• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Unusual DMU combinations in Scotland

Status
Not open for further replies.

Transilien

Member
Joined
10 Mar 2024
Messages
746
Location
Ayrshire
Has there ever been an occurrence of a say- class 158 and 156 or 156 and 170 being coupled for passenger service in Scotland? I have only ever seen the class 158 and 170 being coupled together before.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,313
Location
Glasgow
Has there ever been an occurrence of a say- class 158 and 156 or 156 and 170 being coupled for passenger service in Scotland?
156 and 158 combos have operated on the Highland Main Line previously.

I don't think 156 + 170 have operated in passenger service due to certain systems not being compatible, hence such multi workings are ECS only.
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,795
Location
West of Andover
I would imagine, back before Shotts got wired, a 156 would have worked with a 158 to be a 4 coach train.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,640
Location
Hampshire
156 and 158 combos have operated on the Highland Main Line previously.

I don't think 156 + 170 have operated in passenger service due to certain systems not being compatible, hence such multi workings are ECS only.
I have a feeling 156+170 combinations were at one point possible as, as a young child used to growing up in the south west, I was more interested in travelling in the then fairly new Turbostar into Edinburgh from Bathgate than the ancient 156 on the front :lol:

(I’m glad I’ve learnt what taste is now and would rather have taken the sprinter now).

Can also confirm 156+158 combinations were and are still possible - one was working the Anniesland services recently.
 

RiverDon

On Moderation
Joined
11 Mar 2024
Messages
297
Location
UK
I don't think 156 + 170 have operated in passenger service due to certain systems not being compatible, hence such multi workings are ECS only.

I've just had a look in the Scotrail 170 manual and train working instructions and there's nothing saying that they can't work together in passenger service. It wasn't mentioned on the traction training course either.
 

Bevan Price

Established Member
Joined
22 Apr 2010
Messages
8,335
Back in the days of Central Trains, 158+170 combinations were fairly commn on Liverpool-Nottingham (for Norwich) workings, but I don't remember seeing any 156+170 combinations. Of course, coupling a 75mph unit (156) to a 100mph (170) unit whilst technically possible, it would not be very desirable.
 

route101

Veteran Member
Joined
16 May 2010
Messages
12,281
I have a feeling 156+170 combinations were at one point possible as, as a young child used to growing up in the south west, I was more interested in travelling in the then fairly new Turbostar into Edinburgh from Bathgate than the ancient 156 on the front :lol:

(I’m glad I’ve learnt what taste is now and would rather have taken the sprinter now).

Can also confirm 156+158 combinations were and are still possible - one was working the Anniesland services recently.
The only time I seen a 156 and 170 working together was the day of the Leuchars Airshow 2004.
Was surprised to hear a Class 158 leave Glasgow Central the other week.

What about 6 car 158 workings? Are any booked?
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,313
Location
Glasgow
I've just had a look in the Scotrail 170 manual and train working instructions and there's nothing saying that they can't work together in passenger service. It wasn't mentioned on the traction training course either.
Fair enough, I thought the PIS wasn't compatible or something to door with the door control wasn't compatible, so ECS was fine but not passenger service.

I think it did come up recently enough in another thread.

== Doublepost prevention - post automatically merged: ==

I have a feeling 156+170 combinations were at one point possible as, as a young child used to growing up in the south west, I was more interested in travelling in the then fairly new Turbostar into Edinburgh from Bathgate than the ancient 156 on the front
Interesting, I didn't think 156s operated Bathgate.

It being 150s, then 158/170 until the A2B project was completed.

== Doublepost prevention - post automatically merged: ==

What about 6 car 158 workings? Are any booked?
Not sure about booked, but I've seen a couple of triple sets this year. Mostly on HML services.
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,292
156s coupled to 170s was a pretty common sight with Central Trains. In fact I have a memory of seeing a ‘Centro’ Class 150/2 coupled to a 170 at Long Eaton on its way from Nottingham to Birmingham. Of course back then the only 156s with any form of digital PIS were in Scotland, so maybe it was different up there.
 

