, not just Virgin but also Sleeper and freights, were diverted via the G&SW, however that closure lasted around 3 months ! Arranging such things at short, or as here no notice at all, takes time.

The only problem then that there were a number of sections that had been (short-sightedly) reduced to single track. Haven't been back there for yonks now, so don't know how much remains single ?

Just as @jfollows says, plus there is the single lead junction at Gretna.

Byt isn't there a significant viaduct where the track was singled to avoid a massive rebuild?

Not as far as I know, no. The redoubling between Lugton and Kilmarnock was to enable a half-hourly Glasgow/Kilmarnock service, no more work than needed for that was done (plus Lochridge/Kilmarnock redoubling would require Kilmaurs platform to be relocated from the unused trackbed !)
 

jfollows

Established Member
Joined
26 Feb 2011
Messages
10,181
Location
Wilmslow
In 1987 there was additionally ~8 miles of single track Gretna-Annan, plus Kilmarnock-Barrhead was single track all the way (17 miles) with a passing loop at Lugton. So it's a lot better today than it was!
 

Agent_Squash

Established Member
Joined
22 Jul 2016
Messages
1,271
Maybe they are turning them round at Preston because it's more convenient for crews (As I presume Polmadie staff usually work north of Preston)

Is this heat related by any chance?

Avanti terminate everything at Preston when something happens as it’s operationally convenient.

It’s a shame that they don’t realise that they’re leaving half the WCML with a shambolic service when they can go up to Carlisle.
 

Peter0124

Established Member
Joined
20 Nov 2016
Messages
2,755
Location
Glasgow
I do find it a tad ironic that we aim to electrify the network, yet we find ourselves having the bad side effects of such equipment :D

(We should still electrify most of the network though, but keep it as robust as possible)
 

londonmidland

Established Member
Joined
22 Dec 2009
Messages
2,382
Location
Leicester
1M97 has been stuck at Wamphray (Beattock) for several hours now. Not sure if/when the evacuation took place for pax onboard.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,404
How long would it take to get a few 221’s up to Preston and then run them up via the GSW? Surely quicker than arranging all this acceptance and buses!
I’d apply for a job with Avanti Control next time one comes up…………

== Doublepost prevention - post automatically merged: ==

A 1Z99 drew up alongside it about a couple of hours ago - I assume that was a passenger rescue.
You are correct, 1Z99 did a train to train evacuation.
 

Huntergreed

Established Member
Associate Staff
Events Co-ordinator
Joined
16 Jan 2016
Messages
3,178
Location
Dumfries
I see they are now running a pair of 221's via the GSW.

1S72 (10 Car) just left Carlisle and (I presume!) is coming up my way.
 

voyagerdude220

Established Member
Joined
13 Oct 2005
Messages
4,290
I see they are now running a pair of 221's via the GSW.

1S72 (10 Car) just left Carlisle and (I presume!) is coming up my way.

Yep- 221103/221101 which had previously been working 13:43 Euston to Blackpool.

Also later on there appears to be a 21:51 Carlisle to Glasgow Central via Dumfries- presumably 221118/221102 which had been working 9P85 15:43 Euston to Blackpool.
 

Peter0124

Established Member
Joined
20 Nov 2016
Messages
2,755
Location
Glasgow
Also, rather unimportant but I wonder what will happen to this charter service tomorrow if the lines through Beattock are still affected? I'm wanting to catch this in Glasgow tomorrow so fingers crossed it runs :D
 

Andy R. A.

Member
Joined
25 Aug 2019
Messages
221
Location
Hastings, East Sussex.
Looking back at my own personal archive on how things 'panned out' during a similar blockage at Lockerbie 45 years ago, although this time caused through storm damage. You need to skip the entry at the top for the Sunday and start on Monday 31.10.77, and then Tuesday 01.11.77 Being 300 odd miles away to the south it's mostly the Up Traffic featured in the delays.


 

Huntergreed

Established Member
Associate Staff
Events Co-ordinator
Joined
16 Jan 2016
Messages
3,178
Location
Dumfries
Also, rather unimportant but I wonder what will happen to this charter service tomorrow if the lines through Beattock are still affected? I'm wanting to catch this in Glasgow tomorrow so fingers crossed it runs :D
I suppose it could run up the GSW and across the rarely used stretch of track between Muirhouse central jn and Larkfield jn - would make for an interesting diversion!
 

43055

Established Member
Joined
8 Mar 2018
Messages
3,695
Yep- 221103/221101 which had previously been working 13:43 Euston to Blackpool.

Also later on there appears to be a 21:51 Carlisle to Glasgow Central via Dumfries- presumably 221118/221102 which had been working 9P85 15:43 Euston to Blackpool.
Also got 221108/114 on the 1643 to Edinburgh which get's to Carlisle at 2105.

I'd like to see the 20 car 390 in Glasgow tonight :lol: (I know it's a thing with RTT)
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,359
Location
Glasgow
Also got 221108/114 on the 1643 to Edinburgh which get's to Carlisle at 2105.

I'd like to see the 20 car 390 in Glasgow tonight :lol: (I know it's a thing with RTT)
Seems to have been fixed, the link only shows an 11-car - 390121
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,404
There’s the possibility of today’s disruption affecting tomorrow’s service.

Awaiting more info.
Network Rail tweeting will take 12 hours to repair (once the stranded train has been moved using a rescue loco), and will affect the first few hours of service tomorrow while route is closed.
 

voyagerdude220

Established Member
Joined
13 Oct 2005
Messages
4,290
I'm wondering whether Avanti will be unable to run their first few trains early tomorrow morning (assuming the problem is fixed overnight which is unlikely) given the shortage of Pendolinos on Polmadie.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,404
I thought that they would have a contingency already in place for running down the ECML??

Seems awfully short-sighted if this is no longer an option.
Where do you get the drivers at this short notice?
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,141
Location
Redcar
I thought that they would have a contingency already in place for running down the ECML??

Seems awfully short-sighted if this is no longer an option.
They can do it as long as they can find the drivers. If GBRf don't have drivers available then it ain't going to happen. Caledonian Sleeper do regularly divert via the ECML but usually with a bit more notice!
 

diffident

Member
Joined
19 Feb 2018
Messages
345
Location
West Midlands
They can do it as long as they can find the drivers. If GBRf don't have drivers available then it ain't going to happen. Caledonian Sleeper do regularly divert via the ECML but usually with a bit more notice!
I understand. I just think that in other industries, such as that which I work in, we have well rehearsed and immediately available contingency plans to activate when something goes wrong.

I could be wrong, but it smacks of cost cutting to the bone in favour of profit and not customer service to me.
 

Peregrine 4903

Established Member
Joined
18 Aug 2019
Messages
1,519
Location
London
I understand. I just think that in other industries, such as that which I work in, we have well rehearsed and immediately available contingency plans to activate when something goes wrong.

I could be wrong, but it smacks of cost cutting to the bone in favour of profit and not customer service to me.
The rail industry also has well rehearsed and immediately available contingency plans to activate.

I just don't think you understand how hard it is to resource a driver at the last minute, and remember the is GBRF who need to resource the driver, and they are not a passenger company.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,749
LNE would have to stand down any standard section 4 and 5 engineering blocks at late notice, doable, but they have to catch up.
 

Carntyne

Member
Joined
8 Jul 2015
Messages
1,033
I understand. I just think that in other industries, such as that which I work in, we have well rehearsed and immediately available contingency plans to activate when something goes wrong.

I could be wrong, but it smacks of cost cutting to the bone in favour of profit and not customer service to me.
What profit? The sleeper is one of the most heavily subsidised services in the UK.
 