Good afternoon, for the past few weeks whilst travelling between Wakefield and Doncaster I have noticed a number of new signals that have been installed, however they are not yet operational and still have the heads covered.
It looks like all signals between Wakefield and Doncaster in both directions are being moved slightly and replaced
I also noticed there are quite a lot of lineside signs that have also been installed but are also covered, the same size and locations as speed limit signage.
My question is apart from the new signals what other anticipated changes are on the horizon between Wakefield and Doncaster, maybe increased line speed??
If the lineside signs were just like for like there I feel there would be no reason for them to be covered up.
Also, any idea when the new signals may come into operation, maybe over the Xmas period??
As usual, thanks in advance
It looks like all signals between Wakefield and Doncaster in both directions are being moved slightly and replaced
I also noticed there are quite a lot of lineside signs that have also been installed but are also covered, the same size and locations as speed limit signage.
My question is apart from the new signals what other anticipated changes are on the horizon between Wakefield and Doncaster, maybe increased line speed??
If the lineside signs were just like for like there I feel there would be no reason for them to be covered up.
Also, any idea when the new signals may come into operation, maybe over the Xmas period??
As usual, thanks in advance