Trainman40083

Established Member
Joined
29 Jan 2024
Messages
4,632
Location
Derby
Back in the days of Central Trains, 158+170 combinations were fairly commn on Liverpool-Nottingham (for Norwich) workings, but I don't remember seeing any 156+170 combinations. Of course, coupling a 75mph unit (156) to a 100mph (170) unit whilst technically possible, it would not be very desirable.
I remember the off Class 156/158 combination around Derby. The driver would be reminded that although he was driving a 90mph unit, it was attached to a 75mph unit.
 

stadler

Established Member
Joined
5 Jun 2023
Messages
3,304
Location
Horsley
Has there ever been an occurrence of a say- class 158 and 156 or 156 and 170 being coupled for passenger service in Scotland? I have only ever seen the class 158 and 170 being coupled together before.
Yes all of those have happened. Scotrail have run 156 + 158 and 156 + 170 and 158 + 170 formations. I will see if i can find the photos as i have definitely seen some.
 

HighlandStorm

Member
Joined
27 Sep 2024
Messages
169
Location
Inverness
Yes all of those have happened. Scotrail have run 156 + 158 and 156 + 170 and 158 + 170 formations. I will see if i can find the photos as i have definitely seen some.
I’ve certainly been on a 156 with a 170 attached on the Inverness - Aberdeen line. This might well have been the small overlap between 170s arriving and 158s displacing 156s from the North lines?

I’m also pretty sure back in the day ScotRail run 2 car trains that were part 156 and part 158!? I don’t think I imagined / dreamt / hallucinated it !
 

Bayum

Established Member
Joined
21 Mar 2008
Messages
3,297
Location
Leeds
Back in the days of Central Trains, 158+170 combinations were fairly commn on Liverpool-Nottingham (for Norwich) workings, but I don't remember seeing any 156+170 combinations. Of course, coupling a 75mph unit (156) to a 100mph (170) unit whilst technically possible, it would not be very desirable.
Very much depends on whether they worked lines that would get up to 100mph in the first place.
 

stadler

Established Member
Joined
5 Jun 2023
Messages
3,304
Location
Horsley
I’ve certainly been on a 156 with a 170 attached on the Inverness - Aberdeen line. This might well have been the small overlap between 170s arriving and 158s displacing 156s from the North lines?

I’m also pretty sure back in the day ScotRail run 2 car trains that were part 156 and part 158!? I don’t think I imagined / dreamt / hallucinated it !
Yes there were some weird two coach hybrid 156 + 158 formations years ago.

JPC_158653_Doncaster_151092.jpg

Central Trains certainly had some and i think you are correct that Scotrail did too.
 

stadler

Established Member
Joined
5 Jun 2023
Messages
3,304
Location
Horsley
A video showing both a Scotrail 153 + 156 + 158 formation and a Scotrail 153 + 156 + 170 formation:


A video showing a Scotrail 156 + 158 formation:


A video showing a Scotrail 156 + 170 formation:


A video showing a Scotrail 156 + 158 formation:


A video showing a Scotrail 156 + 170 formation:


It seems like these are all still fairly common to find at least on the ECS moves.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,640
Location
Hampshire
Fair enough, I thought the PIS wasn't compatible or something to door with the door control wasn't compatible, so ECS was fine but not passenger service.

I think it did come up recently enough in another thread.

== Doublepost prevention - post automatically merged: ==


Interesting, I didn't think 156s operated Bathgate.

It being 150s, then 158/170 until the A2B project was completed.

== Doublepost prevention - post automatically merged: ==


Not sure about booked, but I've seen a couple of triple sets this year. Mostly on HML services.
Come to think of it, it could have been a 150 / 170 combination. I was about 9 at at the time and not long after my grandparents had moved up there. I do recall that the SPT ordered Turbostars did frequent the Bathgate line quite a lot, whilst SPT 156s frequented the Shotts services.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,313
Location
Glasgow
Come to think of it, it could have been a 150 / 170 combination. I was about 9 at at the time and not long after my grandparents had moved up there. I do recall that the SPT ordered Turbostars did frequent the Bathgate line quite a lot, whilst SPT 156s frequented the Shotts services.
The 150s were replaced by the second batch of Suburban 170s, which weren't SPT-sponsored and thus were intended, at least, for Edinburgh area/Fife services.

