Did anyone see the article on page 6, of the May issue of Modern Railways. This is concerning upgrading the capacity in the Cardiff area. It talks about new/reinstated platforms at Cardiff Central and at Queen Street. All excelent to read about, but it say that there will be further improvements to the Valley lines. I quote from the article as follows:-
" The Treforest curve, south of Canton Depot, will be doubled to provide capacity for more Taff trains (Cardiff to Aberdare, Treherbert and Merthyr Tydfil) to operate via the City Line, thereby easing the pressure on the double track between Cardiff Central and Queen Street."
This is great news, should have been done years ago though, when they reopened the City Line in the 80's. It goes on as follows:-
"Additional tracks for turnback, alongside reinstated platform faces, will be provided at Barry, Caerphilliy and Pontypridd. A crossing loop and second platform at Tir-Phil will enable half hourly frequency to and from Rhymney."
Again excellent news, BUT yet again half hearted inprovements are being planned. At one time, not only was the Cardiff to Pontypridd line 4 tracks (now reduced to 2), all the other Valley lines were at least 2 track, if not more. But bad planning and little understanding caused most of the lines radiating from Cardiff to be singled. Yes there has been some redoubling, mainly as long loops to increase both capacity and services frequency, but very little.
If they are planning to electrify the Valley Lines, the politicans who will make this very important and NESSECARY decesion, need to bite the bullet and really do a propper job for once. This will mean redoubling all the Valley lines, extend all platforms to take 6/8 car trains. As well as electrifing them all, including a redoubled and extended Ebbw Vale line along with the route to Measteg.
I really hope that they do have the true courage to do this, but I wont be holding my breath.
" The Treforest curve, south of Canton Depot, will be doubled to provide capacity for more Taff trains (Cardiff to Aberdare, Treherbert and Merthyr Tydfil) to operate via the City Line, thereby easing the pressure on the double track between Cardiff Central and Queen Street."
This is great news, should have been done years ago though, when they reopened the City Line in the 80's. It goes on as follows:-
"Additional tracks for turnback, alongside reinstated platform faces, will be provided at Barry, Caerphilliy and Pontypridd. A crossing loop and second platform at Tir-Phil will enable half hourly frequency to and from Rhymney."
Again excellent news, BUT yet again half hearted inprovements are being planned. At one time, not only was the Cardiff to Pontypridd line 4 tracks (now reduced to 2), all the other Valley lines were at least 2 track, if not more. But bad planning and little understanding caused most of the lines radiating from Cardiff to be singled. Yes there has been some redoubling, mainly as long loops to increase both capacity and services frequency, but very little.
If they are planning to electrify the Valley Lines, the politicans who will make this very important and NESSECARY decesion, need to bite the bullet and really do a propper job for once. This will mean redoubling all the Valley lines, extend all platforms to take 6/8 car trains. As well as electrifing them all, including a redoubled and extended Ebbw Vale line along with the route to Measteg.
I really hope that they do have the true courage to do this, but I wont be holding my breath.