• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

WAG Express

Status
Not open for further replies.

jones_bangor

Member
Joined
11 Mar 2011
Messages
856
Neither can I - whilst there are frequent DMU services in Birmingham/ Manchester/ Glasgow etc, there are at least electrified lines there too.

The Valley Lines are pretty self contained (if you take a starting point of doing all services through Cardiff Queen Street, with more wired later if that is a success), plus EMUs may cope better with some of the gradients further up the valleys.

I agree about Valley Lines electrification - and the perfect time to do it would be when the current 140 classes become life expired.

There'll be a noise reduction too, those 140s squeal their way round the valleys and make on hell of a noise.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

merlodlliw

Established Member
Joined
8 Mar 2009
Messages
5,852
Location
Wrexham/ Denbighshire /Flintshire triangle
I agree about Valley Lines electrification - and the perfect time to do it would be when the current 140 classes become life expired.

There'll be a noise reduction too, those 140s squeal their way round the valleys and make on hell of a noise.

I agree, just a few minutes wait at Central says it all 140s go up the embankment & over the main lines squealing all the way,a few Hotels around Queen St have treble glazing to keep the squeals out after midnight,(still stock movements all night) however it does not seem to keep the squealing level down coming some of these hotel bedrooms:), stayed at the big sleep,myself I might add, thats how I know, better stop now:oops:

Bob incognito
--- old post above --- --- new post below ---
I must admit I forgot about that line, although yes I agree that it should be electrified also saves ATW a 150 which could boost capacity on services along the north wales coast.

It would save two pair of 150s, Monday to Sat.
--- old post above --- --- new post below ---
Sadly, Bob, its the *same* trains which have been used in the Valleys for a generation or two - this'd be the perfect place to start Pacer replacement IMHO

Yes you are sadly correct, Valley boys think the 140s are buses anyway,which of course they are.

Bob
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,856
I agree about Valley Lines electrification - and the perfect time to do it would be when the current 140 classes become life expired.

I don't know what EMU are likely to be available as cascades but personally I think the ValleyLines project should include wires to Swansea (and prefrablly Cheltenham) and new 377-style units. The 377s would then run all ValleyLines services (with Maesteg trains running through to Ebbw Vale rather than Cheltenham and the proposed second Maesteg per hour provided as an extension of a second Vale Of Glamorgan hourly service), plus an hourly Swansea - Bristol service. If Cheltenham is included that'd be 377 operated as an hourly all-stations from Swansea (allowing the Swansea - Bristol to miss out the Swanline stations, which it would have to serve if Cheltenham is not wired).

That'd probably release half (15) of ATW's 150s, as well as all the Pacers. Here's one suggestion of what to do with the 15 150s:
  • 8 transfered to FGW, alllowing them to scrap their 8 remaining Pacers
  • All 8 153s and 7 150s exchanged for 11 class 156 units
The Oxford/Reading/Newbury electrifications should free up quite a lot of 165s, which could take care of Pacers in the Newcastle area by running on lines they are apparently cleared for already.

Back in Wales, using Wikipedia's current fleet sizes, there would be:
  • ?x Class 377 (ValleyLines)
  • 16x Class 150 (Swansea - Pembroke Dock stoppers, Wrexham - Bidston, other stopping trains)
  • 11x Class 156 (HOWL and Swansea - Milford Haven stoppers)
  • 24x (though hopefully a few more will come our way) Class 158 (Cambrian Lines and Cardiff - Carmarthen/Fishguard/Milford fasts)
  • (Hopefully)6x push-pull LHCS sets (Manchester - Swansea/Carmarthen, plus maybe 1 Holyhead-Cardiff train each way AM and one each way PM)
  • 27x Class 175 (Manchester/Swansea - Carmarthen fasts, remaining express services (eg. North Wales coast))
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,076
Location
Redcar
That'd probably release half (15) of ATW's 150s, as well as all the Pacers. Here's one suggestion of what to do with the 15 150s:
  • 8 transfered to FGW, alllowing them to scrap their 8 remaining Pacers
  • All 8 153s and 7 150s exchanged for 11 class 156 units

Who are you getting the 156s from as FGW don't have any...
 

anthony263

Established Member
Joined
19 Aug 2008
Messages
6,892
Location
South Wales
Who are you getting the 156s from as FGW don't have any...

Northern I suspect.

Also I would include wiring Wrexham - Bidston, stupid why it hasnt been electrified already.

