It will probably be bought into use when Rainham box is resignalled into the ROC next year
I hope we get an improved service from Rainham as a result of the work sometime.
As I used to live in Rainham I find this very interesting. Is the turn back platform on the opposite face of the up or down platform?
Opposite face of the up platform. Starts just after the station building and is 12 cars long so extends a little past the current up platform. There are facing points just after the station so that it can be accessed from the down. Also a signal installed on the up platform at the country end for trains departing in the down direction.
Thank you. Also reading above, I thought Rinham box closed years ago and was operated from Gillingham.
The whole signalling possession / commissioning this Easter is cancelled - but the block will continue to do other works right through the Medway ....
How's the new Rochester station coming along just down the road? Surprised to see it should be open by December but googling brings up very few images.
Cheers brilliant reply, that's just what I was looking for!
So no commissioning means no services using platform 0 then at Rainham from May? Realtimetrains backs this up with nothing shown. What services were due to stop there - semi-fasts from Gillingham extended one stop down?
Thanks for the interesting responses. It does seem an awfully expensive facility to keep just for engineering works and emergencies.
I hope we get an improved service from Rainham as a result of the work sometime.
Wonder how they would do that!
Isn't there a long term aim to extend Medway Valley line trains to Gillingham? That's what a guard said.
What were you wondering about? Platform capacity at Strood being tied up by the reversals? Too many trains through Rochester Bridge Junction?
How they would do it, and where they would reverse mainly.
The fact there is no crossover or pointwork from platform 3 (Maidstone platform) to reverse down to Rochester. You could stick it in 2, but the reversal, then crossing over to the down line would then clog up 2 platforms while that happens.
And from my memory of strood the lack of space to put the crossover, and the fact they have just put the new bridge in where the points could of been perhaps States there is no plan to put points on. Unless you have a flying junction from the Maidstone side of the station up towards Rochester Bridge junc, but you would still cross the Up line towards Victoria, and that would be an expensive option for no real benefit.
Or perhaps, have the Maidstone lines flyover toward Rochester, and completely cut out strood altogether, but that's dreaming a bit too much perhaps?
A direct rail link between the county town of Kent (Maidstone) and the Medway Towns would surely be a desirable thing - it bugged me when I worked in Kent, based in Maidstone but having to travel throughout the county, that though my office was near Maidstone West it was almost always quicker to get to Chatham or Gillingham by getting the 101 bus, 'connections' at Strood on the train being into London-bound services. On the other hand, there were always many who wanted a direct service from the Medway Valley stations to Dartford and London and you can't please everyone!