12CSVT
Established Member
- Joined
- 18 Aug 2010
- Messages
- 2,611
I have noticed something unusual about services on the Sunderland - South Hylton branch of the Metro system. One train per hour (xx13 departure from South Hylton) doesn't call at Millfield. As the Metro runs to a 12 minute frequency (off peak) throughout the system there doesn't seem to be any logic to one train per hour not calling at Millfield. Anybody on the forum know why ?