Uses for HS2 phase 1a spurs to cancelled phase 2 routes.

Status
Not open for further replies.

ShadowKnight

Member
Joined
22 Oct 2019
Messages
240
Location
Liverpool
I was thinking about what use in the immediate term (once phase 1 is completed) the two HS2 spurs that would have connected to the original HS2 Y network.

Currently there is a spur ending east of handsacre connecting to phase 2a to Crewe and Manchester.

Also the spur ending next to the m42 near Tamworth which would have connected to phase 2b to the east midlands and Leeds.

Will they get built out to full spec and be glorified sidings? (Does the signalling allow for that?)

Or what other use could there be?
(Connection to the classic network)
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,729
I was thinking about what use in the immediate term (once phase 1 is completed) the two HS2 spurs that would have connected to the original HS2 Y network.

Currently there is a spur ending east of handsacre connecting to phase 2a to Crewe and Manchester.

Also the spur ending next to the m42 near Tamworth which would have connected to phase 2b to the east midlands and Leeds.

Will they get built out to full spec and be glorified sidings? (Does the signalling allow for that?)

Or what other use could there be?
(Connection to the classic network)
They will just be stubs and likely have no pointwork or track either.
 