Shotts seemed to be pretty solidly 156 until the additional semi-fast services were added, doubling the lines frequency. Then 158s appeared. Otherwise 158s seemed more common on Whifflet services for some reason.
 

stadler

Established Member
Joined
5 Jun 2023
Messages
3,304
Location
Horsley
I would also be curious if anyone has any photos of Scotrail running 150+156 and 150+158 and 150+170 formations as these must have happened multiple times back then.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,313
Location
Glasgow
I would also be curious if anyone has any photos of Scotrail running 150+156 and 150+158 and 150+170 formations as these must have happened multiple times back then.
150+156 definitely happened, I've seen a pic of such a combo on a morning (0922?) Glasgow QS to Aberdeen train in 1990, when the Glasgow-Aberdeen services were briefly booked for 156s.
 

stadler

Established Member
Joined
5 Jun 2023
Messages
3,304
Location
Horsley
150+156 definitely happened, I've seen a pic of such a combo on a morning (0922?) Glasgow QS to Aberdeen train in 1990, when the Glasgow-Aberdeen services were briefly booked for 156s.
I imagine it was probably quite common back then as they both ran in the same area and were based at the same depots.

No photos of 150+156 or 150+158 but i have managed to find two photos online of 150+170 formations that Scotrail ran.

309.jpg

32207760980_6f55e8d7eb_b.jpg

I remember these 150+170 formations happened sometimes at Central Trains and London Midland too.
 

EnchantGaming

Member
Joined
24 Nov 2022
Messages
48
Location
Edinburgh
What about 6 car 158 workings? Are any booked?

2T68 10:11 Edinburgh to Tweedbank on a Sunday only, is booked as a 6 car 158. A 6 car 158 comes in empty from Haymarket Depot at 08:43, then runs ECS to Platform 1 or 20. However, this diagram has run as a 6 car Turbostar in the past. Depending on which 158's are available.
 
Last edited:

CarrotPie

On Moderation
Joined
18 Mar 2021
Messages
1,128
Location
‎
I don't think 156 + 170 have operated in passenger service due to certain systems not being compatible, hence such multi workings are ECS only.
I've just had a look in the Scotrail 170 manual and train working instructions and there's nothing saying that they can't work together in passenger service. It wasn't mentioned on the traction training course either.
My British Railways Pocket Book says that 170s can work in multiple with all Sprinter classes (even 150s), so that makes sense.
 
Joined
27 Sep 2018
Messages
173
What about 6 car 158 workings? Are any booked?
There was a 6 car 158 working vice HST on an Edinburgh - Aberdeen - Inverness - Edinburgh diagram the other week.

Maybe it happened regularly years ago but I have never seen this formation on the Highland mainline before, it has been done fairly recently from Edinburgh to Aberdeen and over the top to Inverness though.

I ended up on the Inverness to Edinburgh service, it had to skip the stop at Dunkeld due to 6 cars not being risk assessed for the new platforms. Which was odd because I thought that only applied to 2x 170 because there’s no gangway between the units.

I’ve attached a photo of it at Pitlochry
 

Attachments

  • IMG_5449.jpeg
    IMG_5449.jpeg
    3.6 MB · Views: 39

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,313
Location
Glasgow
There was a 6 car 158 working vice HST on an Edinburgh - Aberdeen - Inverness - Edinburgh diagram the other week.

Maybe it happened regularly years ago but I have never seen this formation on the Highland mainline before, it has been done fairly recently from Edinburgh to Aberdeen and over the top to Inverness though.

I ended up on the Inverness to Edinburgh service, it had to skip the stop at Dunkeld due to 6 cars not being risk assessed for the new platforms. Which was odd because I thought that only applied to 2x 170 because there’s no gangway between the units.

I’ve attached a photo of it at Pitlochry
The 1336-ish Edinburgh to Inverness was regularly booked 3 × 158 in the summer during First days to provide extra luggage and cycle space.

There was a balancing southbound working but I cannot recall what.
 

thealexweb

Member
Joined
5 Jan 2014
Messages
1,106
I remember the off Class 156/158 combination around Derby. The driver would be reminded that although he was driving a 90mph unit, it was attached to a 75mph unit.

Haha. This happened with Northern when a 158+142 combo got up to 90mph years ago.
 
Status
Not open for further replies.

Top