Chapeltom
Established Member
Hi all
I was on the 1538 from Chapel en le Frith to Manchester Piccadilly yesterday, which was bound for Barrow in Furness. I noticed it was effectively only running on one engine, although RTT says there was a fault with traction equipment...
http://www.realtimetrains.co.uk/train/Y41073/2013/12/16/advanced
It kept losing bits of time but only got into Picc 3 mins late, probably due to all the padding in the service :roll: Now I suspected it was not going to carry on all the way to Barrow, the driver kept trying to get the engine of the front carriage going at every station but it wasn't happening, although it was very quiet
On alighting at Picc I assumed it would continue onto Barrow seeing as the LDBs showed it at Picc as running, no announcements otherwise but a few late and people boarded, I later found out tonight on returning home that it actually terminated at Oxford Road where I presume there was going to be crew change.
Would the termination at Oxford Road have been planned or would it have been a snap decision? It hadn't been running right at all, no surprises it never made it to Barrow but it seems like it got to Oxford Road and there would have been an announcement, oh by the way this service will terminate here and is cancelled. It seems quite a late cancellation when it was obvious the unit was struggling badly.
Tom
I was on the 1538 from Chapel en le Frith to Manchester Piccadilly yesterday, which was bound for Barrow in Furness. I noticed it was effectively only running on one engine, although RTT says there was a fault with traction equipment...
http://www.realtimetrains.co.uk/train/Y41073/2013/12/16/advanced
It kept losing bits of time but only got into Picc 3 mins late, probably due to all the padding in the service :roll: Now I suspected it was not going to carry on all the way to Barrow, the driver kept trying to get the engine of the front carriage going at every station but it wasn't happening, although it was very quiet
Would the termination at Oxford Road have been planned or would it have been a snap decision? It hadn't been running right at all, no surprises it never made it to Barrow but it seems like it got to Oxford Road and there would have been an announcement, oh by the way this service will terminate here and is cancelled. It seems quite a late cancellation when it was obvious the unit was struggling badly.
Tom