Isn't all the wiring (including looms and electrical fittings) being replaced too? Or have I just imagined having read that?
Yes it is (not sure if I mentioned that or not). However a lot of the wiring that was installed has been for the information screens, which was carried out before they left for Doncaster, so most of that will not need to be changed. There was also a programme for door modifications going on at the depot so again they shouldn't have needed much doing to them either.
As you can imagine a lot of the electrics on the Metrocars is obsolete (along with the equipment used to test them!)
--- old post above --- --- new post below ---
Next new ticket machines are going in at Tyne Dock.
There is also some discussion with various cycling groups at seeing how bicycles on the Metro can be re-introduced (or at least better facilities at Metro stations).
--- old post above --- --- new post below ---
Second one coming back from Doncaster is late apparently. Should have been back a few weeks ago (no surprise there).
Also, looks as if the Metro is on strike next week, so might be no services at all or we may see some interesting movements.
?