As for emu's why not order from Hitachi, it also keeps the workers at their new factory employed after IEP/SET.

Why not order 377's for northern so that FGW can get more class 319's from thameslink.

They could use some on Bassingstoke - Reading services if the route is wired, perhaps even running some through to Paddington during the peaks which could help relieve overcrowding between Bassingstoke & London waterloo.

Also are the class 165s cleared for the severn beach Line, i am sure there is 1 station which is on a tight curve. the 3 carriage class 166's would be great for services between Bristol TM & Taunton.
 

TDK

Established Member
Joined
19 Apr 2008
Messages
4,164
Location
Crewe
Northern I suspect.

Also I would include wiring Wrexham - Bidston, stupid why it hasnt been electrified already.

As for emu's why not order from Hitachi, it also keeps the workers at their new factory employed after IEP/SET.

Why not order 377's for northern so that FGW can get more class 319's from thameslink.

They could use some on Bassingstoke - Reading services if the route is wired, perhaps even running some through to Paddington during the peaks which could help relieve overcrowding between Bassingstoke & London waterloo.

Also are the class 165s cleared for the severn beach Line, i am sure there is 1 station which is on a tight curve. the 3 carriage class 166's would be great for services between Bristol TM & Taunton.

Why not scrap all trains over 10 years old renew them with new rolling stock - it is down to money
 

merlodlliw

Established Member
Joined
8 Mar 2009
Messages
5,852
Location
Wrexham/ Denbighshire /Flintshire triangle
Northern I suspect.

Also I would include wiring Wrexham - Bidston, stupid why it hasnt been electrified already.


Cost is the simple reason,you can only buy in from one organisation NR


Bob
--- old post above --- --- new post below ---
ATW Stakeholder Managers Michael Vaughan and Ben Davies attended our AGM yesterday when questioned they stated that they have had no indication from WG as to what revised national transport plan or future of WAG Expresses will be and are as much in the dark as the rest of us.

Also said that and I quote directly "there are no capacity issues on valleys lines".


If the suits at ATW dont know whats happening,with only 8 weeks to the new timetable,the staff on Gerald look safe, except of course the two
chefs,unless they are on short contracts.Other catering staff just switch Wag1 to Wag2, just a thought,

Bob
 

Tracky

Member
Joined
18 Jul 2011
Messages
483
I don't know why the Wrexham Bidston electrification rumbles on... It would never cover costs.

The line needs some speed increases and at least one extra unit in the mix to make the timetable easier to maintain. The 150's are excellent workhorses and anybody who complains about them clearly doesn't remember the line only a couple of years ago.

Also I believe the fares are too low and a fair number go uncollected through no fault of the traincrew. Then there is the bus pass issue.

If you can increase passenger numbers through increased reliability then would be the time to look at service frequency. Only if the line could justify a half hourly service for instance would it be worth electrification.

If I ruled the world and its railway I would reinstate the triangle at Dee Marsh and run a single track spur trough Sealand and Blacon to a single platform somewhere near Liverpool Road in Chester. The current city rail bus could be extended to serve the new station and passengers from the local stations could use it rather than flooding the roads at rush hour.
 

Greenback

Emeritus Moderator
Joined
9 Aug 2009
Messages
15,268
Location
Llanelli
I was surprised that the Wrexham - Bidston line only has an hourly service, considering the amount of times electrification has been mentioned. For some reason I thought it was half hourly. Did it ever have a half hourly service?
 

Tracky

Member
Joined
18 Jul 2011
Messages
483
In the good old days it had a much greater service for the huge numbers of workers at Shotton.
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
I don't know why the Wrexham Bidston electrification rumbles on... It would never cover costs.

The line needs some speed increases and at least one extra unit in the mix to make the timetable easier to maintain. The 150's are excellent workhorses and anybody who complains about them clearly doesn't remember the line only a couple of years ago.

Also I believe the fares are too low and a fair number go uncollected through no fault of the traincrew. Then there is the bus pass issue.

If you can increase passenger numbers through increased reliability then would be the time to look at service frequency. Only if the line could justify a half hourly service for instance would it be worth electrification.

If I ruled the world and its railway I would reinstate the triangle at Dee Marsh and run a single track spur trough Sealand and Blacon to a single platform somewhere near Liverpool Road in Chester. The current city rail bus could be extended to serve the new station and passengers from the local stations could use it rather than flooding the roads at rush hour.

