Hello

I do wonder why some lines have OHLE/OLE when they are deemed useless.

Take this approch to newcastle. The lower line is clearly a diesel line (no electrification whatsoever and they just before the station electrify a small portion of the other 2 tracks. However any electric loco/EMU won't get anywhere.

http://www.youtube.com/watch?v=ZEplJsmVbqo

Take a look at 0.47-1.20

Heres another example

Barking to Gospel Oak

http://www.youtube.com/watch?v=LEQyqh_gVPk

Take a look at 3.35 -4.30

OK so we know its a DMU service but why did NR built any OHLE on that spur when the reality is that this is just useless to any true electric train.

I do believe a similar statement is true for South Tottenham stn on the Gospel Oak to Barking line

I can understand AC/DC crossover points but these sections really are of no valid use to any EMU or electric loco and even though OLE is there the stretch of track is in reality only diesel freindly

I'm really puzzled as to why this sort of thing happens
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

MK Tom

Established Member
Joined
31 Aug 2011
Messages
2,457
Location
Milton Keynes
I used to wonder about the little stubs at places like Nuneaton and Rugeley. I assumed they were in case trains overran or to provide extra operational flexibility. They also reduce the amount of work needed to later electrify that line.
 

starrymarkb

Established Member
Joined
4 Aug 2009
Messages
5,985
Location
Exeter
I've not looked at the videos but South Tottenham is an EMU diversion route from the West Anglia line. Similarly the section from Barking to near Wanstead Park allows EMUs and Electric Freight from Tilbury/Rainham to access the GEML and then the NLL.

Is the Newcastle one the single line over the high level bridge? if so that allows Mk4 sets to head south if there is a problem on the other bridge, or if a set needs to be turned in service.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
See also Stockport to Hazel Grove (one EMU a week?).

I'm sure it'll get more use when the services around Manchester are re-jigged (and the line to Preston etc electrified), but at the moment it's not much use.
 

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
78,244
Location
Yorkshire
I can understand AC/DC crossover points but these sections really are of no valid use to any EMU or electric loco and even though OLE is there the stretch of track is in reality only diesel freindly
I appreciate this is very rare, but what would happen if a driver accepted a wrong route, and realised shortly after taking it, stopping the train just beyond the junction, and there was no OLE for any distance beyond the junction?

Also when it comes to expanding electrification, perhaps the way it has been done is to avoid disrupting the existing lines, if at all possible?

I do believe a similar statement is true for South Tottenham stn on the Gospel Oak to Barking line
16:30 - electric line joins from the South
16:50 - South Tottenham station
17:24 - electric line diverges to the North
--- old post above --- --- new post below ---
See also Stockport to Hazel Grove (one EMU a week?).

I'm sure it'll get more use when the services around Manchester are re-jigged (and the line to Preston etc electrified), but at the moment it's not much use.
My understanding is that there was a regular EMU service several years ago. The switch to mostly diesel traction may have coincided with the completion of the spur to Manchester Airport.
 

transmanche

Established Member
Joined
27 Feb 2011
Messages
6,021
Take this approch to newcastle. The lower line is clearly a diesel line (no electrification whatsoever and they just before the station electrify a small portion of the other 2 tracks. However any electric loco/EMU won't get anywhere.

http://www.youtube.com/watch?v=ZEplJsmVbqo

Take a look at 0.47-1.20
Well, firstly it can act as a short piece of overrun - should an electric train be routed onto the wrong line. In the specific example in the video, you'll notice a connection from the 'electric lines' (the ECML) to the 'diesel lines' (the Newcastle-Carlisle line) which enables electric trains from the south to access the High Level Bridge and vice versa (useful if a train needs to be reversed in service).

Specific example, a 91+mkIV set heading from Edinburgh-London arrives in Newcastle and there's a fault in the leading DVT. It can set off to London via the High Level Bridge with the 91 leading and using the King Edward South junction and that crossover it can access the ECML heading south. It saves having to cancel the train, so it's very useful.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
when it comes to expanding electrification, perhaps the way it has been done is to avoid disrupting the existing lines, if at all possible?

I think of these electrified spurs like the stunted motorway sliproads that were built

As an example, the M1 north of Sheffield has a restricted junction (35A), but you can see (at the top of the image) where the sliproads were started in case funding were found to complete the missing parts:

https://maps.google.co.uk/maps?q=Th...+Hesley,+South+Yorkshire,+United+Kingdom&z=17
 

tom1649

Member
Joined
5 Jul 2010
Messages
989
The switch to mostly diesel traction may have coincided with the completion of the spur to Manchester Airport.

The switch occurred in December 2008 when Hazel Grove services were extended to Preston. The surplus 323s as a result of this were used to extend the Manchester Piccadilly - Macclesfield service to Stoke.
 

