asylumxl
Established Member
I saw a few Voyagers heading towards West Ealing. Just wondering if anyone knew what they were doing there?
That would work if they were part of the same company, but I doubt it will happen
Network Rail should be able to instruct an operator to deliver additional services as and when necessary (in particular during engineering works) in order that the general public has the benefit of integration in the railway system. This should also operate during "normal" service disruption (eg additional calling points)
Wasn't there a similar thing when Project Rio was started? Two very different companies but it was a huge sucess.
The idea of extending PAD > OXF HSTs is an interesting idea, but there'd be the need for drivers from OXF > BHM and the need for additional sets.
It's great that this operation takes place. I'd much rather get on another train instead of a bus - even if it means a slilghtly longer than standard timetabled service.
Could this not be improved a little more though? Albeit the improvement resulting in arriving at an alternative London terminus...
QUOTE]
was attempting to do one of these services on my way to warley last year but was told at Euston my ticket wasnt valid...so sod Virgin, i went via Chiltern to Snow Hill and VT to B' International instead...and same on the return...
but From Virgin i do think its a pretty good idea though...but why dont they increase these services by adding extra capcity in the form of there 57's & Pendilinos?
LHCS over the Chiltern line is horribly slow. At least Voyagers can keep to MU timings.
The idea of extending PAD > OXF HSTs is an interesting idea, but there'd be the need for drivers from OXF > BHM and the need for additional sets.
I thought 57s with a Pendo could be run at 95mph ?, hardly slow.