Was the introduction of the 2009TS smooth?

RacsoMoquette

Member
Joined
24 Nov 2023
Messages
324
Location
South Cambridgeshire
How was the introduction of the 2009TS I don’t seem to remember it taking as long as the 2024TS. After they had their sensitive door troubles they settled down to be very reliable and dependable trains which they still are today, though they are crying out for a referbishemnt. After over fifteen years of intensive use on the Victoria Line.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Silent

Member
Joined
31 Mar 2016
Messages
759
Location
London
How was the introduction of the 2009TS I don’t seem to remember it taking as long as the 2024TS. After they had their sensitive door troubles they settled down to be very reliable and dependable trains which they still are today, though they are crying out for a referbishemnt. After over fifteen years of intensive use on the Victoria Line.


I think new trains seem to take longer to go into service. I remember it being smoother but then there wasn’t as much social media coverage to point out a late launch. I think class 378 was a bit late into service however class 710s was at least a year late.

But 2009 ts look much more conventional than 2024 ts so it’s understandable it was a smoother launch.
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,443
Location
Hertfordshire / Teesdale
How was the introduction of the 2009TS I don’t seem to remember it taking as long as the 2024TS. After they had their sensitive door troubles they settled down to be very reliable and dependable trains which they still are today, though they are crying out for a referbishemnt. After over fifteen years of intensive use on the Victoria Line.

Depends on your definition of smooth. There was a lot of testing of the prototypes, which ultimately led to the two pre-production trains being scrapped and replaced.

However yes from a passenger point of view once they were in service it all went fairly smoothly, apart from the sensitive edge as you mentioned.

If anything the S stock took longer to settle down.
 

RacsoMoquette

Member
Joined
24 Nov 2023
Messages
324
Location
South Cambridgeshire
Depends on your definition of smooth. There was a lot of testing of the prototypes, which ultimately led to the two pre-production trains being scrapped and replaced.

However yes from a passenger point of view once they were in service it all went fairly smoothly, apart from the sensitive edge as you mentioned.

If anything the S stock took longer to settle down.
It seemed like an awful waste to scrap them, surely they could have been heavily modified to be compatible with the production fleet.

== Doublepost prevention - post automatically merged: ==


It even says here that the trains introduction was ahead of schedule being “Two Years Early”
 

TFN

Member
Joined
17 Aug 2017
Messages
465
Location
London
There was a lot of testing of the prototypes, which ultimately led to the two pre-production trains being scrapped and replaced.
Our of curiosity, what differences were there between the prototypes and the final product?
 

Silent

Member
Joined
31 Mar 2016
Messages
759
Location
London
Our of curiosity, what differences were there between the prototypes and the final product?


I’m not sure but I’m pretty sure there are minor differences in the interior. I’m guessing the final product is more practical or more disability friendly as I’m sure the dot matrix display is a bit different and also the grab rails by the doors and the plastic casing.
 

starlight73

Member
Joined
1 May 2024
Messages
174
Location
London
According to another forum it was cheaper to scrap the prototypes and build two new trains, than refit them to specification.


If you think about the amount of time CLIP has spent dealing with complicated modifications on the central line at the prototyping stage … (although of course it’s probably not the same)
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,443
Location
Hertfordshire / Teesdale
Our of curiosity, what differences were there between the prototypes and the final product?

Can’t answer this I’m afraid, however I know it was widely started at the time that the cost and/or complexity of modifying the trains made is easier and/or cheaper to simply build two from scratch. Presumably some parts were able to be re-used.

At least one of the pre-production trains ended up at Spadeadam alongside the Potters Bar 365 vehicles.

ISTR the S stock has or certainly had two trains with very slightly different traction packages for similar reasons. Others may be able to comment further, however there is definitely some truth in this as the two trains did, and may still, sound slightly different.
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,800
Location
Somewhere, not in London
Can’t answer this I’m afraid, however I know it was widely started at the time that the cost and/or complexity of modifying the trains made is easier and/or cheaper to simply build two from scratch. Presumably some parts were able to be re-used.

At least one of the pre-production trains ended up at Spadeadam alongside the Potters Bar 365 vehicles.

ISTR the S stock has or certainly had two trains with very slightly different traction packages for similar reasons. Others may be able to comment further, however there is definitely some truth in this as the two trains did, and may still, sound slightly different.

The list of what IS the same is shorter.

Bogies, Traction Equipment, some MITRAC modules, is about it really.
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,800
Location
Somewhere, not in London
“Tim O’Toole” is current S8 21099/21000. Originally a 7-car pre-production test train delivered 21/10/2009.
Also one of the ATMS units then with laser geometry, video inspection and other test equipment on the underside of 23099.

Same equipment that is fitted to the last two 2009TS to be built, 11001 and 11003.
 