SandsofEss
Member
- Joined
- 11 May 2014
- Messages
- 251
Railways Africa is reporting passenger rail service has resumed this week between Tunis and Annaba, after a 30 year hiatus.
Three times a week in each direction, with modern rolling stock.
Full story here.
Excellent news, especially given the recent thread lamenting the partial demise of the Tazara route.
EDITED: to add direct quotes per forum rules.
Three times a week in each direction, with modern rolling stock.
The first commercial train services on the Tunis-Annaba line will start on August 11 from Tunis and on August 13 from Annaba.
The Tunis-Algeria railway line (TA line) stretches 216.6km from the Tunisian capital to the Algerian border and approximately 357km to Annaba. Operating on a standard 1435 mm gauge, trains can reach a maximum speed of 130 km/h.
The train’s composition includes a locomotive, four passenger coaches (two first-class and two second-class), a baggage coach, a service coach and a power coach.
Trains depart from Annaba to Tunis on Sundays, Tuesdays and Thursdays.
Trains depart from Tunis to Annaba on Mondays, Wednesdays and Fridays.
Full story here.
Excellent news, especially given the recent thread lamenting the partial demise of the Tazara route.
EDITED: to add direct quotes per forum rules.
Last edited: