"Harrogate Chamber" have posted on the rail news article. This is what they have posted.
So they're suggesting that four major viaducts and Bramhope tunnel will need to be "rebuilt" unlike with every other OHL electrification scheme.
It will be run by standard metro cars, even though they will have been replaced from elsewhere in the country, and even then they won't have the standard pick up.
Maintaining ten units as spare just for this route will be better value for money over the long term than having units which are intersperseable with the rest of the local network to be swapped around as necessary.
Hmmm. If I were them, I would concentrate on the longer term strategy to overcome capacity constraints to start off with then press for a more suitable electrification scheme.
All the while, in other news we have perfectly sensible extensions of the third rail network which are turned down as not value for money whilst at the same time being told that there is apparently no future for DC third rail on the Southern Region which has been running slow and express trains largely successfully for nearly a century and which will presumably have to be replaced with OHLE at the farepayers expense.
. And then they are wanting to convert/maintain *twenty* old trains for this line - thats going to make thing even more expensive.