Dee Marsh to Chester Northgate was one of the most heavily used routes in the Beeching report slated for closure based on his infamous "duplicate" theory they assumed everyone was doing Birkenhead to Chester...

Realistically by the time the Valleys are electrified 150's will be life expired so posters getting excited about cascades need to think again. The main problem is that yes Valley lines electrification is a logical step for the end of this decade but what does the rest of Wales get?
 

ChiefPlanner

Established Member
Joined
6 Sep 2011
Messages
8,314
Location
Herts
All interesting stuff - and so on , but the case for electrification of even the main line to Swansea wont get there with ideas of class 377 or similar. Just cant be afforded - period .

Ditto the Bidston line - unaffordable at 3d rail , and probably 25kV though an additional DMu service would make sense - and even that would need subsidy.

Times are hard for capital as a well as revenue spend.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
All interesting stuff - and so on , but the case for electrification of even the main line to Swansea wont get there with ideas of class 377 or similar. Just cant be afforded - period .

Ditto the Bidston line - unaffordable at 3d rail , and probably 25kV though an additional DMu service would make sense - and even that would need subsidy.

Times are hard for capital as a well as revenue spend.

If the Cardiff - Swansea line doesn't have a good enough business case (with two or three trains an hour, London services etc) then Wrexham - Bidston must have a much weaker case.

Electrification of Wrexham - Bidston would make more sense if it was tied to both (1) electrification of routes on the fringes of Merseyside (Ormskirk - Preston, Kirkby - Wigan) and a new batch of dual voltage EMUs for Merseyrail. Since neither of those are on the agenda, neither will the Bidston line be.
 

merlodlliw

Established Member
Joined
8 Mar 2009
Messages
5,852
Location
Wrexham/ Denbighshire /Flintshire triangle
I was surprised that the Wrexham - Bidston line only has an hourly service, considering the amount of times electrification has been mentioned. For some reason I thought it was half hourly. Did it ever have a half hourly service?

used to have extra services for Shotton 30 years ago,its hourly yes, but the Chester Rock ferry was also hourly, look at that now, provide the service & it will be used, as for cost, well a lot of dosh as been p....d against the wind in recent years,Roads between Builth & Newtown, dual carriageway with little population,Wagair now a tourist toy , Premier Service with more staff than customers, £millions on dynamic loops with no trains to use them. Sundays on the Bidston Line used to have three return services, now it is increased to six,The Wrexham to Chester line only has an hourly service, but with luck a good £40 millions will be spent on the redouble(£28millions ring fenced).

The Welsh Office pre Wag had access to money to make Bidston to Wrexham 3rd rail, when Chester to Hooton & Ellesmere port went electric, but spent it on roads,

Bob
 
Last edited:

jones_bangor

Member
Joined
11 Mar 2011
Messages
856
Why not scrap all trains over 10 years old renew them with new rolling stock - it is down to money

I don't know what the average age of UK stock is, but there's a lot of trains and coaches on the rails that are 30-something!

I think if there was a full refurbishment every 10 years, that would be something.....
--- old post above --- --- new post below ---
If the Cardiff - Swansea line doesn't have a good enough business case (with two or three trains an hour, London services etc) then Wrexham - Bidston must have a much weaker case.

TBH, I just don't think the passenger numbers are there.
 
Last edited:

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,076
Location
Redcar
I don't know what the average age of UK stock is, but there's a lot of trains and coaches on the rails that are 30-something!

Courtesy of the ORR's National Rail Trends booklet table 6.1b the average of GB rolling stock is currently 17.34 years. With the oldest rolling stock being that of Merseyrail at 32.25 followed by FGW at 28.70. Whilst the youngest rolling stock can be found at London Overground at 1.24 followed by TPE at 5.25.

Source

It's actually quite an interesting table (as is the rest of the document).
 

jones_bangor

Member
Joined
11 Mar 2011
Messages
856
Courtesy of the ORR's National Rail Trends booklet table 6.1b the average of GB rolling stock is currently 17.34 years. With the oldest rolling stock being that of Merseyrail at 32.25 followed by FGW at 28.70. Whilst the youngest rolling stock can be found at London Overground at 1.24 followed by TPE at 5.25.

Source

It's actually quite an interesting table (as is the rest of the document).

The mark 3 stock on East Coast and Great Western must be pushing up their average!

The old bubblecar and the mark 2's can't be helping ATW!!
 

