• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Very Light Rail Technology

Status
Not open for further replies.

Jorge Da Silva

Established Member
Joined
4 Apr 2018
Messages
2,641
Location
Cleethorpes, North East Lincolnshire
Very Light Rail technology could provide a cheap solutions to unprofitable branch lines. Where could this be used?

Video about it:

In summary the video states that VLR will provide a light, cheap and economical solution to small unprofitable branch lines. It intends to cut pollution, provide a light and easy solution for passengers as well as them being fully autonomous and battery operated.

This is due to be experimented and tested in Dudley at a new centre and test track. (not in the video).
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

DenmarkRail

Member
Joined
13 Jun 2016
Messages
666
Very Light Rail technology could provide a cheap solutions to unprofitable branch lines. Where could this be used?

Video about it:

We don't need this... We need a better 15X replacement, such as Lints, and more Desiros (Europe Style). These are to small. If we invest in the lines, then we get more people.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,655
Stourbridge to Brierley Hill is proposed to be heavy rail, though I am willing to bet that scheme gets quietly dropped soon as I don't think Stourbridge station will work with the reversals.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,091
Location
"Marston Vale mafia"
It worked with Stourbridge Line!

I was going to say "isn't a PPM basically that, albeit with a slightly odd design of transmission"?

I think there is a role in light-rail-ising branch lines that don't have through running, in the 2020s that maybe need not involve OHLE if batteries are a viable option. It has quite a few advantages, such as "drive on sight" allowing level crossings to work more safely, and low floor platforms making new stations much cheaper and easier to construct. I think the Valley Lines projects (see the other threads on those) are potentially a very interesting thing to watch, being a conversion that is quite different from Metrolink.
 

Old Hill Bank

Member
Joined
6 Mar 2010
Messages
971
Location
Kidderminster
Stourbridge to Brierley Hill is proposed to be heavy rail, though I am willing to bet that scheme gets quietly dropped soon as I don't think Stourbridge station will work with the reversals.
I see that issue as well they really need seperate Worcester/Kidderminster-Brierley Hill service.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,091
Location
"Marston Vale mafia"
Might work on the Conwy valley line but theyre getting civitys

Summer loadings are a bit high for that to work I think, regular light rail might work but as you say KeolisAmey have decided it's better to keep it as heavy rail and use the same trains as on the mainline for simplicity (which is really quite an upgrade given that it's always got the cast-offs[1] from elsewhere in the past).

[1] OK, enthusiasts, me included, loved the Class 101s, but to daily passengers they really were rattly old garbage that was got rid of from most of the rest of Regional Railways years earlier; the 150s and 153s are getting increasingly tatty and now are becoming the same thing.
 

Along the bay

Member
Joined
2 Sep 2018
Messages
100
Summer loadings are a bit high for that to work I think, regular light rail might work but as you say KeolisAmey have decided it's better to keep it as heavy rail and use the same trains as on the mainline for simplicity (which is really quite an upgrade given that it's always got the cast-offs[1] from elsewhere in the past).

[1] OK, enthusiasts, me included, loved the Class 101s, but to daily passengers they really were rattly old garbage that was got rid of from most of the rest of Regional Railways years earlier; the 150s and 153s are getting increasingly tatty and now are becoming the same thing.
Yes your right about that
Although I'm sure 153s no longer work the route or at least i haven't seen one on there since at least 2010
 

PeterC

Established Member
Joined
29 Sep 2014
Messages
4,769
I would be interested to see the costings comparing adding an additional heavy rail train to a homogeneous fleet to having a dedicated mini fleet.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,091
Location
"Marston Vale mafia"
I would be interested to see the costings comparing adding an additional heavy rail train to a homogeneous fleet to having a dedicated mini fleet.

Let's put it this way - if the Marston Vale had wires and 80m platforms I doubt they would be planning a microfleet for that.
 

bussnapperwm

Established Member
Joined
18 May 2014
Messages
1,528
Very Light Rail technology could provide a cheap solutions to unprofitable branch lines. Where could this be used?