Crossover

Established Member
Joined
4 Jun 2009
Messages
9,493
Location
Yorkshire
Colton Junction just south of York has a short stretch of electrification on the line towards Leeds - it won't ever get used but I guess electrifying the rest of that line (which is due to happen) will be easier as the junction is already sorted. Also useful for a potential overrun where wrong routed etc too

I believe there is electrification just south of Carlisle on towards the S&C. Though not used regularly, I understand (from reading here) that it is sometimes used to shunt Pendos out of the way during disruption in order to free up platform space at the station.
 

mirodo

Member
Joined
7 Nov 2011
Messages
649
I appreciate this is very rare, but what would happen if a driver accepted a wrong route, and realised shortly after taking it, stopping the train just beyond the junction, and there was no OLE for any distance beyond the junction?

Get out and push?

:D
 

Crossover

Established Member
Joined
4 Jun 2009
Messages
9,493
Location
Yorkshire
Well, firstly it can act as a short piece of overrun - should an electric train be routed onto the wrong line. In the specific example in the video, you'll notice a connection from the 'electric lines' (the ECML) to the 'diesel lines' (the Newcastle-Carlisle line) which enables electric trains from the south to access the High Level Bridge and vice versa (useful if a train needs to be reversed in service).

Specific example, a 91+mkIV set heading from Edinburgh-London arrives in Newcastle and there's a fault in the leading DVT. It can set off to London via the High Level Bridge with the 91 leading and using the King Edward South junction and that crossover it can access the ECML heading south. It saves having to cancel the train, so it's very useful.

I believe such moves are scheduled each day as well (probably for route knowledge retention)
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,664
I think of these electrified spurs like the stunted motorway sliproads that were built

As an example, the M1 north of Sheffield has a restricted junction (35A), but you can see (at the top of the image) where the sliproads were started in case funding were found to complete the missing parts:

https://maps.google.co.uk/maps?q=Th...+Hesley,+South+Yorkshire,+United+Kingdom&z=17

I live 2 minutes away from junction 35a and have noticed that! (although i have only ever used that bit of motorway once) Northbound we go to 36 southbound 35a so that short section never gets used.
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,237
Many of the examples above are indeed to handle accidental mis-routings of electric trains, so they can either be brought to a stand in time or to avoid the damage that might happen to the main wiring if the pantograph runs off the side.

However, there have also been varying design standards for this over time; the most substantial seemed to be the first stages of the WCML electrification around 1960, around Liverpool/Manchester, which wired up significant amounts of sidings and spurs, quite a lot of which was possibly never used. Later stages of this electrification were much more economical in design. The large marshalling yard at Crewe Basford Hall was fully wired all tracks, even though electric locomotives never penetrated over much of it, only diesel shunters being used. We once calculated that the total mileage of unnecessary wiring in there would have gone much of the way to wiring from Crewe to Kidsgrove, which would have been of considerable value.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
I live 2 minutes away from junction 35a and have noticed that! (although i have only ever used that bit of motorway once) Northbound we go to 36 southbound 35a so that short section never gets used.

I can't see the "missing link" being that well used if they did build it (since traffic from Leeds/ Barnsley towards High Green/ Sheffield would continue to use 36, as you do), but presumably they decided that it was easier to put half a sliproad in place rather than starting from scratch should the money ever be found.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,616
Location
Nottingham
Even if the wired section is not long enough for the train to stop, it gives a bit more time for the driver to realise there is something wrong and lower the pan.

If a train is misrouted and is going too fast to stop and the driver doesn't lower the pan, then having the whole junction wired probably means the pan runs off the end of the OLE and rises up until either the overheight sensor trips or it hits a bridge. Either way the train need dragging back but there is no damage to the OLE.

If only the tracks intended for use by electrics were wired, then for example turning right at a double junction the wire would go off the end of the pan as it left the first electrified track, and the pan would start to rise and hook itself into the catenary above the diamond. This would almost certainly bring down the OLE above the diamond, leaving the whole area unusable until the mess is cleared up.
 

sprinterguy

Veteran Member
Joined
4 Mar 2010
Messages
11,567
Location
Macclesfield
I believe there is electrification just south of Carlisle on towards the S&C. Though not used regularly, I understand (from reading here) that it is sometimes used to shunt Pendos out of the way during disruption in order to free up platform space at the station.
The shunt neck that runs down the bank towards London Road junction from Carlisle station is electrified, however I don't think that the parallel single line that leads to the S&C and Tyne Valley lines is.
 
