MatthewRead
On Moderation
I liked the idea of sending them to Scotrail they could take over the Fife circle services entirely and release DMU's Scotrail did issue a tender for new rolling stock for the Fife Circle well there you go.
Converting Mark 4s to vacuum brakes probably isn't a low cost alternative for that part of the market. The margins on charter operations are unlikely to be large.
The Mark 4 Coaches could be used on the London King's Cross to Sunderland and Bradford Interchange the diesel loco hauled services
Back to what I suggested upthread: class 90/91 on one end, class 67 on the other!Hauled by what? Given the long stretches of ECML it would require a diesel loco able and permitted to do 125mph and capable of supplying standard ETS- and such a thing doesn't exist!
Hauled by what? Given the long stretches of ECML it would require a diesel loco able and permitted to do 125mph and capable of supplying standard ETS- and such a thing doesn't exist!
Back to what I suggested upthread: class 90/91 on one end, class 67 on the other!
Job done, bimode train for much less than a class 800
Maybe I should go into consultancy...
The only possible option which I can see would be 67s running top and tail; 7000bhp should be plenty for reasonable acceleration up to 125mph while supplying hotel power. I can’t see, however, that such a set-up would have many advantages over 180s.
But they can't do 125mph - although theoretically capable, they were banned from going over 110 after initial testing showed how heavy an impact they had on the track at higher speeds.
If class 67s and 91s can't work together, how did East Coast diverts via (for example) the Tyne Valley work (genuine question)? My idea doesn't really need both locomotives to power at the same time anyway, use electric as far as Northallerton (assuming the Sunderland services call there), then diesel beyond, where the somewhat stately class 67s wouldn't cause much of a performance issue.
Ok, thanksStick it on the front and drag, then take it off again at the end. The 91 was just dead in the train, and the 67 always had to be on the front as there was no way to control the 67 from the 91, or vice versa. The 67 would suply the ETS power, but other than that would have no electrical connections to the train.
Stick it on the front and drag, then take it off again at the end. The 91 was just dead in the train, and the 67 always had to be on the front as there was no way to control the 67 from the 91, or vice versa (or control the 67 from the DVT). The 67 would suply the ETS power, but other than that would have no electrical connections to the train.
The DVTs which have gone to Wales have been modified so that they can use the AAR multiple-working system, which is what the 67s use.
Also not clear whether Mk4s would be gauged all the way to Bradford. (Sunderland route has had diversions so in theory would be OK)
If they were to go somewhere, it’d be TfW. I would like to see them go to Chiltern though, as they’re newer than the Mk3s, and if their loco-hauled stock is newer they can keep running the service a bit longer.
To which the 180s are far more suited.The Mark 4 Coaches could be used on the London King's Cross to Sunderland and Bradford Interchange the diesel loco hauled services
To which the 180s are far more suited.
Good to see a proper crayon session going on in here, though!
![]()
"Obvious" thing to do would be new / cascaded 80x variants once the 180s have run their course.
But wasn’t the complete silence regarding that tender a sign that such stock is no longer needed or wanted? I’m pretty sure it’s no longer on anyone’s agenda.I liked the idea of sending them to Scotrail they could take over the Fife circle services entirely and release DMU's Scotrail did issue a tender for new rolling stock for the Fife Circle well there you go.
The mk4s looked likely for Fife but they decided to keep some 170s instead which is a better choice for them IMO. I remember hearing that lots of the sprinter routes couldn't take 170s anyway.I liked the idea of sending them to Scotrail they could take over the Fife circle services entirely and release DMU's Scotrail did issue a tender for new rolling stock for the Fife Circle well there you go.
would potentially need to regear a class 92 for 90/100 mph and/or upgrade the power on the brighton mainline but for a old style gatwick express (e.g. with a dedicated luggage car) mark 4's + 92 or 73 could work quite nicely
TfW will have 3 x 4 car rakes. GC would be 5 x 6 car rakes. That's 38 vehicles in total, across 8 rakes. Can you make 6 x 5 car and 2 x 4 car rakes, all powered by 67s, and therefore use them on a combination of North Wales - South Wales (2 x 4 car, with full restaurant); and then the rest working on the Llandudno / Holyhead - Manchester Airport circuit?
I reckon there's 6 diagrams solely on Llandudno - Manchester Airport, so add in some Holyhead bits, and then you've potentially only got one or two unit diagrams overall on the entire North Wales - Manchester route which can be made to work only at off-peak times, meaning you'll have wonderful 5-car rakes turning up on the Castlefield corridor at peak, spreading passengers beautifully. De-clutter the doorways and you're laughing (e.g. take out a couple of seats and give that circulating space).
TfW have already decided how many sets they want. Sorry to repeat this yet again, but Mk4s have been going for scrap - if they wanted more sets they could have had them already.
However in this case, the refurbishment and bodywork is done, causing the ROSCO to need to recoup money. I have no doubt they will give a good price.
Other threads report TfW have not ordered enough Civity traction, this is an ideal solution. Especially if based on the North Wales Coast, as maintenance will all be based out of Crewe.
However in this case, the refurbishment and bodywork is done, causing the ROSCO to need to recoup money. I have no doubt they will give a good price.
Other threads report TfW have not ordered enough Civity traction, this is an ideal solution. Especially if based on the North Wales Coast, as maintenance will all be based out of Crewe.
Would it be enough to allow all North Wales Coast "IC" services to be Mk4s? That would have considerable advantages.
Again, there is a cost consideration for the ROSCO. They may try to tout the coaches but in the likely event of there being no takers, the coaches have no value to them other than scrap and they will have to cut their losses and get the money back from leasing their other stock. There is likely to be some sort of exit payment from Grand Central in any case.However in this case, the refurbishment and bodywork is done, causing the ROSCO to need to recoup money. I have no doubt they will give a good price.