• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Tunnels

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Harlesden

Member
Joined
23 Jun 2010
Messages
968
Location
LONDON NW10
Although Hertford North is further (from Bowes Park) it is actually a cheaper fare than Bayford. So orft we jolly well go to Hertford North tomorrow.
Doc1-page-001.jpg

Doc2-page-001.jpg
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,243
The tunnel or bridge distinction is related purely to the length, not the construction method, I was always told this was because the rules for protection are different.

IIRC there is a set length of about 50 yards (or is it metres?) above which any bridge is named as and treated as a tunnel for rule book purposes.
 

Trog

Established Member
Joined
30 Oct 2009
Messages
1,546
Location
In Retirement.
Structures to be treated as tunnels in relation to the rules are those listed as such in the Sectional Appendix. Regardless of length, name or construction.

The length bit comes in for bridge inspection by the Civil Engineer, structures under 2 chains in length usually bridges (exact length may differ over time and between different railway companies) are inspected as one item. Longer structures are inspected in sections, most structures inspected this way are tunnels, so for inspection if it is over 2 chains long it is a 'tunnel'.

For strict engineering useage if it is dug through something it is a tunnel, if it is built over something it is a bridge, and if you build a structure then bury it you have a covered way.
 

unlevel42

Member
Joined
5 May 2011
Messages
596
Some decent tunnel journeys.
For a journeys in a proper long tunnel (1 mile plus)through a hill:
What % of the journey from Grindleford to Dore is in a tunnel?
Totley Tunnel is 5,700m (6230 yd) long.

For journeys in proper long tunnels (1 mile plus)through hills and at speed:
What % of the journey from Sheffield to Stockport is in a tunnel?
Totley Tunnel is 5,700m (6230 yd) long.
Cowburn Tunnel 1,776m (1942 yd) long.
Disley Tunnel 3535 (3,866) yd
 
Status
Not open for further replies.

Top