Network Rail/Railtrack welded the rails over the bridge making it impossible to swing for many years. It was deemed far far cheaper to pay fines to the river authority for lack of navigation than it was to TOCs for delayed or cancelled trains.To put a fixed bridge in position will require an Act of Parliament to close the river to navigation as they had a temporary closure via an Act of Parliament when they installed the present bridge. I always remember someone saying that the contractors never took away there site huts as they was always back on site trying to make it work properly.