Video about it:

In summary the video states that VLR will provide a light, cheap and economical solution to small unprofitable branch lines. It intends to cut pollution, provide a light and easy solution for passengers as well as them being fully autonomous and battery operated.

This is due to be experimented and tested in Dudley at a new centre and test track. (not in the video).

Ironically the test track was proposed to be in the Dudley tunnels, on the Walsall to Stourbridge lines.

I’m think more like small lines such as Oxford-Cowley. I know it’s yet to be built but other examples like Stourbridge to Brierley Hill Planned by WMT.

Stourbridge to Brierley Hill is planned to be 172 operated.

Stourbridge to Brierley Hill is proposed to be heavy rail, though I am willing to bet that scheme gets quietly dropped soon as I don't think Stourbridge station will work with the reversals.

Easy. Make the line into P2 from Brierley Hill bidi, have city bound trains from Brierley Hill use that and have P3 for Birmingham to Brierley Hill trains.

The scheme has been too widely publicised for it to be dropped, and I know that I for one will be very unhappy if it is dropped as it will provide better connectivity for the borough of Dudley.
 

jacksouth

New Member
Joined
30 Aug 2018
Messages
4
Hmm. I also have some concerns about this, but it's an interesting proposal nonetheless.
 

Jorge Da Silva

Established Member
Joined
4 Apr 2018
Messages
2,641
Location
Cleethorpes, North East Lincolnshire
What lines could reopen with VLR?

Some Suggestion
  • Witney-Oxford
  • Cirencester (Chesterton Lane)-Kemble
  • Marlborough-Bedwyn
  • Radstock-Frome
  • Shepton Mallet-Frome
  • Ludgershall-Andover
  • Appledore-Lydd
  • Toton-Fawley
  • Axminster-Lyme Regis
  • Feniton-Sidmouth
  • Heathfield-Newton Abbot

PDF:

https://www.cenex-lcv.co.uk/storage...f_delivering_low_cost_railways_1537363565.pdf

Here are some things mentioned:

Very Light Rail
• A potential enabler of lower‐cost connectivity of urban, suburban and rural areas, including replacement of traditional tram solutions, the revitalisation of unprofitable branch lines and reopening of previously closed ‘Beeching’ lines
• A possible element in ‘last mile’ public transport journeys

What is VLR?
• Very light weight vehicles (less than 1 tonne per linear metre) which can operate on less substantial track and infrastructure (lower costs of construction, operation and maintenance)
• Transfer of technology from the automotive sector (proven solutions, high quality, low cost, reduced risk)
• Self‐propelled to eliminate expensive overhead electrification
• Vehicles designed for low cost manufacture allowing lower prices and bigger fleets
• Light weight slab track enabling fast installation and reduced maintenance costs
• Digital control to eliminate track side signals; autonomy to eliminate the cost of drivers BUT....VLR vehicles do not have ‘mainline crashworthiness’
Revolution VLR Project
• Consortium awarded £1.1m by RSSB from the Radical Train Competition in 2014 to create a very light‐weight railcar with novel hybrid‐drive self‐propelled bogies
• Phase 1 completed in September 2016 ‐ detailed vehicle concept design and propulsion solution submitted to RSSB
• Phase 2 commenced January 2018, with £2.75m funding from DfT/RSSB. The £5.5m project will deliver a fully functional vehicle demonstrator by April 2020
• Eversholt Rail has made a significant investment in Phase 2 and is working to identify the first routes for operation




Initial Routes and Future Mainline Operation
Segregated Routes
• RSSB has identified more than 30 routes in the UK where VLR technology could be used to transform uneconomic rural lines or enable lines closed in the Beeching era to be reopened and operated at much reduced cost.
• Train operating companies such as Northern, Arriva and Abellio have identified additional mothballed alignments that they would like to see re‐opened.
• Rolling stock company, Eversholt Rail, intends to be the first mover in the introduction of VLR
Mainline Operation
• For more widespread applications, a collaborative forum is to be set up with representatives from ORR, RSSB, Network Rail, ROSCOs and TOCs to work towards appropriate safety standards and operating protocols.
 
Status
Not open for further replies.

Top