boiledbeans2
Member
I'm trying to find out if the WCML will be shut over the 2026 Xmas to new year period. Specifically, the Euston to Birmingham or Euston to Manchester sections.
My origin is Watford Junction. I will definitely be travelling to Central London (Probably the Lioness DC line will still run if the LNWRs don't. If not, then the Met line.) I am also considering travel up north to Birmingham or Manchester.
I can't find anything on the Avanti/LNWR/National Rail websites as it's apparently too early. But I've read on this forum that major engineering works are planned way in advance (a year?)
Does anyone have insider info on the WCML services during Xmas/new year?
My origin is Watford Junction. I will definitely be travelling to Central London (Probably the Lioness DC line will still run if the LNWRs don't. If not, then the Met line.) I am also considering travel up north to Birmingham or Manchester.
I can't find anything on the Avanti/LNWR/National Rail websites as it's apparently too early. But I've read on this forum that major engineering works are planned way in advance (a year?)
Does anyone have insider info on the WCML services during Xmas/new year?