Last edited:

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
As an example, the M1 north of Sheffield has a restricted junction (35A), but you can see (at the top of the image) where the sliproads were started in case funding were found to complete the missing parts:

https://maps.google.co.uk/maps?q=Th...+Hesley,+South+Yorkshire,+United+Kingdom&z=17

Off topic for this board, but there were stubs there, both north- and south-facing, from when the M1 was first built. The present A616 and junction 35A came 15 or 20 years later, as the A suggests. The junction used the south-facing stubs (probably subtly changing their alignment) and left the north-facing ones untouched.

There's conflicting evidence on the question of whether the original stubs were for a never-built service area, or for the never-completed M67 from Manchester, or both.

As the Stocksbridge bypass and link (the present A616) was eventually built as a non-motorway (though roughly where the motorway would have been), it was OK to build it with a junction where it crosses the A61, so there was no need to complete the north-facing slip roads as the A61 provides a more direct route.

This has all been discussed on the SABRE forums.
 
Last edited:

joeykins82

Member
Joined
24 Jul 2012
Messages
601
Location
London
Ultimately if a section of OLE is connected to another section then, by definition, it isn't useless. Whether it be a diversionary route, for infrastructure protection or just for future planning for if/when the currently-unwired route out of a junction gets electrified it cannot be considered useless.
 

Oswyntail

Established Member
Joined
23 May 2009
Messages
4,183
Location
Yorkshire
...
If a train is misrouted and is going too fast to stop and the driver doesn't lower the pan, then having the whole junction wired probably means the pan runs off the end of the OLE and rises up until either the overheight sensor trips or it hits a bridge. Either way the train need dragging back but there is no damage to the OLE. ...
I recall in the early days of St Pancras electrification a 317 pootling off onto an unelectrified stub at the station throat on the west side, and giving an overhanging structure (signal cabin?) an undignified poke. [Tried to fond a picture - failed - but the selection I was offered did include a cyclist wearing nothing but a sou'wester!]
 

alex17595

Member
Joined
15 Mar 2013
Messages
1,159
Location
Burton on Trent
There is a small section in the derby depot I believe.

Not useless but on some station (Preston or Lancaster) where only a part of some platforms are electrified. seems quite pointless.
 

455driver

Veteran Member
Joined
10 May 2010
Messages
11,329
Where 2 electrified lines run into a 6 coach platform you will need 6 sets of overhead wires (one for each platform), 2 will be on the incoming lines and 4 will have to start somewhere, they cant all start at the same place because the weights would interfere with each other and would probably pull the stanchion over. So where there is a non electrified line they will start one (or possibly 2) on there so the stresses are spread over a number of stanchions, it might mean putting up a few stanchions that are not really necessary but it is cheaper to do it that way than keep having to repair the other stanchions.

There is also an element of truth in electrifying a short section just in case of an oops moment.

I wont mention the short section of non electrified line at Birmingham New Street that electric locos used to coast over by lowering their pantographs so they could access the loco holding sidings. ;)
 

Darren R

Established Member
Joined
26 Jan 2013
Messages
1,252
Location
Lancashire
The switch occurred in December 2008 when Hazel Grove services were extended to Preston. The surplus 323s as a result of this were used to extend the Manchester Piccadilly - Macclesfield service to Stoke.

It was the opening of the Windsor Link that knocked electric services on the head. GMPTE paid for the wires to go up from Edgley Junction to Hazel Grove in 1981 - the edge of their jurisdiction and also to improve journeys to Stepping Hill Hospital. Services were hourly through to Altrincham via Piccadilly, with an extra hourly shuttle at peak times from Picc. When the Windsor Link opened fully (with the May 1989 timetable) and service patterns were recast, Buxton got an half-hourly service from Piccadilly, one all-shacks and one semi-fast. This was when Hazel Grove lost its regular electric services. EMUs have been infrequent and irregular ever since.
 

Peter Mugridge

Veteran Member
Joined
8 Apr 2010
Messages
17,805
Location
Epsom
There is a long bit of 3rd rail over-run protection west of Basingstoke on the Salisbury line as well; I believe that despite it being quite a long section a unit still managed to get stranded off the juice once...
 

Eagle

Established Member
Joined
20 Feb 2011
Messages
7,106
Location
Leamingrad / Blanfrancisco
I can't see the "missing link" being that well used if they did build it (since traffic from Leeds/ Barnsley towards High Green/ Sheffield would continue to use 36, as you do), but presumably they decided that it was easier to put half a sliproad in place rather than starting from scratch should the money ever be found.

Actually, M1 J35a isn't abandoned sliproads, it's an abandoned service area site from when the M1 first opened in 1968. The connections for it were reused when J35a opened in 1989.

There are a lot of planned service areas which were provided for bt never got biult, mainly because motorway planners in the 1960s thought that drivers would need a lot more services than they do currently.
 