Hi All,

I was up in Newcastle last weekend and so took the opportunity to ride on as much of the metro as I could.

I was wondering why overhead cable was orignally chosen to supply the power rather than a 3rd rail system given that none of the system runs on street. The system leans more towards the London underground (especially in the city) than a light rail sytem. Surely 3rd rail would have been a cheaper option.

Anyone know the reasons behind this?


Every blessing,



Chris.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

1D53

Established Member
Joined
2 Apr 2006
Messages
2,892
3rd rail is now prohibited from new installations on the National network from what I recall.

Plus 142's arent allowed on third rail in normal conditions hence wouldnt mix between Heworth - Sunderland.
 

eezypeazy

Member
Joined
4 Jul 2005
Messages
626
Location
UK
Before construction of the Tyneside (as it was then) Metro began, there was considerable discussion about the type of electrification to be employed. 3rd rail was indeed "frowned upon", in that no new installations were to be approved. At one stage, operation of Metro was going to be undertaken by British Rail, but they were apparently insisting that the system be built to their OHLE standards - ie., 25Kv AC! This would have resulted in the bore of the tunnels through Newcastle and Gateshead having to be much larger, to provide adequate electrical insulation, and the rolling stock would require additional (and heavier) equipment. (BR were also insisting on 4 aspect signalling, which, on a system designed for a two and a half minute headway and top speed of 50mph, would have been extremely expensive and definitely "over the top" - you would always be driving on yellow aspects through the tunnels! PTE engineers, on the other hand, wanted tramway-style "drive on sight" outside of tunnels and junctions. I believe the HSE/Railway Inspectorate insisted on the two/three aspect compromise). After much discussion between PTE, British Rail, and the unions, the PTE decided that BR's demands were impractical and would have added huge additional (and unnecessary) cost, and that they would operate the system themselves, promising that it would employ otherwise redundant BR and bus men.

Additionally, the system was designed with the potential for street running. At St. James, the tunnels continue a short distance beyond the platform ends, and can (relatively) easily be extended to the surface to gain the streets of the west end of Newcastle.

So that's why we ended up with 1500v dc.

Regards

eezypeazy
 

gordonthemoron

Established Member
Joined
4 Sep 2006
Messages
6,727
Location
Milton Keynes
The north tyneside loop, which was replaced by the Metro, was third rail from between the wars until the 60's I believe.
 

Metroland

Established Member
Joined
20 Jul 2005
Messages
3,212
Location
Midlands
Indeed it was. in fact the first 3rd rail electic trains were in Tyneside, not on the southern.

The main disadvantage of third rail is ice on conductor rails and frequent feeder stations, overhead is usually a good system if you don't have to raise bridges.

With 1500v DC, the clearances allowed are much tighter than 25kv, which is a French system, designed for the larger loading gauge but that system does allow more juice to be piped to the trains. That's not important with a light weight low speed metro system, hence why 1500v DC was chosen.
 

Mojo

Forum Staff
Staff Member
Administrator
Joined
7 Aug 2005
Messages
21,190
Location
0035
Traditional third rail is not now allowed for any new installations, except approved extensions, but a protected low-level rail *is* allwowed - see DLR for example.
 

metroman

New Member
Joined
1 Mar 2008
Messages
1
Hi,
I have actually just joined this forum, and I actually work on the Tyne and Wear Metro System. Yes, 3rd rail power is now not allowed. The Sunderland Extension was actually built to Network Rail specs, but obviously they had to keep to 1500 vdc as the power. I work on Station Services, Lifts and Escalators etc. If anyone needs to know anything about the system I am that person to answer any questions.
Martin
 

robertclark125

Established Member
Joined
12 Mar 2008
Messages
1,650
Location
Cardenden, Fife
One issue with third rail as well was that the type of cars to be used would prevent third rail. Many people think that the walkways in the tunnels prevented 3rd rail. This is not the case, as the jubilee line extension has them, and has 4th rail power.
 