I recently made a journey from Edinburgh to Leeds which was my first time using the ECML north of York (and was then astounded that Northern had not cancelled any of the services I needed to get home from Leeds, but then I understand the service pattern of those) but this left me realising that I don’t have a clue how the ECML timetable works.
I was very disappointed to realise that between Newcastle and Leeds there are 2tph, with the TPE leaving 3 minutes after the XC most hours. Admittedly one continuing to Huddersfield, Manchester and Liverpool and the other to Wakefield, Sheffield (although this is not a satisfactorily efficient route from York, or even Leeds to Sheffield), Birmingham etc differentiates them, but could there have been any less of an attempt for them to be evenly spaced?
Most services from York of course continue to Doncaster and onto Kings Cross so as a starting point, how many paths out of Kings Cross are there, both now and as a few years ago, as several things have happened recently to increase this, including Kings Cross remodelling, Stevenage diveunder, Down Cambridge flyover, the Werrington diveunder and GN&GEJR resignalling, with the main bottleneck remaining being Newark flat crossing.
So the core LNER service is Kings Cross to Leeds and Edinburgh with various extensions, both of which I believe are 2tph, but there are then the open access services of Hull Trains, Grand Central and Lumo, on top of Thameslink, Great Northern and EMR Norwich services using the line at its southern end. LNER also serves Lincoln and I thought these went via Sleaford, but apparently that is not the case.
With various services leaving in Yorkshire, the service north of York is fundamentally different, with as I said XC and TPE joining LNER. There is also the Saltburn service leaving at Northallerton, Northern services crossing at Darlington and Newcastle and ScotRail using it towards Edinburgh.
I have also heard about issues regarding a new ECML timetable, but don’t actually know what these are or when this timetable is supposed to be introduced, including an LNER service to Middlesbrough which doesn’t seem to exist (I didn’t think it was possible to terminate at Middlesbrough, leading TPE to run to Redcar Central and then Saltburn). You may be able to tell that I am quite confused with the whole situation.
I was very disappointed to realise that between Newcastle and Leeds there are 2tph, with the TPE leaving 3 minutes after the XC most hours. Admittedly one continuing to Huddersfield, Manchester and Liverpool and the other to Wakefield, Sheffield (although this is not a satisfactorily efficient route from York, or even Leeds to Sheffield), Birmingham etc differentiates them, but could there have been any less of an attempt for them to be evenly spaced?
Most services from York of course continue to Doncaster and onto Kings Cross so as a starting point, how many paths out of Kings Cross are there, both now and as a few years ago, as several things have happened recently to increase this, including Kings Cross remodelling, Stevenage diveunder, Down Cambridge flyover, the Werrington diveunder and GN&GEJR resignalling, with the main bottleneck remaining being Newark flat crossing.
So the core LNER service is Kings Cross to Leeds and Edinburgh with various extensions, both of which I believe are 2tph, but there are then the open access services of Hull Trains, Grand Central and Lumo, on top of Thameslink, Great Northern and EMR Norwich services using the line at its southern end. LNER also serves Lincoln and I thought these went via Sleaford, but apparently that is not the case.
With various services leaving in Yorkshire, the service north of York is fundamentally different, with as I said XC and TPE joining LNER. There is also the Saltburn service leaving at Northallerton, Northern services crossing at Darlington and Newcastle and ScotRail using it towards Edinburgh.
I have also heard about issues regarding a new ECML timetable, but don’t actually know what these are or when this timetable is supposed to be introduced, including an LNER service to Middlesbrough which doesn’t seem to exist (I didn’t think it was possible to terminate at Middlesbrough, leading TPE to run to Redcar Central and then Saltburn). You may be able to tell that I am quite confused with the whole situation.