So for the next three weeks platform 10 at Watford Junction sn't available.
As a result the two peak time trains that serve Bushey / Harrow and Wealdstone both didn't run.
Two other trains have additional stops to cover - except those are already crush loaded on leaving WFJ! 2K55, despite being 12 cars in length, struggled to shut the doors at Bushey and the guard attempted to have the service set down only at Harrow, with predictable results -even more tried to get on at Harrow, and again they couldn't depart until the driver announced on the PA that another service was stood behind at the next signal and just enough got off to shut the doors..
I can't believe this sort of work gets scheduled for the three weeks before Christmas, surely things are busy these next few weeks
As a result the two peak time trains that serve Bushey / Harrow and Wealdstone both didn't run.
Two other trains have additional stops to cover - except those are already crush loaded on leaving WFJ! 2K55, despite being 12 cars in length, struggled to shut the doors at Bushey and the guard attempted to have the service set down only at Harrow, with predictable results -even more tried to get on at Harrow, and again they couldn't depart until the driver announced on the PA that another service was stood behind at the next signal and just enough got off to shut the doors..
I can't believe this sort of work gets scheduled for the three weeks before Christmas, surely things are busy these next few weeks