ValleyLines142
Established Member
It's not working it yet. The 67+DVT setup isn't due yet. Still 57s only at the mo.
Ah okay, I'll look out for it when it comes into service, the 57s are so noisy!!
It's not working it yet. The 67+DVT setup isn't due yet. Still 57s only at the mo.
Having looked at the photos again, I believe the DVT is standing at the rear/west of platform 2 and that the angle of the photo / photographer means that the water tower is to the right of the photo/photographer. Compare the position of the lights.
Correct, you can also tell as there are four tracks between where the photo was taken(#3) and the next platform across (#2)
No the DVT is standing on platform 2. The water tower is on the other side of platform 0 behind the car park.
Hang on, is this photoshopped? Or genuine?
Thanks I thought it was platform two, who do you think the DVT is hired in from,as I think we now agree it exists.
I presume they're DB\Arriva ones, didn't they buy up quite a few while they've been on the mark 3 buying spree?
Very creative accounting if they can hire it from themselves like the 175 DB/ATW hired in from its own franchise for WAG2
Bob
Thanks I thought it was platform two, who do you think the DVT is hired in from,as I think we now agree it exists.
Wrexham General is busy on Sundays, now all the Manchester Cardiff's are diverted through it & SD & PU, as an aside.
Bob
Just as well the 57s are being replaced by the 67s!
I wonder where a the nearest tug will be found, when the WAG goes 67,however the 67s are far more reliable, I recall Andy Hamilton MD of W/S telling us, " I would not touch a 57 with a barge pole, far too unreliable" but then Andy knew his stuff, unlike some at the land of leather.
Anyone know if the pax were ferried off the WAG57, when it failed at Nantwich as Crewe is only a few minutes away, however better stuck on a loco hauled for almost three hours than a DMU, no doubt for once the kitchen returned empty.
Bob
I would sooner be on a unit bob because if the loco failed and the engine shut down the ETH would not be avaialble for heat at least with a unit you have another engine at least if it's a 2 car to keep the set warm and with air. Another thing as well is if the engine shuts down with CDL once the air goes there is a door release automatically, this is a safety system so therefore doors will be released on both sides so therefore the guard or drive must lock the doors from the outside and this in turn is a problem for safety.

The 57s days do seem numbered -after all, they are essentially "duff" based.
I was on 1121 ex CDF to Holyhead last Thursday, only passenger in lead coach (3 car 175) between Cardiff and Newport. Market for all these north to south trains seems thinner and thinner.
Southbound WAG2 had around 20 on it leaving Shrewsbury yesterday.
I was on 1121 ex CDF to Holyhead last Thursday, only passenger in lead coach (3 car 175) between Cardiff and Newport. Market for all these north to south trains seems thinner and thinner.
I think I was told on here once that the engines in the 57s, while not from the 47, were still old engines not new ones. I personally think the idea of recycling the bodyshell (which should last practically forever if looked after) was a good one, but that it really should have been brand new (or almost new), super-reliable, equipement that went in rather than re-cycled engines. That said, since the early days when they the WAG express was top&tail, I haven't heard many reports of 57 failures on the WAG express and therefore I'm not entirely sure whether I should consider them to be unreliable locos.57's are like 47's duff locos and inpractical on todays railways
Because few people do the full journey and Wrexham and Holyhead could use direct services to Crewe or Manchester I wouldn't mind seeing the 2-hourly stoppers re-routed to reduce the Holyhead - Cardiff direct service to 2 or 3 expresses each way. However, all who complain at the lack of Holyhead and Wrexham to Manchester services should note that the fleet might not stretch to running the services from Cardiff and Holyhead to Crewe or Manchester and back from the current reversal point at Chester.To be fair ive been on CDF-Holyhead trains that have left Cardiff with people standing. While few people do the full journey, many travel small sections and it means the train can be busy all the way through.
But I'm sure you could travel on many other routes at that time of day and find them very quiet!