Tracky

Member
Joined
18 Jul 2011
Messages
483
Age is meerly a number...

The key is maintaining trains well and not flogging em with heavy schedules. Also passengers don't help in many cases - I'd hate to see there houses...
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
TBH, I just don't think the passenger numbers are there.[/QUOTE]

The natural destination of a lot of folk in that part of the world is of course Chester which aggravatingly still had its line from Dee Marsh albeit freight only up till the early 90's. However the northern end of the Bidston line is within the Mersey travel to work/ city region zone and should easily support a 30 minute service.

Re Cardiff to Swansea DfT's business case that couldn't be made of course assumed there was only 1 passenger train an hour on this line! 15% of the UK's freight passes over this section of line a lot between Llanwern and Port Talbot steel works DB have made no secret that electric haulage would benefit them.
 

anthony263

Established Member
Joined
19 Aug 2008
Messages
6,892
Location
South Wales
TBH, I just don't think the passenger numbers are there.

The natural destination of a lot of folk in that part of the world is of course Chester which aggravatingly still had its line from Dee Marsh albeit freight only up till the early 90's. However the northern end of the Bidston line is within the Mersey travel to work/ city region zone and should easily support a 30 minute service.

Re Cardiff to Swansea DfT's business case that couldn't be made of course assumed there was only 1 passenger train an hour on this line! 15% of the UK's freight passes over this section of line a lot between Llanwern and Port Talbot steel works DB have made no secret that electric haulage would benefit them.[/QUOTE]

Yes and it seems when they did the study they forgot about the swanline service which could easily go over to emu operation and as FGW have suggetsed run through to Bristol TM. I agree about the freight though considering how much freight runs between Margam & Llanwern i think electric would benefit
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,856
Also I would include wiring Wrexham - Bidston, stupid why it hasnt been electrified already.
I would have suggested it too, but it'd be done at a later date than at the point I was talking about and I expect would need a different electrification team (for 3rd rail rather than OHLE) to be set up. To make it worth setting up such a team, I'd say it should do Southern's two Turbostar routes first and then do Wexham-Bidston on the back of that.

The 3 carriage class 166's would be great for services between Bristol TM & Taunton.
If 166s/165s released by electrification are staying with FGW then that's were I'd suggest putting them too, if they can be cleared cheaply, with an EMU taking over Swansea (rather than Cardiff at present) - Bristol.

Realistically by the time the Valleys are electrified 150's will be life expired so posters getting excited about cascades need to think again. The main problem is that yes Valley lines electrification is a logical step for the end of this decade but what does the rest of Wales get?
It's going to be hard enough to replace Pacers by the 2020 disability complience deadline. I think, like Intercity 125s, the whole Sprinter series is going to need one hell of a lot of life-extension.

All interesting stuff - and so on , but the case for electrification of even the main line to Swansea wont get there with ideas of class 377 or similar. Just cant be afforded - period .

Ditto the Bidston line - unaffordable at 3d rail , and probably 25kV though an additional DMu service would make sense - and even that would need subsidy.
I seem to remember Wrexham - Bidston 3rd rail having two different prices quoted. Unafordable at Network Rail's price, but perhaps not at the lower sum Mersyrail came up with. As for Swansea - Cardff:

Re Cardiff to Swansea DfT's business case that couldn't be made of course assumed there was only 1 passenger train an hour on this line! 15% of the UK's freight passes over this section of line a lot between Llanwern and Port Talbot steel works DB have made no secret that electric haulage would benefit them.

When I really think about it, I think I understand how, given the totally daft way they were looking at it in isolation, the DfT came to that conclusion.
  1. With the rest of the GWML I think they were comparing current IC125s with IEP, hence journey time savings. With Swansea - Cardiff they are comparing IEP electrics to IEP bi-modes, rather than the IC125s. Had they done that elsewhere, I doubt there would have been much in the way of time savings anywhere. From what I've read online, bi-mode IEP, like Voyagers, seems to have been designed to accelerate like an electric train and hence I expect will also drink fuel alot faster than an IC125
  2. The maximum number of electric passenger trains per hour would be three, one to London, one to Bristol and a stopper to Cardiff
  3. The EMU fleet for the Swansea - Bristol and Swansea - Cardiff services would probablly be too small to warrant providing a maintenance facility

However, if you include Swansea-Cardiff with the ValleyLines scheme you have enough of an EMU fleet to justify having those 3 electric passenger trains an hour between Cardiff and Swansea. You also get a fourth electric train per hour, the one to Maesteg, between Cardiff and Bridgend if the Valleys are electrified.

