tbtc
Veteran Member
Did we not have a Fishguard thread?
Did we not have a Fishguard thread?
I'm not sure that the long gap is going to be crucial to the success of the trial. I would prefer not to have such a gap, but at the same time I think that the traffic flow will be more long distance traffic than local. Yes, ther ewill eb some passnegers for Carmarthen, Swansea and other points in south west wales, but I think more will use the trains to get to Cardiff, Bristol, Birmingham, even Heathrow!
Have a friend in Carmarthen,when she comes North, always gets the bus to Aberyswyth for the train, saves hours & cost she tells me.
I wish this trial all the best,money better spent than some of the previous Ministers elite aspirations using public money.
Have a friend in Carmarthen,when she comes North, always gets the bus to Aberyswyth for the train, saves hours & cost she tells me.
I wish this trial all the best,money better spent than some of the previous Ministers elite aspirations using public money.
In May Mr Isherwood asked the First Minister why his Government is subsidising, to the tune of £100,000 a month, a second express service that leaves Holyhead just 15 minutes before the general service in the morning.
I thought your 15 minute "soundbite" had been disproved previously....
I suppose the preparation of the 67s has come as somewhat of a disappointment to those who oppose this service for their various reasons.
No far from it, the 67s will be far more sensible trains, if they have to run, then run them so all can enjoy, not those two or three who have the journey bankrolled in Premier, anyhow we know WAG2 is to be 67s and non Premier with the previous Minister giving £3.5 ,millions to ATW just for WAG2 alone.
As for Gerald, who knows, but his diesel guzzling 57 engine only has a few weeks left, if it is to be a 67 it wont be Premier Class anymore in my opinion.
BTW Jones Bangor, you said both WAGs will go via Wrexham from December,I asked how did you know this, so ill ask you again, how do you know both will run?
It would also be sensible to loose this silly 6 hour gap in Cardiff.
Bob
BTW Jones Bangor, you said both WAGs will go via Wrexham from December,I asked how did you know this, so ill ask you again, how do you know both will run?
It would also be sensible to loose this silly 6 hour gap in Cardiff.
i agree with making more use of the loco hauled sets instead of them spending at least 6 hours in cardiff. I wouldnt mind a trip behind 1 to Fishguard & back or even from Cardiff to Cheltenham.
....So put in the maintenance requirements formulae and you will find downtime is at a premium and cuts down your options,
Exactly, why pay premium track access charges for a midday LHCS service with a heavy 67 loco carrying a sparse passenger load when a 158 / 175 / 150 will be more than adequate.
God forbid a 150, pleased you agree about sparse loadings
Surely the greatest demand is between Cardiff and Manchester? Should the LCHS be on that route?
I personally think maybe it would be a better idea to scrap the Cardiff- Holyhead loco hauled express services and use the stock to boost capacity on services to manchester freing up some of the 2 carriage class 175's or 158's which are used on the route.
If anyone think that four coach trains are better on the Holyhead - Cardiff services, whilst the Manchester - Cardiff corridor gets two coach units then I despair!
Arriva Trains Wales already own, rather than lease, enough mark 2s to make up a few four coach rakes. It bemuses me why ATW are hanging on to them if they have no intentions of making use of them (barring those included in the WAG rake). They don't even get wheeled out for big sporting events like the rugby in Cardiff to my knowledge. Owning them outright would surely mean a reduced cost of running loco hauled services when compared to leasing the carriages from a ROSCO.Who knows - there's quite a few 67s about, some DVT and plenty of Chiltern slaqm-door Mk3's that could be cascaded once the plug-door stock come on line.....
I think that the soonest you could expect to see developments on that front would be when the Scottish Central Belt electrification programme is completed, when we will have to see if Scotrail feel charitable enough to throw a bone or two from its' plate in the direction of Wales and England. That should still be within the current "no growth" ATW franchise though, so we will have to hope that in a couple of years time the DfT will have seen sense and realised that a "no growth" franchise is unsustainable in a time of rapid passenger growth.Sometimes i think even a 3 carriage 175 isnt enough on the south wales - Manchester route. Pity ATW couldnt get a lot more 158's for the cambrian as well as running in pairs on the south wales - Manchester service allowing the 3 carriage 175's work other ATW services.
Bear in mind that Cardiff - Holyhead's do serve part of that route, nevertheless, a two car 175 isn't adequate for Cardiff - Manchester services
I fully agree there is demand for a loco hauled service Cardiff to Manchester,a few years ago pre 158s they were all loco hauled with Western Region stock. The current Minister is broader minded, but has been left with a legacy of £3.5millions spent already for Wag2 to run as a 67,this money can not be diverted into a Manchester service, as ATW have banked it already for Holyhead Cardiff open access services only, plus I am not aware of any ATW staff based in Manchester.
Lets see what November brings, I don't think its going to be a Premier Month, more a buffet month.
Sometimes i think even a 3 carriage 175 isnt enough on the south wales - Manchester route. Pity ATW couldnt get a lot more 158's for the cambrian as well as running in pairs on the south wales - Manchester service allowing the 3 carriage 175's work other ATW services.
If the 67s are used on the WAG Express via Wrexham then they'll only serve one station north of Abergavenny that the busy Manchester trains serve (Shrewsbury), so its not going to be of much help to those stuck on two coach 175s.
If Manchester - Cardiff is a seven hour round trip then a loco hauled set could do two return journeys a day, which would be a help.
Who knows what November will bring - if first class is retained, then some form of rationalisation - which I think is what you're suggesting - is probably on the cards. Reduced services - more pringles and pre-packed sandwiches, instead of welsh mountain lamb and claret - will reduce prices and increase utilization.
The big advantage of 67s / DVT push-pull stock is that they effectively become units, so need for run-rounds etc, which should make them more flexible. The downside is that putting them on Manchester services will cost ATW more money in track access charges.....but I'd welcome any 3hr+ ATW services moving to Mark 2 or 3 coaching stock.
There's no getting around the fact that if a TOC wishes to extend train services to meet a growing demand, then they will have to bite the bullet and stump up for extra track access charges. Granted that the charges associated with a loco + 4 coaches will be much higher than for adding an additional 158 onto a currently two car service, but the loco hauled option is the only achievable option at the moment and is likely to be the case for the next couple of years at least.The big advantage of 67s / DVT push-pull stock is that they effectively become units, so need for run-rounds etc, which should make them more flexible. The downside is that putting them on Manchester services will cost ATW more money in track access charges.....but I'd welcome any 3hr+ ATW services moving to Mark 2 or 3 coaching stock.
This is not intended as a criticism of your well thought out post, but of the propensity of some TOCs to dodge any additional costs that would come with expanding what is a growing business. Not that the blame can be levelled solely at the train operating companies of course, when the franchises are micro-managed by the DfT who say exactly what the operator can and cannot do.
I agree that ATW would have to be pushed to do this - I suspect the DfT wouldn't interfere if this were a Welsh Government decision. But it would all come down to a question of cash.
The big win in pulling 158 / 175 units off the longer routes is the cascade downwards of stock, so that the Cambrian in particular could benefit.
Realistically I think you're probably looking at assembling 5 or 6 push pull sets which would make a huge difference in relieving pressure.
It's also worth pointing out that Manchester - Llandudno, Birmingham - Shrewsbury services are also "jam-packed" at peak times, with many people standing, and I can't help thinking there's a first class market on this route also.