II.1.5) Short description of the contract or purchase(s):
Network Rail Infrastructure Limited (“NRIL”) is using an alliance contracting arrangement to procure the programme of works (design & execution) and ancillary services and supplies relating to the Wessex Capacity Programme which will increase train and passenger capacity at London Waterloo Station and across the Wessex Route. The works involve bringing the Waterloo International Terminal back into use for domestic train services, increasing the length of some platforms at London Waterloo Station, alterations to the track, signalling, communications, buildings and civils infrastructure on the Wessex Route and at Waterloo, Vauxhall, Clapham Junction, Richmond, Wimbledon and Surbiton Stations. The design of works for Woking Grade separation is also included and the potential for resultant works – see section II.2.1 below. Under the alliance contracting arrangements NRIL will provide certain works and/or services as a participant in the alliance, and the contractors and NRIL each as an alliance participant will work as an integrated team providing resources on a best for project basis and sharing risk and reward.
II.2.1) Total quantity or scope:
NRIL wishes to provide an opportunity, under this call for competition, for either an economic operator or economic operators, working in a consortium (see section III.1.3), to deliver this multi-disciplinary programme of works, comprising buildings, civils, track, signalling and communication railway construction works on a design & execution basis. The works will be undertaken in and around London Waterloo Station and on the Wessex Route via stations at Vauxhall, Clapham Junction, Richmond, Wimbledon and Surbiton in southeast England. The design of works for Woking Grade Separation is also included and at the option of NRIL the works related to this may be awarded under the contract awarded pursuant to this procurement depending on inter alia the funding being allocated. The economic operator, or economic operators must be capable of undertaking the key disciplines of building, civils, track, signalling and communication railway construction works on a design & execution basis (see section III.1.3).
Estimated Value Range: between 200 000 000 and 300 000 000 GBP with an additional potential 100 000 000 GBP if the option for works at Woking Grade Separation is exercised – see the explaination above.
Estimated value excluding VAT
Range: between 200 000 000 and 400 000 000 GBP
II.2.2) Information about options
Options: yes
Description of these options: Please see option regarding Woking Grade Separation explained at section II.2.1. Completion date detailed at section II.3 2021 below assumes that the Woking Grade Separation option is exercised. If this option is not exercised the estimated completion date for the remainder of the works is 31.3.2019.
II.3) Duration of the contract or time limit for completion
Starting 1.1.2015 Completion 31.3.2021