As for freight, I don't know where it all comes from. Does anyone know how much of it would actually be on electrified lines for the whole jouney, or at least enough of it to justify swaping locos, if Swansea is electrified?

As for 377s, could enough EMUs be cascaded to run the valleys anyway? Regardless, I don't think the captial cost of a fleet of 60 377s would be even half that of the £600m Heads Of The Valleys road widening project and would be much cheaper over 30 years than leasing new EMUs.
 

merlodlliw

Established Member
Joined
8 Mar 2009
Messages
5,852
Location
Wrexham/ Denbighshire /Flintshire triangle
[QUOTE=Rhydgaled;





I seem to remember Wrexham - Bidston 3rd rail having two different prices quoted. Unafordable at Network Rail's price, but perhaps not at the lower sum Mersyrail came up with.


Correct, two prices were knocking around, some allege NR overpriced it for reasons of not wanting the job, the comparative price via Merseyrail was much much lower, but NR have a captured market as sole provider of cost & work. My opinion of course

Bob
 

ChiefPlanner

Established Member
Joined
6 Sep 2011
Messages
8,314
Location
Herts
Very hard for Wrexham - Bidston to justify electrification with any 25kv of 3d rail with a total of 4 cars per hour .....(sorry)

If one struggles with Swansea - Cardiff with around 4 million domestic (non England) journeys per annum and growing - then resources and time need to go where the real issues are.
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,856
Very hard for Wrexham - Bidston to justify electrification with any 25kv of 3d rail with a total of 4 cars per hour .....(sorry).
I guess were the line to get a third rail the service would become part of Mersyrail and run right though to Liverpool. Having a direct service, plus the sparks effect, might lead to an increase in frequency being justifiable?
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
Very hard for Wrexham - Bidston to justify electrification with any 25kv of 3d rail with a total of 4 cars per hour .....(sorry)

If one struggles with Swansea - Cardiff with around 4 million domestic (non England) journeys per annum and growing - then resources and time need to go where the real issues are.

If you only take into account 1 passenger train an hour on it you struggle!
 

jones_bangor

Member
Joined
11 Mar 2011
Messages
856
Very hard for Wrexham - Bidston to justify electrification with any 25kv of 3d rail with a total of 4 cars per hour .....(sorry)

If one struggles with Swansea - Cardiff with around 4 million domestic (non England) journeys per annum and growing - then resources and time need to go where the real issues are.

I think even the most ardent Borderlands Line advocate would have to admit the economics aren't and, given our present economic woes, will not be there in the medium term.


Quote from your link "An rumour circulating among staff is that 'premier service' is ending, and and also that the Welsh Government don't want loco-hauled trains on their sponsored fast Holyhead-Cardiffs, they want 175s instead. It's reported that there's an image problem with a train which the tabloid readers think is run solely for Assembly Members, being 'better than the rest.' Other more cynical people might say it's a way of getting at Ieuan Jones now that Plaid Cymru have lost influence. Apparently someone at ATW has suggested that the loco-hauled rakes could be used on the Llandudno - Manchester service, which is an appealing idea - alternatively, an Manchester - Cardiff train with a restaurant car would surely be welcomed by many. As usual, it's 'wait and see.'



Maybe someone on the WAG has realised that the WAG express is just a waste of taxpayers money and have decided to pull the plug. ATW may run the stock but then again DB may give it to Chiltern and the blue is intended as Chiltern Blue! If ATW run the stock it will probably only be until the money funding from WAG runs out unless DB themselves fund it but after the fall of WSMR DB may not want to fund any extras!!!!! Time will tell, if ATW are not training drivers now there is no way the service will be ready to run. Many drivers at Crewe already sign 67's and a couple at HHD do but not the DVT's or the Mk3 stock.

Felt I had to comment on these rumours....

Its clear to me that the 67s have been prepared for the North South WG Express service.

Labour can of course back track on all that was achieved in the One Wales agreement, but bear in mind that pending changes to electoral system in Wales, one-party rule in Wales may be a distant memory post 2015/6 elections......

Sure Labour can "get at Plaid" now by (spitefully?) withdrawing this service, but this might not do their prospects of future power-sharing deals with them much good. Just a thought.
 
Last edited:
Status
Not open for further replies.

Top