I think I was told on here once that the engines in the 57s, while not from the 47, were still old engines not new ones. I personally think the idea of recycling the bodyshell (which should last practically forever if looked after) was a good one, but that it really should have been brand new (or almost new), super-reliable, equipement that went in rather than re-cycled engines. That said, since the early days when they the WAG express was top&tail, I haven't heard many reports of 57 failures on the WAG express and therefore I'm not entirely sure whether I should consider them to be unreliable locos.
I'd prefer the WAG Express to be hauled by a 57 done properly (47 bodyshell with reliable inards, the best possible fuel ecconomy and push-pull systems) than a less-good-looking, 125mph class 67 doing (supposedly) higher damage to the track (higher axle weight?). However, 67s will have to do for now as they are the only things that don't require OHLE and can work with a DVT at the moment and hence they are the only way to get that 175 back to keep a 150 off long-distance services.
Because few people do the full journey and Wrexham and Holyhead could use direct services to Crewe or Manchester I wouldn't mind seeing the 2-hourly stoppers re-routed to reduce the Holyhead - Cardiff direct service to 2 or 3 expresses each way. However, all who complain at the lack of Holyhead and Wrexham to Manchester services should note that the fleet might not stretch to running the services from Cardiff and Holyhead to Crewe or Manchester and back from the current reversal point at Chester.
Southbound WAG2 had around 20 on it leaving Shrewsbury yesterday.
I was on 1121 ex CDF to Holyhead last Thursday, only passenger in lead coach (3 car 175) between Cardiff and Newport. Market for all these north to south trains seems thinner and thinner.
I was on it as i had got all the way to Cdf and had meeting cancelled on me without anyone having courtesy to say anything.
That is true Jones but those trains are franchised and not costing the Welsh taxpayer extra money
Extra money, yes, but they still cost the taxpayer money.
My view on WAG 2 is that leaves and hour too late from either end.
At least some of the alternators used in the 57/3s were recovered from class 56 locos. I don't think the power units are reconditioned though, or at least not from anything British at any rate.I think I was told on here once that the engines in the 57s, while not from the 47, were still old engines not new ones. I personally think the idea of recycling the bodyshell (which should last practically forever if looked after) was a good one, but that it really should have been brand new (or almost new), super-reliable, equipement that went in rather than re-cycled engines. That said, since the early days when they the WAG express was top&tail, I haven't heard many reports of 57 failures on the WAG express and therefore I'm not entirely sure whether I should consider them to be unreliable locos.
I'd prefer the WAG Express to be hauled by a 57 done properly (47 bodyshell with reliable inards, the best possible fuel ecconomy and push-pull systems) than a less-good-looking, 125mph class 67 doing (supposedly) higher damage to the track (higher axle weight?). However, 67s will have to do for now as they are the only things that don't require OHLE and can work with a DVT at the moment and hence they are the only way to get that 175 back to keep a 150 off long-distance services.
Indeed but the train is governd by what the WAG want and not what is best for passengers in general. Come on Jones, it is a complete waste of taxpayers money and to be honest the WAG should have sai to ATW, " if you need to increase capacity on any of your routes here is 6m quid to help you" The ATW could have done this themselves insted of being told by the WAG what they want them to do! This service is only good for neds, Welsh AM's and people who want 1st class travel! I thought the current WAG government was totally agains a class run country!
Although I agree with the WAG and WAG2 being a waste of money, the nprevailing view these days seems to be that those who provide the money bave a right to state where and how it should be used.
What the WG should say is here is money to improve capacity between Manchester and South West Wales, and here is some more to improve capacity between Manchester and North Wales. But they won't do that for political reasons.
Indeed but the train is governd by what the WAG want and not what is best for passengers in general. Come on Jones, it is a complete waste of taxpayers money and to be honest the WAG should have sai to ATW, " if you need to increase capacity on any of your routes here is 6m quid to help you" The ATW could have done this themselves insted of being told by the WAG what they want them to do! This service is only good for neds, Welsh AM's and people who want 1st class travel! I thought the current WAG government was totally agains a class run country!